Thanks. Yes, the way this area is growing, we ought to get ahead of it a bit. Clearly there is a demand and with two metro stops, it's only going to increase in density.
There are no elevations or renderings yet. The site is mostly the large surface lot next to Nordstrom's. The site also includes a one story building that will apparently be demo'ed.
This was posted a few years ago here and it is situated at or next to the location noted. Renderings appear to be in the 22-23 floor range.
What is the height (and floor count) of the current building going up right now? The parking garage already looks like it's in the 7-10 story range. Of course I haven't seen it up close yet.
Drilling on site of the northeast corner of Gault and Burnet where there is a somewhat newish RBFCU. Any ideas what this could be for as it is not a part of "Uptown" or the Domain proper?
Drilling on site of the northeast corner of Gault and Burnet where there is a somewhat newish RBFCU. Any ideas what this could be for as it is not a part of "Uptown" or the Domain proper?
City council just rezoned 11911 Burnet, from NR to CMU.
it's the former strip mall site they bought and leveled to put the new access road (Bright Verde Way) through.
I'm sort of assuming it's one of these new buildings on the south side of that road, three on the other.
Verde Square is both the name of the development and the plaza / courtyard above the underground parking and between the office, hotel and retail buildings. It looks like there may be a large jumbotron and stage in the plaza. I especially like the breezeway through the hotel building that creates a view of the Q2 NW entrance plaza.
These look great! I especially like the hotel with the breezway too. With this office tower plus Arena tower I'd imagine the plaza will be pretty busy in the afternoon even on non-match days. The elevations of the office component look very similar to the new Adobe HQ in SJ, might give an idea as to what the final product will look like in terms of materials: