  #10381  
Old Posted Jul 20, 2021, 4:18 AM
Glenco Glenco is offline
Registered User
 
Join Date: Jul 2016
Posts: 324
Quote:
Originally Posted by Hardhatdan View Post
Yea I see the same ridiculous unfinished concrete ramp they can't get poured over the last three years.

If there is any method to TransEds madness, it's totally lost on me. It's been and continues to be exceedingly painful to watch them stumble towards the finish line.
Concrete being poured this evening. Now what are we going to complain about?🥴
     
     
  #10382  
Old Posted Jul 20, 2021, 4:29 AM
Hardhatdan Hardhatdan is offline
Registered User
 
Join Date: Jan 2003
Posts: 4,328
Quote:
Originally Posted by Glenco View Post
Concrete being poured this evening. Now what are we going to complain about?🥴
Pretty much all projects eventually get done, it's how they get done.
TransEd didn't do my neighbourhood any favors with their hap hazard executing.

So while they're won't be anything to complain about after they drug it on the extra year and some, there will be lots to lament with how they got there and the mess they left for years on end.

Hopefully the COE learns something too, about putting in interim milestones, penalties or other contract mechanisms to have the contractor get finished in a timely fashion. Strathearn is not the only community that suffered through a contract that accepts everything being paced to the longest path.
     
     
  #10383  
Old Posted Jul 20, 2021, 4:35 AM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,115
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #10384  
Old Posted Jul 20, 2021, 4:39 AM
Glenco Glenco is offline
Registered User
 
Join Date: Jul 2016
Posts: 324
Quote:
Originally Posted by Hardhatdan View Post
Pretty much all projects eventually get done, it's how they get done.
TransEd didn't do my neighbourhood any favors with their hap hazard executing.

So while they're won't be anything to complain abo ut after they drug it on the extra year and some, there will be lots to lament with how they got there and the mess they left for years on end.

Hopefully the COE learns something too, about putting in interim milestones, penalties or other contract mechanisms to have the contractor get finished in a timely fashion. Strathearn is not the only community that suffered through a contract that accepts everything being paced to the longest path.
I wasn’t expecting a serious answer.
     
     
  #10385  
Old Posted Jul 20, 2021, 2:33 PM
Hardhatdan Hardhatdan is offline
Registered User
 
Join Date: Jan 2003
Posts: 4,328
Quote:
Originally Posted by Glenco View Post
I wasn’t expecting a serious answer.
Well it's actual a serious issue, see the above pictures of 102ave Downtown where it's been a disrupted mess of incomplete work for years, only to still have it incomplete 7+months past the original promised finish date.
     
     
  #10386  
Old Posted Jul 20, 2021, 2:38 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,115
A good portion of that work could have been completed in two years versus the four that they used... alas.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #10387  
Old Posted Jul 20, 2021, 2:47 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,516
Quote:
Originally Posted by Hardhatdan View Post
Hopefully the COE learns something too


Laugh of the week!
__________________
If it seems I'm ignoring what you may have written in response to something I have written, it's very likely that you're on my Ignore List. Please do not take it personally.
     
     
  #10388  
Old Posted Jul 20, 2021, 7:02 PM
Hallsy's Toupee's Avatar
Hallsy's Toupee Hallsy's Toupee is offline
Registered User
 
Join Date: Feb 2010
Location: Edmonton
Posts: 6,895
https://globalnews.ca/news/8043461/edmonton-valley-line-lrt-southeast-strathearn-train-testing/

Quote:
The Valley Line LRT’s expansion into southeast Edmonton is taking another step forward this week.

The Valley Line Southeast has moved into the testing and commissioning phase, which will see the line go through a series of tests in the Strathearn area to ensure safety systems are working properly.

This will be the first time residents will be able to see the Light Rail Vehicles (LRVs) in their neighbourhood and witness how the low-floor train system works. Two LRVs will be part of the testing; they will be staged at the Strathearn LRT stop along 95 Avenue between 87 and 89 streets.

TransEd, the public-private partner building the 13-kilometre line from Mill Woods to downtown, said testing will take place on the rail line from the Strathearn stop, along Connors Road and to the Muttart stop.

This section of the Valley Line has the steepest track, down Connor’s Hill, so testing will be done on the brakes, as well as rescuing and towing cars.

Testing will take place intermittently over the next two weeks, between 6 a.m. and 6 p.m., according to TransEd.
     
     
  #10389  
Old Posted Jul 20, 2021, 8:10 PM
Airboy Airboy is offline
Registered User
 
Join Date: Sep 2008
Location: Edmonton/St Albert
Posts: 9,841
I'll try to get some video from my office.
__________________
Why complain about the weather? Its always going to be here. You on the other hand will not.
     
     
  #10390  
Old Posted Jul 26, 2021, 12:02 AM
Hallsy's Toupee's Avatar
Hallsy's Toupee Hallsy's Toupee is offline
Registered User
 
Join Date: Feb 2010
Location: Edmonton
Posts: 6,895
Delayed Valley Line LRT pedestrian bridge across the river not expected to open before snow hits

https://edmontonjournal.com/news/local-n...er-not-expected-to-open-before-snow-hits

Quote:
There will likely be snow on the ground before residents can once again cross the North Saskatchewan River from Cloverdale on the long-delayed Valley Line Southeast LRT pedestrian bridge.

