The construction card for the project at 454 McLaughlin has just shown up on CCD Canada:



Quote:
MCLAUGHLIN COMPLEX

CCD Ref. Number : NB165257-22-02

Stage : 3-Planning or drawing

Published : February 3, 2022

Starting Date (estimated) : Not available

Size : Mid-sized ($7,650,000)

Work type : New construction

Sector : Private

Category : 4-Residential

Subcategories : 4C-Multi Housing

Disciplines : ARCH, ELEC, EQUI, HVAC, MEC-B, STRUC, OTHER*

Location :

MONCTON (NB)
(Moncton - Richibucto)

Description :
NEW APARTMENT BUILDING -
Located in Moncton, 454 McLaughlin Dr., this project (McLaughlin Complex) estimated at $7 650 000 is in the planning stage. Works concern the construction of a 64-unit residential building.

- Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1922  
Old Posted Feb 9, 2022, 8:53 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,111
New proposal for Leopold Belliveau Drive:

Quote:
Amico Construction on behalf of/au nom de Harbour Edge Realty prom. Leopold Belliveau Drive, Moncton (PID/NID 70570239) a conditional use application to allow a four storey, 84 unit apartment building with underground parking in the R3 zone and variances to increase the parking lot surface area from 35% to 36% and to increase the jogs and recesses spacing requirements in some areas
Locator image:


Site Plan:


Renderings:


__________________
Go 'Cats Go
Reply With Quote
     
     
  #1923  
Old Posted Feb 10, 2022, 7:02 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,111
Huddle article about the new Ideal Roofing manufacturing facility coming to the Caledonia Industrial Park.

https://huddle.today/2022/02/10/25-million-factory-will-bring-50-jobs-to-moncton/

- The location on the large lot at the corner of Urquhart and Frenette is confirmed
- The plant will cost $25M to construct, with opening in early 2023.
- 20 jobs initially created with 50 jobs ultimately anticipated.
- The plant is intended to serve the Maritime and New England markets.

__________________
Go 'Cats Go
Reply With Quote
     
     
  #1924  
Old Posted Feb 11, 2022, 1:08 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,111
Photo of the new K-8 francophone school currently under construction off of McLaughlin and Leopold Belliveau:



According to the T&T, the school population will be 1300, including 220 in the attached daycare. The K-5 portion of the school remains unnamed. The middle school will retain the name Le Mascaret.

Occupancy will be in January 2023.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1925  
Old Posted Feb 22, 2022, 12:30 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,111
Moncton city council meeting today. This item is on the agenda:

Quote:
7.1 Introduction – MID Industrial Park (Shediac Road) – Rezoning, Municipal Plan Amendment, and Urban Boundary Expansion
This will make official the process creating MIDs fifth industrial park in the city of Moncton (the others being MID itself, MID West, Caledonia and the Moncton East Business Park).

A few years back I came up with this fanciful proposal for a road network for this (at the time suspected) MID expansion. This allowed direct access to Highway 15 (and Shediac Road), as well as eliminating the at-level rail crossing on Highway 15, and creating a full interchange for the airport.



This was a work of pure whimsy and fancy, and I do not expect anything looking like this at all, but this does allow casual readers to visualize the area that will be included in the development of this new industrial park.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1926  
Old Posted Feb 23, 2022, 1:10 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,111
As per the above:

Quote:
Industrial Park Proposed On Shediac Road
Moncton, NB, Canada / 91.9 The Bend
Robert Lothian
Feb 23, 2022 | 6:57 AM

A new industrial park south of Shediac Road near the TransCanada Highway will help meet the growing demand for industrial land in the region.

Director of Planning, Bill Budd, introduced phase one of the development to Moncton City Council on Monday. Phase one proposes new public streets and industrial lots over 151 acres of land.

Budd told council Moncton Industrial Development has a lineup of businesses in need of industrial land and the development’s proximity to the highway and the Greater Moncton Airport makes it a hot commodity.

Over 8,000 people are currently employed in Moncton’s industrial parks, according to a city report. It notes that approving the industrial park at this location may provide a net benefit to the City of $27.96 million over 25 years.

Council approved recommendations on Monday evening to move forward with the process, and the next steps are a public presentation on March 21, a public hearing on May 2, and that by-Laws be referred to the Planning Advisory Committee for their input.
The title of the article is an unintended misnomer. While the land MID has purchased extends to Shediac Road, phase one of the development will only parallel Highway 15 with access both from the highway and from Harrisville Blvd via Babineau Street. It won't be until later phases of development that the park will impact Shediac Road in any way.



