HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Aug 20, 2021, 6:22 PM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,841
Quote:
Originally Posted by FarmerHaight View Post
There is no information on the separate cost of the MUP tunnel: https://engage.gov.bc.ca/app/uploads/sit...wi_Estimated_Costs_Rev0A_20-Nov-2019.pdf

However, one could reasonably expect that a fraction of the overall crossing costs (estimated between $1.4 and $1.8 billion) will go towards one 5 meter MUP pathway tube compared to the two 174 meter traffic tubes.

The cost isn't nothing, but from the very beginning every short-list alternative included a MUP (pages 12 and 13 of this document): https://engage.gov.bc.ca/app/uploads/sit...nal_report_Rev0E_19-Dec-2019-w-cover.pdf
One traffic lane is 3.7m and the MUP was 3.5m. So maybe it would be roughly 15-20% of the $1.4-1.8 billion dollar figure.
Reply With Quote
     
     
End
   
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:43 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.