Quote:
Originally Posted by Migrant_Coconut
Can't be justified, just like every idea for rail in Delta. Unless you know of a way to attract 16,000 more riders that nobody else does? Even if they all switched to transit, the entire peak season SWB-TSA route is barely 13k/day as it is.
|
https://moovitapp.com/greater_vancouver_...idx=5&customerId=4908&ref=2&poiType=line
https://www.bcferries.com/routes-fares/s...09/07/2021&scheduleReturnDate=09/06/2021
.... well, there's your problem.
At first I thought that the bus was on a frequency that was weird. Then I looked at the ferry from Victoria. Now, still think it is still weird.
Please answer the following questions:
1) The ferries from Victoria arrive every hour at 35 minutes past the hour. Why is it that the bus leaves
before it has arrived?(33 minutes past the hour for some.)
2) The ferries from Victoria arrive every hour at 35 minutes past the hour. Why are most of bus departures much earlier? (16,17,17 minutes past the hour)
So, how would I get 16k more? For starters, the ferry is arriving at a set time, have the existing transit do the same. That would mean it is predictable. That would mean it is easily planned for. Right now, with the existing schedule, it is all but useless unless you want to wait and hope not to see the bus leave as the ferry docks.
Quote:
Originally Posted by Migrant_Coconut
There you go again. "All you'd really need to do" as if the freight rails were deserted (rather than 99% busy) and your route was a straight shot to downtown (instead of winding all over the place). That's $6 billion worth of track-twinning to get to Waterfront four minutes later than the bus/SkyTrain combo, assuming both leave at the same time. And there's no room at the ferry for a rail line, so it'd have to terminate at Tsawwassen Mills... meaning you'd have to take a bus anyway.
|
The good thing about passenger service is it is predictable. The route is about the same length as the existing WCE. The WCE does it in about 1:15, so it could be expected that Terminal to Waterfront would take that long too.
https://www.google.ca/maps/dir/Tsawwasse...d49.2858634!2m3!6e0!7e2!8j1631000100!3e3
The existing method, would take about the same time, but that is only if you are going to Waterfront. What if you wanted to go to Scott Rd Station? It would be shorter.
Looking at it, it is not easy or quick to get to Waterfront. It would be even worse to get elsewhere too.
The ferry terminal is built on a man made peninsula. Right now, it is designed around the all mighty car(Of which 3 versions sit in my driveway....) There is no reason it cannot be widened to fit a station and tracks to it. That would mean a walk down from the ferry to the train station. No bus involved on that end.
Quote:
Originally Posted by Sheba
As we are reminded on a regular basis by WCE delays. Is it any wonder TransLink mostly aims to build grade separated Skytrain instead of any variety of on-ground rail.
|
The problem you will face is what Line 1 in Toronto does - over capacity. Right now, the lines can handle it, but, let's say roughly 1000 people based on the 13k a day end up on each. That would inundate it. Now, let's assume that only 1/4 are walk ons. That is still 250 people. That is 1 Canada line car full, and that is before it gets anywhere. By the time it gets downtown, many passengers at other stations would be passed by due to lack of space. Now you are in Line 1 territory. Now you are playing catch up with some sort of relief line, aka Ontario Line, which originally was planned in 1985. That is almost 40 years. By the time it opens and provides enough relief, it will be over 50 years. Imagine putting up with an over capacity Canada Line for over 50 years?