I note that the attached image does show an overpass on Highway 15 at the airport exit, but not a full interchange. It does appear that westbound traffic on the 15 will have access to the airport however via the new offramp to be built just to the west of the proposed overpass, by turning right and backtracking on Babineau and then turning right again onto the airport overpass. This would certainly be an improvement over the current situation.
__________________
Go 'Cats Go

Last edited by MonctonRad; Feb 23, 2022 at 1:35 PM.
Reply With Quote
     
     
  #1927  
Old Posted Feb 23, 2022, 2:26 PM
Riberview Riberview is offline
Registered User
 
Join Date: Nov 2020
Posts: 270
Quote:
Originally Posted by MonctonRad View Post
As per the above:



The title of the article is an unintended misnomer. While the land MID has purchased extends to Shediac Road, phase one of the development will only parallel Highway 15 with access both from the highway and from Harrisville Blvd via Babineau Street. It won't be until later phases of development that the park will impact Shediac Road in any way.



I note that the attached image does show an overpass on Highway 15 at the airport exit, but not a full interchange. It does appear that westbound traffic on the 15 will have access to the airport however via the new offramp to be built just to the west of the proposed overpass, by turning right and backtracking on Babineau and then turning right again onto the airport overpass. This would certainly be an improvement over the current situation.

I see they used an old overhead shot, as it shows traffic lights at the offramp intersection with Harrisville/Dieppe Blvd.

Aaaah the good old days.
Reply With Quote
     
     
  #1928  
Old Posted Feb 23, 2022, 2:50 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,111
I think we will soon see the development of some service related businesses (like fast food) on the corner of Harrisville and Babineau to service this expanding neighbourhood, especially the hungry workers of this industrial park as it builds out.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1929  
Old Posted Feb 23, 2022, 4:19 PM
NBNYer's Avatar
NBNYer NBNYer is online now
Registered User
 
Join Date: Mar 2010
Location: Moncton
Posts: 1,269
Quote:
Originally Posted by MonctonRad View Post
As per the above:

I note that the attached image does show an overpass on Highway 15 at the airport exit, but not a full interchange. It does appear that westbound traffic on the 15 will have access to the airport however via the new offramp to be built just to the west of the proposed overpass, by turning right and backtracking on Babineau and then turning right again onto the airport overpass. This would certainly be an improvement over the current situation.
Are those two separate overpasses for east and westbound lanes? I hope so because it looks like no effort was put into avoiding or realigning the rail line. I sure hope we don't end up with still having an at-grade rail crossing after this.
Reply With Quote
     
     
  #1930  
Old Posted Feb 23, 2022, 4:26 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,111
Quote:
Originally Posted by NBNYer View Post
Are those two separate overpasses for east and westbound lanes? I hope so because it looks like no effort was put into avoiding or realigning the rail line. I sure hope we don't end up with still having an at-grade rail crossing after this.
My solution would have eliminated the at grade rail crossing. Unfortunately, I think the solution being proposed will keep the at grade rail crossing in place.

It is difficult to tell from the image however. I see that there will be a public hearing on March 2nd. This question should be brought up.........

EDIT - Actually, at second glance, I do think that there will be eastbound and westbound overpasses on the 15, meaning the elimination of the at grade rail crossing. I hope this is the case. To do otherwise would be nonsensical.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1931  
Old Posted Feb 23, 2022, 5:19 PM
Nashe's Avatar
Nashe Nashe is online now
Registered User
 
Join Date: Feb 2009
Location: Moncton, NB
Posts: 3,069
Based on that diagram, the rail line would 1) have to be moved or 2) tunnelled in some way as it can't remain a level crossing with an overpass right there. Would it go THROUGH the overpass build-up and then cross the highway RIGHT after? Seems even more dangerous than now (train coming out of a blind tunnel).
Reply With Quote
     
     
  #1932  
Old Posted Feb 23, 2022, 10:07 PM
Riberview Riberview is offline
Registered User
 
Join Date: Nov 2020
Posts: 270
The CBC article on this story today indicated that phase 1 would indeed be off Shediac Rd.

https://www.cbc.ca/news/canada/new-brunswick/moncton-industrial-park-plans-council-1.6361230
Reply With Quote
     
     
  #1933  
Old Posted Feb 23, 2022, 10:41 PM
MonctonianSentinel01's Avatar
MonctonianSentinel01 MonctonianSentinel01 is offline
I Rise Again
 
