Quote:
Originally Posted by swimmer_spe
Is it that it can't be justified, or that it has been set up for failure?
|
Can't be justified, just like every idea for rail in Delta. Unless you know of a way to attract 16,000 more riders that nobody else does? Even if they all switched to transit, the entire
peak season SWB-TSA route is barely 13k/day as it is.
Quote:
Originally Posted by swimmer_spe
|
There you go again. "All you'd really need to do" as if the freight rails were deserted (rather than 99% busy) and your route was a straight shot to downtown (instead of winding all over the place). That's
$6 billion worth of track-twinning to get to Waterfront four minutes
later than the bus/SkyTrain combo, assuming both leave at the same time. And there's no room at the ferry for a rail line, so it'd have to terminate at Tsawwassen Mills... meaning
you'd have to take a bus anyway.