Quote:
Originally Posted by J.OT13 View Post
Barrhaven doesn't need rail. The ridership doesn't warrant it now, probably even less so post-Covid.

For a few dozen million, they could add transit priority at traffic lights up Woodroff, remove a few stops and build better shelters at stops that remain.
If that is your view, then that is fine, as long as you are looking at the actual costs.

I do agree would be good to see the how transit usage will look when things return to a new normal after COVID. Having said that, it would be a shame to miss the opportunity to receive post COVID stimulus money.

Quote:
Even with the $1.6B to Fallowfield, it still ends up costing $267 million/km, far more expensive than much more complicated Stage 1 or any comparable project in Canada (except Crosstown, which is mostly tunneled).
I suspect the issue is that with more and more cities building LRT systems, the cost is going up as it is difficult to hire the talent needed.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 3:14 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.