Quote:
Originally Posted by Riberview
|
Indeed - the CBC article is much more complete and more accurate.
The site plan posted above showing the initial street configuration is in fact quite old (from 2010), and is completely inaccurate. That site plan was included in both the T&T and 91.9 FM articles regarding the industrial park announcement. Here is the
actual site plan from the CBC article:
The new park will be built in three phases, consisting of 241 acres, yielding 44 building lots. The lots will range in size from 2.2 acres to 8.5 acres. The connection to Babineau Street will not occur until phase 3, therefore initial access to the park will indeed be off Shediac Road.
They want to get as much work done this year as possible to allow the first businesses to break ground in 2023.
As for the connector to the airport and proposed overpass over Route 15:
Quote:
The city has sought input from the provincial government since the proposed industrial park is near where long-term plans call for new exit ramps and overpass linking the westbound lanes of Route 15 to the airport.
Budd said the city expects to have input from the province prior to the future council meetings.
"We want to make sure however that as the land develops, we don't impede the province's ability to build that crossing," Budd said, emphasizing that infrastructure would be the province's responsibility.
|
I would imagine the province will be as disinclined as usual to being cooperative with the city regarding the expense of new overpasses and the elimination of the at grade railway crossing. This will undoubtedly be the main sticking point to this entire plan as the city and province engage in an elaborate game of chicken over the course of the next 5-7 years.
A second sticking point is that full build out of this development will require adjustments to the city's municipal service boundary, but since this process is entirely under city control, this should be more easily accomplished than the Route 15 overpass and highway access.