Old Posted Apr 26, 2022, 10:18 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
Quote:
Originally Posted by jollyburger View Post
They couldn't make it a little wider?
Just bring your shoe horn if you are driving beside a bus.
Reply With Quote
     
     
  #1282  
Old Posted Apr 26, 2022, 10:36 PM
idunno idunno is offline
Registered User
 
Join Date: Feb 2010
Posts: 944
Quote:
Originally Posted by jollyburger View Post
They couldn't make it a little wider?
It's only half the traffic deck remember! Excavation for the other half is underway.
Reply With Quote
     
     
  #1283  
Old Posted Apr 26, 2022, 10:45 PM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Posts: 4,180
Quote:
Originally Posted by idunno View Post
It's only half the traffic deck remember! Excavation for the other half is underway.
It's not 50/50 halves, all the traffic decks are four thru lanes and some with a left turn lane.
Reply With Quote
     
     
  #1284  
Old Posted Apr 26, 2022, 10:48 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,703
Quote:
Originally Posted by idunno View Post
It's only half the traffic deck remember! Excavation for the other half is underway.
I don't think so.

Reply With Quote
     
     
  #1285  
Old Posted Apr 27, 2022, 4:06 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,628
At least around Main St. it looks like they will access the underground space via Quebec (and I guess the station pit). But who knows.
Reply With Quote
     
     
  #1286  
Old Posted Apr 27, 2022, 4:33 PM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Posts: 4,180
Quote:
Originally Posted by WarrenC12 View Post
At least around Main St. it looks like they will access the underground space via Quebec (and I guess the station pit). But who knows.
There's an emergency exit and tunnel vents along Quebec on both sides of Main, maybe it's for these.
Reply With Quote
     
     
  #1287  
Old Posted Apr 27, 2022, 5:27 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,628
Quote:
Originally Posted by madog222 View Post
There's an emergency exit and tunnel vents along Quebec on both sides of Main, maybe it's for these.
Oh that makes sense, thanks.
Reply With Quote
     
     
  #1288  
Old Posted Apr 27, 2022, 8:28 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
Quote:
Originally Posted by Nicholas Hui View Post
If you go to YouTube, the latest video about the Broadway Subway station construction was on April 17, 2022. These YouTube videos were uploaded by Hello World
https://www.youtube.com/channel/UCejV4_r5385FqramJNitP0Q/videos

is the link I think. Some good long-run walk about videos of each station from April 17th and previous sets from earlier dates.
Reply With Quote
     
     
  #1289  
Old Posted May 1, 2022, 5:48 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888























Also across the street in the last pic, Onni's 375 E 1st Ave has started up again - https://www.onni.com/wp-content/uploads/2017/04/20180510-Lot-P-Retail-Brochure.pdf

Photo source: me

Emily Carr station and area. Sun glare in the first one over by the Tim Horton's. Column work progressing but hasn't reached ground level yet. Plexiglass glare in a few others. I would have preferred they used the standard wire mess on the fence viewing ports. Crane installed. Good amount of concrete poured.
Reply With Quote
     
     
  #1290  
Old Posted May 2, 2022, 11:49 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,705
Nice shots, thanks!
Reply With Quote
     
     
  #1291  
Old Posted May 3, 2022, 12:17 AM
superelevation superelevation is offline
Registered User
 
Join Date: Oct 2020
Posts: 50
Quote:
Originally Posted by jollyburger View Post
The only problem in that scenario is that they would still need to do all the geotechnical work for the tunnel and not sure if they can do it without the station blocks pre-built or not.

You assume that they will build out the system to accommodate the extension without any long-term disruptions at Arbutus (I think that's why they've mentioned the Jericho Lands as the staging ground for the TBMs)
It's absolutely possible, for both stages of Torontos Line 5 and for the Extension of Line 2 the tunnels were entirely built before the station boxes were built. The TBMs and tunnels are in fact an entirely different contract.
Reply With Quote
     
     
  #1292  
Old Posted May 3, 2022, 1:53 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,789
Quote:
Originally Posted by superelevation View Post
It's absolutely possible, for both stages of Torontos Line 5 and for the Extension of Line 2 the tunnels were entirely built before the station boxes were built. The TBMs and tunnels are in fact an entirely different contract.
This was done on the Canada Line. Here's a photo of construction of the Vancouver City Centre station with the tunnels already in place, from Canada Line Photography:

Reply With Quote
     
     
  #1293  
Old Posted May 3, 2022, 5:10 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,703
Quote:
Originally Posted by aberdeen5698 View Post
This was done on the Canada Line. Here's a photo of construction of the Vancouver City Centre station with the tunnels already in place, from Canada Line Photography:

Yeah it doesn't seem to matter but I think the Canada Line station boxes or at least partial excavation pits were built prior to the first pass of the TBM.

https://www.tunneltalk.com/Canada-Line-March07-New-LRT-on-track.php
Reply With Quote
     
     
  #1294  
Old Posted May 3, 2022, 6:21 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,789
Quote:
Originally Posted by jollyburger View Post
Yeah it doesn't seem to matter but I think the Canada Line station boxes or at least partial excavation pits were built prior to the first pass of the TBM.
https://www.tunneltalk.com/Canada-Line-March07-New-LRT-on-track.php
Link didn't work for me ("server not found").

