View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #10841  
Old Posted Sep 23, 2020, 1:00 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Hi everyone. I'm an Ottawa forumer and we're currently having conversations about a fantasy Bank Street subway. Numbers have been thrown around and we figured the Broadway extension could be a good starting point for that.

The contract award for Broadway extension was $1.728 Billion, but the budget is $2.83 Billion. Before the contract went out to tender, how much did the Province/Translink estimate the contract would be? And where will the other odd $Billon be invested? I assume the award contract does not include rolling stock and I know it doesn't include an OMSF, but I was hoping your group could provide more info.

Thank you!
     
     
  #10842  
Old Posted Sep 23, 2020, 9:00 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Quote:
Originally Posted by chowhou View Post
I thought we'd known for a while that stations will have centre platforms (Or at least Broadway-City Hall would). It's ultimately a continuation of the Millenium Line so you'd expect things to generally be similar to what's existing.
Yeah, but this is construction info from the contractor, not reference material from the Province.
So it's just confirmation of consistency with the reference "artist concept" drawings / scheme.
The contractor is responsible for design, so there could be changes over what the Province has issued for publicity.
     
     
  #10843  
Old Posted Sep 23, 2020, 9:06 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Quote:
Originally Posted by J.OT13 View Post
Hi everyone. I'm an Ottawa forumer and we're currently having conversations about a fantasy Bank Street subway. Numbers have been thrown around and we figured the Broadway extension could be a good starting point for that.

The contract award for Broadway extension was $1.728 Billion, but the budget is $2.83 Billion. Before the contract went out to tender, how much did the Province/Translink estimate the contract would be? And where will the other odd $Billon be invested? I assume the award contract does not include rolling stock and I know it doesn't include an OMSF, but I was hoping your group could provide more info.

Thank you!
My guess is the items excluded from the design-build contract would be:
- Provincial costs of the operating Broadway Subway office
- land acquisition
- vehicles
- contingency fund
     
     
  #10844  
Old Posted Sep 23, 2020, 3:41 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by officedweller View Post
My guess is the items excluded from the design-build contract would be:
- Provincial costs of the operating Broadway Subway office
- land acquisition
- vehicles
- contingency fund
Sounds about right. Thanks!
     
     
  #10845  
Old Posted Sep 23, 2020, 3:47 PM
goodcitywhenfinished goodcitywhenfinished is offline
Registered User
 
Join Date: Sep 2020
Posts: 42
Who is the design architect for the stations? I read IBI group somewhere is that still the case?
     
     
  #10846  
Old Posted Sep 23, 2020, 3:57 PM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,349
Quote:
Originally Posted by goodcitywhenfinished View Post
Who is the design architect for the stations? I read IBI group somewhere is that still the case?
IBI Group is part of the team. So is Dialog Architecture.
     
     
  #10847  
Old Posted Sep 23, 2020, 5:01 PM
dleung's Avatar
dleung dleung is offline
Registered User
 
Join Date: Nov 2009
Location: Toronto
Posts: 6,554
Quote:
Originally Posted by chowhou View Post
I thought we'd known for a while that stations will have centre platforms (Or at least Broadway-City Hall would). It's ultimately a continuation of the Millenium Line so you'd expect things to generally be similar to what's existing.



-Translink via Daily Hive
Wish they shifted the platform west so that it's not so off-center in terms of loading. Amazing that this will likely be the 2nd or 3rd busiest station in the system, but still has only 1 entrance
     
     
  #10848  
Old Posted Sep 23, 2020, 6:20 PM
chowhou's Avatar
chowhou chowhou is offline
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,914
Quote:
Originally Posted by dleung View Post
Wish they shifted the platform west so that it's not so off-center in terms of loading. Amazing that this will likely be the 2nd or 3rd busiest station in the system, but still has only 1 entrance
The difference between this station and Waterfront or Commercial is every direction will be served by skytrain, so there is no need for a street level transfer unless your destination is at Cambie and Broadway. At Commercial-Broadway, heading up Commercial and (currently) heading down Broadway both require surface transfers. At Waterfront the east-west and really most destinations downtown require a bus. At Cambie, once the 99 is gone, the only buses left are the 15 which is more of a local inter-station bus and the 17, which north of BW-CH matches the 15 and can be met at Oak-VGH.

Most people just won't be leaving the station at ground level.
     
     
  #10849  
Old Posted Sep 23, 2020, 7:25 PM
BCPhil BCPhil is offline
Registered User
 
Join Date: Jun 2009
Location: Surrey
Posts: 2,578
Quote:
Originally Posted by dleung View Post
Wish they shifted the platform west so that it's not so off-center in terms of loading. Amazing that this will likely be the 2nd or 3rd busiest station in the system, but still has only 1 entrance
Digging straight down is much easier and done all the time (for parkades under towers).

If you shifted the platforms to the west a bit, then part of the station would be under the Canada Line tunnel. And the geology in the area probably isn't the best for using mine like tunneling techniques on that scale under a key piece of infrastructure. And being build as cut and cover probably only adds to the weight of the Canada line on the soil and disturbing it with a giant cavern underneath is probably not a good idea. Best case it would only add years and millions to the project, worst case destroy the Canada line.

Just ask how that technique is doing in Toronto or Ottawa...

The Ellington LRT is supposed to open in 2022, but I wouldn't be surprised at all if the Broadway subway still opens before they are done digging the Ellington West station.

Quote:
Originally Posted by chowhou View Post
The difference between this station and Waterfront or Commercial is every direction will be served by skytrain, so there is no need for a street level transfer unless your destination is at Cambie and Broadway. At Commercial-Broadway, heading up Commercial and (currently) heading down Broadway both require surface transfers. At Waterfront the east-west and really most destinations downtown require a bus. At Cambie, once the 99 is gone, the only buses left are the 15 which is more of a local inter-station bus and the 17, which north of BW-CH matches the 15 and can be met at Oak-VGH.

