HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton


View Poll Results: Would you vote for a ETS Rapid Transit masterplan scheme?
Yes, I'd vote for more BRT/LRT 301 82.92%
No, what we have is fine. 34 9.37%
I dunno, maybe, yes, no, whatever. 28 7.71%
Voters: 363. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #10341  
Old Posted Jul 5, 2021, 3:36 PM
s4.audios's Avatar
s4.audios s4.audios is offline
Registered User
 
Join Date: Aug 2011
Location: Edmonton
Posts: 1,320
Would it be feasible for EIA if it owned, operated, and recouped the profits from the hyperloop?
     
     
  #10342  
Old Posted Jul 5, 2021, 4:37 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,125
If it can be focussed on the opening of a local coffee roasting/production facility, the world is its oyster.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #10343  
Old Posted Jul 5, 2021, 5:10 PM
EdmTrekker EdmTrekker is offline
Registered User
 
Join Date: Jul 2006
Posts: 5,247
Quote:
Originally Posted by s4.audios View Post
Would it be feasible for EIA if it owned, operated, and recouped the profits from the hyperloop?
What are you smoking?
     
     
  #10344  
Old Posted Jul 5, 2021, 7:17 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,518
Quote:
Originally Posted by s4.audios View Post
Would it be feasible for EIA if it owned, operated, and recouped the profits from the hyperloop?
Did you honestly just ask that question?
__________________
If it seems I'm ignoring what you may have written in response to something I have written, it's very likely that you're on my Ignore List. Please do not take it personally.
     
     
  #10345  
Old Posted Jul 8, 2021, 3:39 AM
Hallsy's Toupee's Avatar
Hallsy's Toupee Hallsy's Toupee is offline
Registered User
 
Join Date: Feb 2010
Location: Edmonton
Posts: 6,895
Back to LRT construction now.
Great progress with the SUP under the Tawatina Bridge.





     
     
  #10346  
Old Posted Jul 8, 2021, 3:22 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
Nice to see some of that beach still exists. Would be nice if they provided some sort of connection from the nearby reinstated multi use path and maybe expanded it.

Been taking transit here and there the last couple of weeks. It seems clean and fairly back to normal despite lingering low volumes for the most part. One of my trains had quite a number of people on it, someone sat in the same booth as me. I do have a complaint. Bus runs every 15 minutes, the train runs every 15 minutes. You'd think they would time it so that people can make that connection. As it stands right now, the bus is scheduled to get there 2 minutes after the train is scheduled to depart. At least the park and rides are very empty right now.
     
     
  #10347  
Old Posted Jul 8, 2021, 4:02 PM
Airboy Airboy is offline
Registered User
 
Join Date: Sep 2008
Location: Edmonton/St Albert
Posts: 9,844
Quote:
Originally Posted by Hallsy's Toupee View Post
Back to LRT construction now.
Great progress with the SUP under the Tawatina Bridge.





Just as I was getting my shots today you post. Oh well. It is nice to see the railings are on now as well. hopefully this gets open soon.
[IMG]TTS_5565 by [url=https://www.flickr.com/photos/[/url], on Flickr[/IMG]

DKaz, that sand bar was always there it just the sandy beach closer to the bridge that was new. plus the sand deposits were better more recently. We shall see what happens the next high water event.
__________________
Why complain about the weather? Its always going to be here. You on the other hand will not.
     
     
  #10348  
Old Posted Jul 8, 2021, 5:37 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,125
EllisDon to Lead Prairie Link High-Speed Rail Partners

Edmonton, AB, July 8, 2021—EllisDon, a world-leading construction services and infrastructure development company, announced today that they have formed a partnership to advance the development of high-speed rail connecting Edmonton, Red Deer, and Calgary in Alberta, Canada. EllisDon and its team took the initiative to propose the project within the Government of Alberta’s Unsolicited Proposal Guidelines and Framework.