Join Date: Mar 2016
Location: Moncton
Posts: 596
Quote:
Originally Posted by Vorkuta View Post
Based on that diagram, the rail line would 1) have to be moved or 2) tunnelled in some way as it can't remain a level crossing with an overpass right there. Would it go THROUGH the overpass build-up and then cross the highway RIGHT after? Seems even more dangerous than now (train coming out of a blind tunnel).
Not dangerous if you just look for the flashing lights rather than the train, that's why they are there. There are an uncountable number of railway crossings in North America where you can't see the trains coming, the flashing lights and bells warn you. I'd say the overpass will be high enough for the trains to go underneath or the line would be removed. I do believe though that if the customer is still being served that laws dictate the rail line can't be removed stranding the customer.
Reply With Quote
     
     
  #1934  
Old Posted Feb 24, 2022, 1:35 AM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,111
Quote:
Originally Posted by Riberview View Post
The CBC article on this story today indicated that phase 1 would indeed be off Shediac Rd.

https://www.cbc.ca/news/canada/new-brunswick/moncton-industrial-park-plans-council-1.6361230
Indeed - the CBC article is much more complete and more accurate.

The site plan posted above showing the initial street configuration is in fact quite old (from 2010), and is completely inaccurate. That site plan was included in both the T&T and 91.9 FM articles regarding the industrial park announcement. Here is the actual site plan from the CBC article:



The new park will be built in three phases, consisting of 241 acres, yielding 44 building lots. The lots will range in size from 2.2 acres to 8.5 acres. The connection to Babineau Street will not occur until phase 3, therefore initial access to the park will indeed be off Shediac Road.

They want to get as much work done this year as possible to allow the first businesses to break ground in 2023.

As for the connector to the airport and proposed overpass over Route 15:

Quote:
The city has sought input from the provincial government since the proposed industrial park is near where long-term plans call for new exit ramps and overpass linking the westbound lanes of Route 15 to the airport.

Budd said the city expects to have input from the province prior to the future council meetings.

"We want to make sure however that as the land develops, we don't impede the province's ability to build that crossing," Budd said, emphasizing that infrastructure would be the province's responsibility.
I would imagine the province will be as disinclined as usual to being cooperative with the city regarding the expense of new overpasses and the elimination of the at grade railway crossing. This will undoubtedly be the main sticking point to this entire plan as the city and province engage in an elaborate game of chicken over the course of the next 5-7 years.

A second sticking point is that full build out of this development will require adjustments to the city's municipal service boundary, but since this process is entirely under city control, this should be more easily accomplished than the Route 15 overpass and highway access.
__________________
Go 'Cats Go

Last edited by MonctonRad; Feb 24, 2022 at 12:33 PM.
Reply With Quote
     
     
  #1935  
Old Posted Feb 24, 2022, 8:04 PM
MonctonianSentinel01's Avatar
MonctonianSentinel01 MonctonianSentinel01 is offline
I Rise Again
 
Join Date: Mar 2016
Location: Moncton
Posts: 596
I see that they have the bridge and the on/off ramps away from the tracks. Also the outer limit of the park only borders the track as well. Good to see there won't be any major issues here. If I see that correctly.
Reply With Quote
     
     
  #1936  
Old Posted Mar 7, 2022, 1:25 PM
SevenSquared SevenSquared is online now
Registered User
 
Join Date: Feb 2017
Location: Dieppe
Posts: 212
New tenant for the Granite Centre plaza: Boustan, a very well-known Lebanese restaurant from Montréal that has been around since the 80s. It's the first one in Atlantic Canada as far as I know.

I used to go to their original location quite often back in the early 2000s before it was sold and turned into a franchise. No idea if it's still as good as it was then, but if so Mezza will have serious competition in that part of town.
Reply With Quote
     
     
  #1937  
Old Posted Mar 7, 2022, 1:43 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,111


Interesting - I will repost in the retail thread too.
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1938  
Old Posted Mar 7, 2022, 3:48 PM
adamuptownsj adamuptownsj is offline
Registered User
 
Join Date: Aug 2020
Location: Saint John NB
Posts: 2,027
I hope the industrial park allows for an eventual pair of rail overpasses. NB should really prioritize eliminating both of those.
Reply With Quote
     
     
  #1939  
Old Posted Mar 17, 2022, 9:31 PM
David_99's Avatar
David_99 David_99 is offline
Registered User
 
Join Date: Nov 2008
Posts: 851


Nice to see some signage finally up on Granite St.
Reply With Quote
     
     
  #1940  
Old Posted Mar 18, 2022, 9:27 PM
David_99's Avatar
David_99 David_99 is offline
Registered User
 
Join Date: Nov 2008
Posts: 851


Signage for the new Oulton’s location is up at the old Dooley’s off Elmwood.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 12:12 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.