Wow glad to see them moving fast on the demo at least. I had no idea this was starting so soon.
Reply With Quote
     
     
  #182  
Old Posted Mar 9, 2021, 3:45 AM
TransitJack TransitJack is offline
 
Join Date: Jul 2009
Posts: 443
The old Rogers video at Arbutus is demolished now too.
Reply With Quote
     
     
  #183  
Old Posted Mar 9, 2021, 4:30 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
 
Join Date: Oct 2015
Posts: 10,202
Pedantically speaking, it was more of a cell phone and accessory store - they haven't rented videos since 2012.
Reply With Quote
     
     
  #184  
Old Posted Mar 9, 2021, 6:51 PM
shreddog shreddog is online now
 
Join Date: Sep 2003
Posts: 5,533
Anyone know what's happening with this site?

They starting clearing it out last week and when I spoke with someone there yesterday he claimed it was to be used as staging area for equipment in support of subway construction, including the stations at Laurel and Cambie.

I know that the BC Cancer centre did plan on parking there while holding until any new construction, but I believe that as it's just been weeds for the past 12 years, there wasn't that much demand for that. Then again, with the removal of parking on 10th, perhaps this will be used to provide some??
Reply With Quote
     
     
  #185  
Old Posted Mar 10, 2021, 6:39 PM
superelevation superelevation is offline
 
Join Date: Oct 2020
Posts: 50
Do we know if there is a fare paid zone transfer at Arbutus ala TTC? Sort of looks like it . . ..
Reply With Quote
     
     
  #186  
Old Posted Mar 10, 2021, 7:28 PM
madog222 madog222 is online now
 
Join Date: Jan 2014
Posts: 4,240
Quote:
Originally Posted by superelevation View Post
Do we know if there is a fare paid zone transfer at Arbutus ala TTC? Sort of looks like it . . ..
No, this makes no change to the existing fare system.

Now if Translink changes to distance based by 2025 is another question.
Reply With Quote
     
     
  #187  
Old Posted Mar 10, 2021, 9:44 PM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,840
I think he's just asking if the bus loop is behind the faregates, not whether the fares structure will change.
I doubt that would be the case, though, as Translink gets data from Compass Card use and tapping on exiting the faregates at the station would be needed to for Skytrain-specific and tapping upon boarding a bus for bus route-specific data.
Reply With Quote
     
     
  #188  
Old Posted Mar 13, 2021, 12:36 AM
Jimbo604 Jimbo604 is offline
 
Join Date: Jan 2012
Posts: 1,888





Photo credit: me

Two story red painted cinder block construction building just north of future Great Northern Way–Emily Carr station and in the path of train route connection eastward to VCC-Clark station
has now been fully demolished. Formerly Monte Clark Gallery / Equinox Gallery.

Last edited by Jimbo604; Mar 13, 2021 at 3:58 AM. Reason: tag problem
Reply With Quote
     
     
  #189  
Old Posted Mar 14, 2021, 10:05 PM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,849
Might be new but a bunch of Broadway Subway design documents for each station from the DP review minutes:

https://vancouver.ca/home-property-development/development-permit-board.aspx
Reply With Quote
     
     
  #190  
Old Posted Mar 27, 2021, 2:14 PM
Hooknose Hooknose is offline
 
Join Date: Mar 2017
Posts: 248
What about Broadway and Cambie

I am out of town, due to Covid.
Has the tear down of the building at Broadway and Cambie started???
Reply With Quote
     
     
  #191  
Old Posted Mar 27, 2021, 2:55 PM
Changing City's Avatar
Changing City Changing City is online now
 
Join Date: Nov 2016
Posts: 8,385
Quote:
Originally Posted by Hooknose View Post
I am out of town, due to Covid.
Has the tear down of the building at Broadway and Cambie started???
There are contractors on site stripping out material. They're 1950s buildings, so likely potentially toxic materials, especially asbestos. The Main and Laurel station sites are now clear of buildings, although not yet completely cleared sites; they were still removing the demolition debris earlier this week.
Reply With Quote
     
     
  #192  
Old Posted Apr 2, 2021, 12:35 AM
Express691 Express691 is offline
 
Join Date: Aug 2015
Posts: 650
Email I got this afternoon says that 400 block Broadway will undergo demolition shortly with the remaining 2 buildings still undergoing hazardous materials removal

https://app.simplycast.ca/?e=email/share/14UEhXzucvVYRVGpp7u_5Rug
Reply With Quote
     
     
  #193  
Old Posted Apr 2, 2021, 4:19 PM
Jimbo604 Jimbo604 is offline
 
Join Date: Jan 2012
Posts: 1,888
Some info from:

Broadway Subway Construction Current Work
https://www.broadwaysubway.ca/construction/current-work/

So you got the usual Geo-Technical work and Utility Re-Location work. Demolition starting/started at Cambie and Oak stations, anyone going to be in the area for SSP pictures?