"The notion of high-speed rail — a proven technology around the world — connecting Edmonton, Red Deer, and Calgary in Alberta is not new, but we believe that its time has come. We have built a team with both the capacity and faith in the future of our province to advance it in a meaningful way for Albertans," said Jeffrey Hansen-Carlson, Director with EllisDon Capital and Project Director for Prairie Link.

Prairie Link has secured a Memorandum of Understanding (MOU) from Alberta Transportation laying the foundation for cooperatively advancing project development. With an estimated capital cost of $9 billion, the project will be among the largest and most defining nation-building transportation projects in Alberta's history.

https://www.ellisdon.com/news/ellisdon-to-lead-prairie-link-high-speed-rail-partners/
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #10349  
Old Posted Jul 8, 2021, 5:50 PM
Drumbones2 Drumbones2 is offline
Registered User
 
Join Date: Apr 2015
Location: Edmonton Area
Posts: 239
Ok so this is high speed rail, then there’s the hyperloop, plus Alberta transportation to widen the QE2 to 6 lanes all the way through. Anything else I’m not hearing about? I hear they’re bringing back the concord. Edmonton to Calgary in ten minutes ?
     
     
  #10350  
Old Posted Jul 8, 2021, 6:19 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,518
Quote:
Originally Posted by Drumbones2 View Post
Ok so this is high speed rail, then there’s the hyperloop, plus Alberta transportation to widen the QE2 to 6 lanes all the way through. Anything else I’m not hearing about? I hear they’re bringing back the concord. Edmonton to Calgary in ten minutes ?
Snake oil appears to come in multiple flavours.
__________________
If it seems I'm ignoring what you may have written in response to something I have written, it's very likely that you're on my Ignore List. Please do not take it personally.
     
     
  #10351  
Old Posted Jul 8, 2021, 6:45 PM
technomad technomad is offline
BANNED
 
Join Date: Apr 2011
Location: Alberia
Posts: 858
wow, nice to see a real company getting on this! the 9 bil estimate seems to be inline with Japanese style HSR too
interested to see who they partner with...

any discussion of the meme-train and the shysters selling it should have ended upon noticing they also just happen to be in the covid ventilator business

as for widening HWY 2, that's a good decade overdue... so we might was well jump direct to 8 lanes so we can have things like segregated truck lanes
     
     
  #10352  
Old Posted Jul 8, 2021, 7:59 PM
Airboy Airboy is offline
Registered User
 
Join Date: Sep 2008
Location: Edmonton/St Albert
Posts: 9,844
Watching the construction on the Tawatina Bridge today. it looks like they are pushing to get the MUP between the 2 piers completed this week. The seem to be attaching most of the final south side connections today.
__________________
Why complain about the weather? Its always going to be here. You on the other hand will not.
     
     
  #10353  
Old Posted Jul 8, 2021, 8:22 PM
adam-machiavelli adam-machiavelli is offline
Registered User
 
Join Date: Jun 2005
Posts: 1,246
Makes no sense to spend 9 billion on high speed rail, then spend another few billion widening highway 2 at the same time. Pick one or the other. Jeez.
     
     
  #10354  
Old Posted Jul 9, 2021, 1:59 AM
Hallsy's Toupee's Avatar
Hallsy's Toupee Hallsy's Toupee is offline
Registered User
 
Join Date: Feb 2010
Location: Edmonton
Posts: 6,895
If the rumoured LRT extension to EIA is forthcoming, how will it tie in with the Discovery Business Park just off of Hwy 19?

https://edmontonjournal.com/news/local-news/new-manufacturing-facility-breaks-ground-in-edmonton

http://remingtoncorp.com/leasing/industrial/discovery-business-park/
     
     
  #10355  
Old Posted Jul 9, 2021, 2:27 AM
EdmTrekker EdmTrekker is offline
Registered User
 
Join Date: Jul 2006
Posts: 5,247
Prairie Link lol. Obviously Ellis Don does not understand Alberta brands itself has mountains and foothills with a boreal forest and wheat fields. Not priairie. They could have called it Alberta link but the eastern outfit is too 🞵🞵🞵🞵🞵🞵🞵 stupid.
     
