Quote:
Originally Posted by Rico Rommheim
Is there anyone here who's got the time to list the Gatineau u/c and proposals. I have the impression the the SSp diagram doesn't tell me the whole story.
And what ever happened to those two tacky 50+ floor buildings that were proposed a while ago?
|
Those are cancelled but the same developer, Brigil, has hinted that a building of 'up to 60 stories' will be proposed soon on the next lot over. I did a quick estimation of what that would look like below.
This is phase one of We 2. They are building one of the lower towers first. The taller towers were proposed at 33 floors but we are receiving mixed messages on that.
Le Colombia near the Casino is nearly finished
Le Viu 2 just wrapped up
In the foreground you have 401 Champlain at 12 floors u/c, in the back right you have 225 Laurier at 15 floors u/c and next to it is a proposal for 14 floors.
Aside from that there will be several towers built at Zibi in the near future and we are expecting a lot more proposals across downtown Gatineau as the market heats up.