The pedestrian crossing under the new $391-million Tawatinâ Bridge was supposed to be complete by May 2019, but that deadline went off track when a car-sized concrete slab was found in the river during bridge construction. In an update to Postmedia, TransEd communications manager Dallas Lindskoog said the river crossing should open in line with LRT service, and maybe even a bit before.

There isn’t a set timeline for opening the 13 km line, but Lindskoog said the team is working toward getting the line ready by the end of the year, about one year after the initial opening plan of December 2020.

Work on the pedestrian crossing is going well, with the above LRT bridge already complete, but Lindskoog said it won’t open until all the surrounding trail and landscaping work is complete and the crews need as many nice days as possible to get the job done before winter hits.

“It may happen before service commencement, but if it does it will be in snowy conditions and that’s because we need every nice day that we’ve got to finish the landscaping and the restoration of those parks on both sides all summer long,” Lindskoog said. “Once the trails are built we have to do significant landscaping planning and we have to keep it closed until all the work is done.”

South-side Ward 8 Coun. Ben Henderson said his constituents have been waiting a long time for both the bridge and the line and are excited to see it nearing completion. The previous Cloverdale footbridge was closed in December 2016 to allow for construction to begin.

“It would have been lovely to have it open by now, but I think the most important thing is getting it open period and hopefully this will be the last summer without it,” Henderson said in an interview with Postmedia. “I think people are getting impatient but we’re getting close and hopefully once it’s open, it’s open. And it will be a nice bridge and it will give people back the connection that I think has always been a really important pedestrian connection.”

As for the rest of the project, Lindskoog said testing and commissioning is ramping up to prepare for line-wide testing toward the end of the year. Two trains arrived in the Strathearn neighbourhood last week for a two-week testing period along Connors Road, the steepest grade along the line, to ensure a train car can be recovered in an unlikely event it loses power and has to get pulled up the hill.

Responding to the line delays, the city’s valley line technical manager Chris Gentile said the project agreement outlines financial consequences for TransEd but the specific payment amounts for these delays are “commercially sensitive” and not being released publicly.
     
     
  #10391  
Old Posted Jul 26, 2021, 5:41 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,115
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #10392  
Old Posted Jul 26, 2021, 6:10 PM
GenWhy? GenWhy? is online now
Registered User
 
Join Date: Jun 2017
Posts: 4,835
Oh I forgot about the double-loaded platforms... for stadium crowds, I assume?
     
     
  #10393  
Old Posted Jul 26, 2021, 6:11 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,115
yes, I believe so. It should help quite a bit with the post-event crush.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #10394  
Old Posted Jul 26, 2021, 6:43 PM
Rogie's Avatar
Rogie Rogie is offline
Registered User
 
Join Date: Jun 2008
Location: Vancouver
Posts: 433
That platform on the stadium side looks absolutely massive!
__________________
Western Aviation News
     
     
  #10395  
Old Posted Jul 26, 2021, 10:25 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
Too bad it won't be open this year.

There will be direct access to the southbound platform from the stadium walkway. Those going north will have to cross the tracks at either end of the station. But that's fine because theoretically we won't be competing with the southbound crush to get onto the platform.

Access from the stadium walkway. Source: City of Edmonton


Dual platform. Note the Platform Not In Use sign. Source: City of Edmonton
     
     
  #10396  
Old Posted Jul 27, 2021, 2:56 PM
Hallsy's Toupee's Avatar
Hallsy's Toupee Hallsy's Toupee is offline
Registered User
 
Join Date: Feb 2010
Location: Edmonton
Posts: 6,895
https://twitter.com/dustin_cook3/status/1420033318976999434
Minister @cathmckenna announces almost $400M in funding for the Capital Line South extension. This funding was previously committed but sounds like the city’s business case has now been green lit and construction can move forward. #yegtransit #yegcc


     
     
  #10397  
Old Posted Jul 27, 2021, 4:47 PM
Harrison's Avatar
Harrison Harrison is online now
A Better Place
 
Join Date: Jan 2007
Location: Edmonton
Posts: 3,083
Great news, full steam ahead on construction!
__________________
Bingo bango bongo
     
     
  #10398  
Old Posted Jul 27, 2021, 6:30 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,115
Indeed. Keep the momentum going.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #10399  
Old Posted Jul 27, 2021, 7:05 PM
JSS1974 JSS1974 is offline
Registered User
 
Join Date: Jul 2021
Posts: 408
Will this line eventually lead to the airport
     
     
  #10400  
Old Posted Jul 27, 2021, 7:26 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,115
There are two options there:

1. Heavy rail using the CP ROW to Whyte
2. LRT continuation with a park and ride in Nisku, stop at the outlet mall and a terminal stop very similar to what you see at YVR actually.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton
Forum Jump



Forum Jump


All times are GMT. The time now is 6:57 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.