     
  #10356  
Old Posted Jul 9, 2021, 4:52 AM
kcantor kcantor is offline
Registered User
 
Join Date: Aug 2007
Location: Edmonton
Posts: 2,987
Quote:
Originally Posted by EdmTrekker View Post
Prairie Link lol. Obviously Ellis Don does not understand Alberta brands itself has mountains and foothills with a boreal forest and wheat fields. Not priairie. They could have called it Alberta link but the eastern outfit is too 🞵🞵🞵🞵🞵🞵🞵 stupid.
not only is alberta - all of it - one of the three “prairie provinces”, it is the one with the most actual prairie. within the province, both edmonton and calgary are considered to be within the area typically defined as prairie.

http://https://en.m.wikipedia.org/wiki/Canadian_Prairies
__________________
"If you did not want much, there was plenty." Harper Lee
     
     
  #10357  
Old Posted Jul 9, 2021, 2:14 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,125
'Council unanimously voted on Monday to stop handing out loitering tickets at transit stations. Instead of a fine, vulnerable people at ETS facilities will be offered support.'
Taproot
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #10358  
Old Posted Jul 10, 2021, 3:06 AM
Rogie's Avatar
Rogie Rogie is offline
Registered User
 
Join Date: Jun 2008
Location: Vancouver
Posts: 433
Valley Line expanded energization and testing starting Monday

https://transedlrt.ca/updates/energization-of-overhead-wires-on-the-valley-line-southeast-lrt-4/

Starting on or about Monday, July 12th, 2021, the overhead wires for the Valley Line Southeast LRT along 66 Street between Whitemud Drive and 41 Avenue, and along 75 Street between Roper Road and Whitemud Drive, will be permanently energized. Energization of this segment means that Light Rail Vehicle (LRV) testing will be occurring, intermittently, in this area. Testing is already underway to the south (along 66 Street from 28 Avenue to 41 Avenue).
__________________
Western Aviation News
     
     
  #10359  
Old Posted Jul 10, 2021, 6:08 PM
sleepyeyed sleepyeyed is offline
BANNED
 
Join Date: Apr 2021
Posts: 93
Quote:
Originally Posted by kcantor View Post
not only is alberta - all of it - one of the three “prairie provinces”, it is the one with the most actual prairie. within the province, both edmonton and calgary are considered to be within the area typically defined as prairie.

http://https://en.m.wikipedia.org/wiki/Canadian_Prairies
yeah, the boreal plain extends well into northern Alberta. prairie is just the french word for plain. the difference between the two int eh three prairie provinces is mostly forestation.


from prairieclimatecentre.ca

Last edited by sleepyeyed; Jul 10, 2021 at 6:21 PM.
     
     
  #10360  
Old Posted Jul 10, 2021, 6:24 PM
Drumbones2 Drumbones2 is offline
Registered User
 
Join Date: Apr 2015
Location: Edmonton Area
Posts: 239
Quote:
Originally Posted by Rogie View Post
Valley Line expanded energization and testing starting Monday

https://transedlrt.ca/updates/energization-of-overhead-wires-on-the-valley-line-southeast-lrt-4/

Starting on or about Monday, July 12th, 2021, the overhead wires for the Valley Line Southeast LRT along 66 Street between Whitemud Drive and 41 Avenue, and along 75 Street between Roper Road and Whitemud Drive, will be permanently energized. Energization of this segment means that Light Rail Vehicle (LRV) testing will be occurring, intermittently, in this area. Testing is already underway to the south (along 66 Street from 28 Avenue to 41 Avenue).
Getting closer, getting closer. Can’t wait to take Sonny Boy and myself on our first ride!
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton
Forum Jump



Forum Jump


All times are GMT. The time now is 11:38 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.