HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Reply

 
Thread Tools Display Modes
     
     
  #2441  
Old Posted Oct 6, 2020, 1:41 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Tvisforme View Post
From Vancouver Urbanized:



The group proposing this line is "Mountain Valley Express" and they estimate construction costs to be between 7 and 16 billion dollars. The group acknowledges that extensive engineering analysis would be required to stabilize cost estimates. Their emphasis is on the costs savings between this line and an equivalent expansion of highway capacity.

Their estimates include a travel time of four minutes from Horseshoe Bay to North Vancouver. Whether they've factored in the political cost of proposing that infrastructure capable of supporting this being built across West Vancouver remains to be seen.
You know, if they had suggested a regular speed train, I would support it. A high speed train? Not a chance.
Reply With Quote
     
     
  #2442  
Old Posted Oct 6, 2020, 2:53 PM
scryer scryer is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,964
Quote:
Originally Posted by swimmer_spe View Post
You know, if they had suggested a regular speed train, I would support it. A high speed train? Not a chance.


I'm all about finding a green solution to connecting the region with this route but I also agree that they may be off with their choice in technology. If they proposed it as a regular speed train, I also think it would still attract a similar amount of riders anyways. I would like to see the complete break down of how they calculated those head-times.

Last edited by scryer; Oct 6, 2020 at 4:05 PM.
Reply With Quote
     
     
  #2443  
Old Posted Oct 6, 2020, 5:56 PM
AkariAkaza's Avatar
AkariAkaza AkariAkaza is offline
Registered User
 
Join Date: May 2020
Posts: 17
It doesn't sound like I bad idea if they use something other than HSR, definitely better than that rail for the valley proposal
Reply With Quote
     
     
  #2444  
Old Posted Oct 6, 2020, 9:09 PM
Bdawe Bdawe is offline
Registered User
 
Join Date: Aug 2015
Location: The West End
Posts: 535
I don't think people have a strong grasp of how few people live in the Sea-to-Sky Corridor.

Like I'm into there-being-trains, and I think that they can and should be made high quality, I'm just not sold that there's enough social pay off in it in making them such that they manage to average 220 km/h
Reply With Quote
     
     
  #2445  
Old Posted Oct 6, 2020, 10:31 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Bdawe View Post
I don't think people have a strong grasp of how few people live in the Sea-to-Sky Corridor.

Like I'm into there-being-trains, and I think that they can and should be made high quality, I'm just not sold that there's enough social pay off in it in making them such that they manage to average 220 km/h
I could see this working well for the skiing community. It could turn Squamish and Whistler into bedroom communities as well.
Reply With Quote
     
     
  #2446  
Old Posted Oct 6, 2020, 11:51 PM
Tvisforme's Avatar
Tvisforme Tvisforme is offline
Registered User
 
Join Date: Sep 2014
Location: Metro Vancouver
Posts: 2,179
Quote:
Originally Posted by swimmer_spe View Post
It could turn Squamish and Whistler into bedroom communities as well.
Given the short travel times they're proposing for the Whistler-Vancouver run, and the length of many existing commutes within Metro (1 hour or so), Lillooet could be a bedroom community with the high-speed line.
Reply With Quote
     
     
  #2447  
Old Posted Oct 7, 2020, 12:54 AM
Vin Vin is offline
Registered User
 
Join Date: Sep 2013
Posts: 8,739
Quote:
Originally Posted by Bdawe View Post
I don't think people have a strong grasp of how few people live in the Sea-to-Sky Corridor.

Like I'm into there-being-trains, and I think that they can and should be made high quality, I'm just not sold that there's enough social pay off in it in making them such that they manage to average 220 km/h
They can have a higher capacity high-speed commuter train going all the way to the Horseshoe Bay transfer station, and then those going further, and even for those going to Squamish/Whistler, can switch to a lower-capacity single or double-car railway. This is common in other parts of the world where railway travel is the norm. The line can be beefed up later when the population density along the corridor justifies the added expenditure.