I watched the Vancouver City Centre station box being excavated over a period of several months. The southbound tunnel had already been bored and the tunnel liner was in place and had to be broken apart. The northbound tunnel wasn't bored until the excavation was complete.

I have photos of this but, alas, this board doesn't allow me to upload them and I don't have a third-party hosting site.
Reply With Quote
     
     
  #1295  
Old Posted May 3, 2022, 8:01 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,703
Quote:
Originally Posted by aberdeen5698 View Post
I watched the Vancouver City Centre station box being excavated over a period of several months. The southbound tunnel had already been bored and the tunnel liner was in place and had to be broken apart. The northbound tunnel wasn't bored until the excavation was complete.

I have photos of this but, alas, this board doesn't allow me to upload them and I don't have a third-party hosting site.
(can't link the images directly)

But 2017-02-15

http://www.seataf.com/blogs/canadaline/2007-02-15/images/KICX2830.jpg

2017-03-26

http://www.seataf.com/blogs/canadaline/2007-03-26/images/KICX4434.jpg

http://canadalinephotos.blogspot.com/sea...0Z&max-results=20&start=86&by-date=false

And

Quote:
Excavation and shoring work was completed in 11 months to establish a station box measuring 90 meters long, 20 meters wide and 15 meters deep. Following the first pass of the bored tunnel through the excavated site, construction of the station structure commenced.
https://thecanadaline.com/station-history/vancouver-city-centre/
Reply With Quote
     
     
  #1296  
Old Posted May 4, 2022, 3:25 PM
madog222 madog222 is offline
Moderator
 
Join Date: Jan 2014
Posts: 4,180
The traffic deck at Granville is now is service with 4 lanes.
Reply With Quote
     
     
  #1297  
Old Posted May 10, 2022, 9:10 PM
GenWhy? GenWhy? is offline
Registered User
 
Join Date: Jun 2017
Posts: 4,826
10.9.7 For development at 145 East Broadway, provision of a secondary station entrance to Mount Pleasant Station is strongly encouraged. At a minimum, the secondary station entrance should provide an up escalator as well as an elevator as a part of the overall vertical circulation provision. The secondary station entrance should be overbuilt and integrated within the development.
https://council.vancouver.ca/20220518/do...2762560.1652120922-1850296053.1622045233
There, the COV made some nerds happy.
Reply With Quote
     
     
  #1298  
Old Posted May 10, 2022, 10:23 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,705
Quote:
Originally Posted by GenWhy? View Post
10.9.7 For development at 145 East Broadway, provision of a secondary station entrance to Mount Pleasant Station is strongly encouraged. At a minimum, the secondary station entrance should provide an up escalator as well as an elevator as a part of the overall vertical circulation provision. The secondary station entrance should be overbuilt and integrated within the development.
https://council.vancouver.ca/20220518/do...2762560.1652120922-1850296053.1622045233
There, the COV made some nerds happy.
Hey!
That's the Congee Noodle House site.
I don't think they ever reopened after the sinkhole in the back from the adjacent project.
Unless other adjacent sites are consolidated, that's a pretty small site to expect that level of public amenity contribution.

There's a mezzanine knock-out panel at that location (as well as one on the south side):


https://www.broadwaysubway.ca/mount-pleasant-station-image-gallery/

Last edited by officedweller; May 11, 2022 at 10:36 PM.
Reply With Quote
     
     
  #1299  
Old Posted May 17, 2022, 1:54 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,703
Hard rock.

Quote:
The Broadway Subway Project Corporation (BSPC) is in your neighbourhood building the Mount Pleasant Station. As part of the
excavation beneath the traffic deck, areas of hard rock are being uncovered and there will be elevated noise. Residents and
businesses in the area can expect intermittent concussive sounds and vibrations emanating from the site during the rock
breaking work between 7 a.m. to 11 p.m.
https://www.broadwaysubway.ca/construction/current-work/
Reply With Quote
     
     
  #1300  
Old Posted May 17, 2022, 3:22 AM
giallo's Avatar
giallo giallo is offline
be nice to the crackheads
 
Join Date: Apr 2002
Location: Vancouver
Posts: 12,727
I saw a massive boulder at the Main and Broadway site.

Last edited by giallo; May 17, 2022 at 4:29 AM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 1:13 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.