Quote:
Originally Posted by jollyburger
|
Link didn't work for me ("server not found").
I watched the Vancouver City Centre station box being excavated over a period of several months. The southbound tunnel had already been bored and the tunnel liner was in place and had to be broken apart. The northbound tunnel wasn't bored until the excavation was complete.
I have photos of this but, alas, this board doesn't allow me to upload them and I don't have a third-party hosting site.