The Great Western Railway trains from London's Paddington Station:
• Video Link
Reply With Quote
     
     
  #2448  
Old Posted Oct 7, 2020, 1:24 AM
chowhou's Avatar
chowhou chowhou is offline
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,903
Quote:
Originally Posted by Tvisforme View Post
Given the short travel times they're proposing for the Whistler-Vancouver run, and the length of many existing commutes within Metro (1 hour or so), Lillooet could be a bedroom community with the high-speed line.
Squamish is already a bedroom community of Vancouver, and from what I've heard Pemberton already almost is as well.

Only problem with Lillooet is, well, you have to live in Lillooet.
Reply With Quote
     
     
  #2449  
Old Posted Oct 7, 2020, 1:46 AM
Aroundtheworld Aroundtheworld is offline
Registered User
 
Join Date: Oct 2013
Posts: 623
Quote:
Originally Posted by Bdawe View Post
I don't think people have a strong grasp of how few people live in the Sea-to-Sky Corridor.

Like I'm into there-being-trains, and I think that they can and should be made high quality, I'm just not sold that there's enough social pay off in it in making them such that they manage to average 220 km/h
I could see it being a big tourist draw that would help Whistler as well as Aquilini's planned Squamish resort.

For those wanting to try and draw this on a map, a few things to consider:
Reply With Quote
     
     
  #2450  
Old Posted Oct 7, 2020, 2:14 AM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 652
Quote:
Originally Posted by Migrant_Coconut View Post
Okay, so now the interurban to Abby and Chilliwack is the second nuttiest train pitch in the Lower Mainland.
lol yeah.

This MVX concept is so ludicrous that it wouldn't even make sense if you post it in the fantasy thread.

These people clearly don't know how rail works, let alone HSR.
Reply With Quote
     
     
  #2451  
Old Posted Oct 7, 2020, 2:34 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,216
Quote:
Originally Posted by ilikeredheads View Post
These people clearly don't know how rail works, let alone HSR.
I'm really interest in who these "academics and urban planners" are.
Reply With Quote
     
     
  #2452  
Old Posted Oct 7, 2020, 2:56 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,182
A reminder that HSR is $55 million per klick. It'd be great for Squamish and Whistler... if we've got $6.5 billion lying around (just for the Sea to Sky stretch) and no SkyTrains left to build. At least the maglev to Seattle has an actual business case.

Quote:
Originally Posted by madog222 View Post
I'm really interest in who these "academics and urban planners" are.
Anybody employed by a university (e.g. Stephan Nieweler or Patrick Condon). Tenure gives you enough social reputation to pitch whatever loopy, poorly-researched pet project you can think of without consequences.
Reply With Quote
     
     
  #2453  
Old Posted Oct 7, 2020, 3:22 AM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,679
Quote:
Originally Posted by Aroundtheworld View Post
[*]Turning Radii (4 km for 300kph)[/LIST]
To put it into perspective, that is from Broadway/Arbutus all the way to Kingsgate.

Hopefully people can settle for a working train, because at least you got a train. We can work on making it high speed later.
Reply With Quote
     
     
  #2454  
Old Posted Oct 7, 2020, 4:22 AM
scottN scottN is offline
Registered User
 
Join Date: Mar 2019
Posts: 286
Quote:
Originally Posted by Migrant_Coconut View Post
More space per seat, for one. Given previous experience with flying coach, I'd argue that in this particular commute, legroom and a proper table is well worth losing an extra 45 minutes of your life.
Also the air can be freely circulated with the outside world. On aircraft the cabin is pressurized, so any replacement air brought into the cabin from outside needs to be compressed, which uses fuel. The same air is recirculated over and over.
Reply With Quote
     
     
  #2455  
Old Posted Oct 7, 2020, 3:46 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,805
Quote:
Originally Posted by Migrant_Coconut View Post
A reminder that HSR is $55 million per klick. It'd be great for Squamish and Whistler...
$55 million per klick - where? North Vancouver to Squamish is some of the most challenging terrain anywhere, surely a ROW that meets the curvature and grade restrictions of HSR is going to be a lot more than that.
Reply With Quote
     