In terms of demolition:


Great Northern Way-Emily Carr Station:

"April 1 – The parking lot north of Emily Carr University of Art + Design will be closed and fenced off as part of the construction area.
April 8 – E. 1st Avenue north of Emily Carr University of Art + Design from the university’s loading bay west to the roundabout will be fenced and closed to the public.
April 12 – Thornton Street will be closed and fenced off between Great Northern Way and E. 1st Avenue.
The above closures will be in effect for the duration of Broadway Subway Project construction."


Broadway-City Hall Station:

"Demolition work begins at 400 W. Broadway April 6-May 5, 2021, 7 a.m. to 5 p.m., Monday to Friday."

This tired and terribly under-utilized block (for the area it is in) will finally be put out of its misery starting Tuesday.


Photo Source: broadwaysubway.ca construction notice



Oak VGH Station:

"Crews are processing and hauling demolition debris March 29-April 9, 2021, Monday-Friday, 7 a.m.-8 p.m. Noisy work will only occur 10 a.m.-3 p.m."

"March 29, 2021 Update: The Broadway Subway Project Corporation (BSPC) has completed the demolition of 906, 916, and 922 W. Broadway (see March 12, 2020 notification). Over the next week, BSPC will be processing and hauling the demolition debris. This will entail minimal trucking for approximately one to two weeks. Sidewalks and on-street parking will be available during debris processing and hauling."

https://app.simplycast.ca/?e=email/share/14UEhXzucvVYRLHM_dyf2YRw

In progress...


South Granville Station:

"Removal of hazardous materials in preparation for structural demolition at 1409, 1431, 1441 and 1451 West Broadway.
Work occurs 7 a.m.-3 p.m., Feb 8 to approximately mid-April."

In progress...


Arbutus Station Building Demolition:

"Work completed except for delivery of site trailers."


&

Last edited by Jimbo604; Apr 2, 2021 at 4:32 PM.
Reply With Quote
     
     
  #194  
Old Posted Apr 2, 2021, 4:32 PM
Jimbo604 Jimbo604 is offline
 
Join Date: Jan 2012
Posts: 1,888

Photo Source: Google Maps - https://www.google.ca/maps

"901 Great Northern Way

In preparation for construction of the elevated guideway portion of the Broadway Subway Project, a portion of the building located at 901 Great Northern Way is being removed and replaced with a new foundation and façade.

A temporary construction hoarding wall has been installed to separate the construction area from businesses.

Work on this building is expected to be finished by summer 2021."


Sounds like someone at the barber.. just a little off the back please. How much do they need?
Reply With Quote
     
     
  #195  
Old Posted Apr 2, 2021, 6:49 PM
madog222 madog222 is online now
 
Join Date: Jan 2014
Posts: 4,240
^More or less along the lines of what was done at the Safeway at Commercial-Broadway.

As for how much, I would assume to match the setback of the building to the west.
Reply With Quote
     
     
  #196  
Old Posted Apr 2, 2021, 11:48 PM
Jimbo604 Jimbo604 is offline
 
Join Date: Jan 2012
Posts: 1,888






Oak VGH Station (Broadway and Laurel St)

That was quick... all gone. 950 W Broadway is the next standing building in the block now.








Broadway-City Hall Station (Broadway and Cambie St)

Stores are vacated and the site completely fenced up. Still standing though.. for now.

Photo source: me
Reply With Quote
     
     
  #197  
Old Posted Apr 3, 2021, 3:30 AM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,840
Quote:
Originally Posted by Jimbo604 View Post

Photo Source: Google Maps - https://www.google.ca/maps

"901 Great Northern Way

In preparation for construction of the elevated guideway portion of the Broadway Subway Project, a portion of the building located at 901 Great Northern Way is being removed and replaced with a new foundation and façade.

A temporary construction hoarding wall has been installed to separate the construction area from businesses.

Work on this building is expected to be finished by summer 2021."


Sounds like someone at the barber.. just a little off the back please. How much do they need?
Steetview lets you go into MEC`s parking lot:



https://www.google.ca/maps/@49.2663051,-...mRz_YWQNJdgeMHgIVhbyQ!2e0!7i16384!8i8192
Reply With Quote
     
     
  #198  
Old Posted Apr 3, 2021, 7:22 PM
Diegotheartist1's Avatar
Diegotheartist1 Diegotheartist1 is offline
 
Join Date: Apr 2021
Posts: 163
What is the fate of that single guideway once the elevated extension is built? I hope it's extended and switched to the main guideway, to be used as a storage track. if it's just going to be left like that, then trains which are about to begin service could begin from here in VCC station.
Reply With Quote
     
     
  #199  
Old Posted Apr 3, 2021, 10:11 PM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,840
They probably start service at Arbutus Station.
This will probably remain for maintenance equipment.
Reply With Quote
     
     
  #200  
Old Posted Apr 3, 2021, 10:38 PM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,849
Quote:
Originally Posted by Diegotheartist1 View Post
What is the fate of that single guideway once the elevated extension is built? I hope it's extended and switched to the main guideway, to be used as a storage track. if it's just going to be left like that, then trains which are about to begin service could begin from here in VCC station.
From the plans it will still be there. There's barely enough room for the new main guideway, they can't fit in any extension of that guideway.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 4:38 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.