Quote:
Originally Posted by jlove390
In the contract it says they’ll be doing a separate bid for 138th to 96th in late 2021 for a 2022 start. I’m surprised it’s not all being done at once.
|
I recall the City's capital plan looking at having this part go first, but I think there's now cause to have it go a bit later, because the 140 Street Station and a pocket track will be built in the median along this part of the roadway.
I think there's also a presumption that some volume turns onto/from 96th Avenue (to access the hospital, although it does form a half-decent alternate route to KGB).