The Crane Operator strike and the Carpenter strike are going to kibosh pretty much every construction process except excavation. I was really looking forward to seeing the city grow all summer. Hopefully it's all resolved soon!
Crane Operators are a big part of the major excavations in this city. We can expect delays on that too.
I was hoping ZIBI was immuned to this type of architecture.
If they could add on the tower some of the wood elements seen in the podium, it would make a big difference I think. It is just missing something, it currently just looks so blend.
I'm going to guess existing residents will fight Block 202 - "you're blocking access/shadowing the park!!"
If they do fight, it might be on the grounds that Zibi is increasing heights and density in relation to what was originally sold to the public (and buyers). I can understand to a certain degree.
What are those three pod-type things on the bottom left?
Hydrapulper is a circular tank that contains water in which bales of waste paper are loaded for pulping process. The hydrapulper pulping system is equipped with a high-strength agitator fixed at the bottom of the pulper that helps to break the paper bales into smaller pieces.
Hydrapulper is a circular tank that contains water in which bales of waste paper are loaded for pulping process. The hydrapulper pulping system is equipped with a high-strength agitator fixed at the bottom of the pulper that helps to break the paper bales into smaller pieces.