Quote:
Originally Posted by gopokes21
Denver isn't poor, so it doesn't need to settle for BRT. I agree with you that Colorado Blvd is a mosh pit, but I just don't think more crap is the solution.
|
Here we go again. Yes, actually we do need to settle for BRT, we cannot afford (as a CITY) grade separated rail transit. We do not have the population and economic base to do it. It would have to be regional or state. (The region or state could afford a lot more.)
So take for comparison a new fee to construct sidewalks citywide, which you will soon see circulating for signature because we are proposing to put it on the November ballot by petition. The fee isn't small - about $100 for the average Denver home. That would generate about $40 million/year initially, escalating, or about $1.9 billion total over 30 years. (Which is on the low end of what's enough just to build and repair sidewalks.)
Take some of our best recent data points in the US for grade separated transit -
-Honolulu is about $600 million per mile, all elevated.
-NYC 2nd Avenue Subway was about $2.5 billion per mile.
-Austin is budgeting around $1 billion/mile for subway in tunnel, but nobody believes that number and it excludes all station costs.
Now back to Denver, our total general fund is $1.5 billion per year, but of that a lot is fees and such that are not available, so sale tax and property tax alone, call it right about $1 billion/year. Now, I assume we are not actually defunding the police ($567 million/yr) and we still want things like our parks department ($82 million/yr), planning department ($36 million/yr), etc. Let's just look at the Department of Transportation and Infrastructure - $140 million/year.
Then let's assume you double it! No idea where that money would come from, but just for fun. And cancel everything else DOTI does, I suppose, so I have $280 million/year to play with.
Pledge all of that - $280 million per year - you could bond about $4.6 billion. So say you need 60/40 capital/operations for a rail project, it means that Denver could buy just under $2.8 billion in capital costs.
So you could bond for maybe 1.5 miles of subway using Denver's entire DOTI budget, doubled. Call it 3 miles with federal grants. Or maybe 10 miles of elevated rail with reasonable assumptions for federal grants.
To be clear, my casual doubling of the DOTI budget amounts to about $350/year for your average Denver household in new taxes.
This compares to Honolulu - a 21 mile elevated rail system - that was $125 million/year just for operations, and the capital costs equal maybe $480 million/year. So that ONE RAIL LINE equals 16x the entire budget of Denver CPD each year. Just for comparison. That is why we struggle with large infrastructure projects in this country - most areas do not have the local tax bases to do it, and our federal money comes in irregular and unpredictable bursts (like the infrastructure bill).