     
  #2456  
Old Posted Oct 7, 2020, 4:47 PM
scottN scottN is offline
Registered User
 
Join Date: Mar 2019
Posts: 286
Quote:
Originally Posted by aberdeen5698 View Post
$55 million per klick - where? North Vancouver to Squamish is some of the most challenging terrain anywhere, surely a ROW that meets the curvature and grade restrictions of HSR is going to be a lot more than that.
Worst case would be tunneling the whole way. It's 36km of tunnel from horseshoe bay to squamish. Gotthard base tunnel is 57km long, double tracked and cost about 14 billion CAD - that's 245 million per km. I believe that trains generally run at 200km/h in the tunnel.

The seymour valley seems like it would be much more suited to railway construction. Long tunnels would still be needed to reach Squamish.
Reply With Quote
     
     
  #2457  
Old Posted Oct 7, 2020, 7:09 PM
Tvisforme's Avatar
Tvisforme Tvisforme is offline
Registered User
 
Join Date: Sep 2014
Location: Metro Vancouver
Posts: 2,179
Quote:
Originally Posted by scottN View Post
Worst case would be tunneling the whole way. It's 36km of tunnel from horseshoe bay to squamish.
"OK, so which mountain do you want to tunnel through?"

"All of them."
Reply With Quote
     
     
  #2458  
Old Posted Oct 7, 2020, 7:19 PM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,742
If you ask me the MVX ideas are not nearly as bad as everyone is making it seem.

The long distance components of the MVX are basically supposed to be a rail infrastructure alternative to big highway expansion. Think: instead of expanding Highway 1 through the valley from the (future) 6 lanes to 8-10 lanes, or instead of building a new highway corridor around 16th Avenue in Surrey/Langley; or instead of completely 4-laning the Sea to Sky. I don't believe they've set any specific timeline, so this could be viewed as a vision for a 20-40 year timeframe.

The Langley to Chilliwack portion could reasonably be instated as the commuter rail solution that Valley folk have wanted, and use the Highway 1 and Highway 10 (Glover Road) rights-of-way for inexpensive construction. A segment heading into Downtown Vancouver could be integrated with the cross-border high speed rail, using the same right-of-way. I already had an idea for something like this, since the proposed cross-border high speed trains aren't actually going to be that frequent, leaving room for all sorts of other service you can run in between those trains. Then pursue the North Shore extension as a 4th (or 3rd) crossing of the Burrard Inlet, which would also extend the reach of cross-border rail. Portland/Seattle to Whistler anyone?

If the provincial goverment were to study the concept, it could compare the benefits of building with high-speed-rail versus upgrading the existing rail line, or a number of hybrid solutions with high-speed and semi-high-speed segments. The Fraser Valley segment would definitely be suitable as HSR IMO and a study around the MVX concept would put high-speed Valley commuter rail squarely on the map, even if it's developed independently.

The costing the MVX group developed ($7-16 billion) is actually based on the same figures adopted for one of the studies for high speed rail linking Vancouver and Seattle/Portland. There's a detailed breakdown in their study.
Reply With Quote
     
     
  #2459  
Old Posted Oct 7, 2020, 7:34 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,182
That's a lot of ifs; the Cascadia HSR is already super ambitious even with three major cities, so I'd want to see a whole lot more studies for a mere tourist/commuter line. Think of how many SkyTrains we could have for $7-16 billion.
Reply With Quote
     
     
  #2460  
Old Posted Oct 7, 2020, 8:35 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,679
Quote:
Originally Posted by scottN View Post
Worst case would be tunneling the whole way. It's 36km of tunnel from horseshoe bay to squamish. Gotthard base tunnel is 57km long, double tracked and cost about 14 billion CAD - that's 245 million per km. I believe that trains generally run at 200km/h in the tunnel.

The seymour valley seems like it would be much more suited to railway construction. Long tunnels would still be needed to reach Squamish.
14 billion worth of economic stimulation
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 4:53 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.