Most people just won't be leaving the station at ground level.
Yeah, the corridors between the lines will be much busier than the station entrance. But that said it looks like they may widen the entrance. They'll have to at least do some major reconstruction to widen the area past the fare gates for those new elevators.

Just picture how busy Commercial is if you take away the 99 and all those passengers are coming up from the M line.

In fact I think they realize this because there appears to be extra escalators between the Canada Line level and the Broadway Project Concourse
     
     
  #10850  
Old Posted Sep 23, 2020, 7:45 PM
goodcitywhenfinished goodcitywhenfinished is offline
Registered User
 
Join Date: Sep 2020
Posts: 42
Quote:
Originally Posted by Changing City View Post
IBI Group is part of the team. So is Dialog Architecture.
IBI Did a pretty good job with the underground stations in Ottawa, glad to see them working here.
     
     
  #10851  
Old Posted Sep 23, 2020, 7:55 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by goodcitywhenfinished View Post
IBI Did a pretty good job with the underground stations in Ottawa, glad to see them working here.
Looking forward to seeing some renderings.
     
     
  #10852  
Old Posted Sep 23, 2020, 8:00 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
There are probably emergency exits not shown (ie the one at 10th is not shown)
     
     
  #10853  
Old Posted Sep 24, 2020, 12:36 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,187
Quote:
Originally Posted by dleung View Post
Wish they shifted the platform west so that it's not so off-center in terms of loading. Amazing that this will likely be the 2nd or 3rd busiest station in the system, but still has only 1 entrance
Repost:

Quote:
Originally Posted by Migrant_Coconut View Post
No chance of a second entrance in 2025, which —, but there's plans for K.O. panels toward City Hall and the opposite corner (the A&W) that can become entrances if the need arises. It helps that much of the current in/out traffic is B-Line riders.
     
     
  #10854  
Old Posted Sep 24, 2020, 1:28 AM
teriyaki teriyaki is offline
Registered User
 
Join Date: Nov 2008
Posts: 606
I think the eastern side walkways/stairs/escalators will be disproportionately used way more often than the west side ones.

The east side walkways will appeal more to the people embarking at Broadway City Hall as its the most direct route to the platform from street level.
The east side will likely see more transfer from Canada Line as well as that is the the inbound trains from Richmond and YVR Airport will offload their transfer passengers.

I think if we measure Canada Line to Millenium Line transfers, we're going to see the numbers stacked towards transfers coming from the south (Richmond/YVR direction).
     
     
  #10855  
Old Posted Sep 24, 2020, 2:18 AM
scryer scryer is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,964
Quote:
Originally Posted by teriyaki View Post

I think if we measure Canada Line to Millenium Line transfers, we're going to see the numbers stacked towards transfers coming from the south (Richmond/YVR direction).
I'm not sure if I agree with this speculation only because the stations north of Broadway-City Hall carry high volumes.
     
     
  #10856  
Old Posted Sep 24, 2020, 2:32 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,597
Quote:
Originally Posted by scryer View Post
I'm not sure if I agree with this speculation only because the stations north of Broadway-City Hall carry high volumes.
I'd suspect a bunch of the transfers will be from people on the Expo and Millennium lines who travelled to downtown Van to transfer to the Canada Line and now won't have to. It could take some of the strain off the downtown stations.
     
     
  #10857  
Old Posted Sep 24, 2020, 3:14 AM
Tvisforme's Avatar
Tvisforme Tvisforme is online now
Registered User
 
Join Date: Sep 2014
Location: Metro Vancouver
Posts: 2,182
It will be interesting to see if this afternoon's Throne Speech mention of increased infrastructure spending will translate into an earlier start to the UBC and Langley extensions. We've heard the promises about infrastructure before, of course, but now - with the added push to create jobs and spend on green projects - I wonder if it will tip things in favour of those lines.
     
     
  #10858  
Old Posted Sep 24, 2020, 5:18 PM
scryer scryer is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,964
Quote:
Originally Posted by Sheba View Post
I'd suspect a bunch of the transfers will be from people on the Expo and Millennium lines who travelled to downtown Van to transfer to the Canada Line and now won't have to. It could take some of the strain off the downtown stations.
Touché.

I am incredibly thankful that we are getting the Millennium extension to begin with and I must admit that it is truly fun (and fascinating) trying to predict future transit patterns.
     
     
  #10859  
Old Posted Sep 24, 2020, 5:45 PM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,831
Quote:
Originally Posted by Tvisforme View Post
It will be interesting to see if this afternoon's Throne Speech mention of increased infrastructure spending will translate into an earlier start to the UBC and Langley extensions. We've heard the promises about infrastructure before, of course, but now - with the added push to create jobs and spend on green projects - I wonder if it will tip things in favour of those lines.
Seems doubtful since they would need local/provincial money and they aren't exactly that safe at being able to pass that Throne Speech.
     
     
  #10860  
Old Posted Sep 24, 2020, 6:35 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
broadwaysubway.ca current construction work page lists most recent work as:

"September 18, 2020 – Trolley Wire Relocation Project
Weekend work will occur Sep 19-20 to remove overhead trolley wires at the intersection of Broadway/Oak"

They've done a bunch of these as well as advance utility relocation projects. Waiting for the first construction that isn't one of these two!

The main broadwaysubway.ca page says "Construction will begin in fall 2020, with the line in service in 2025."

Fall 2020 began a few days ago and goes until Dec 21st so it could be almost three months and still technically start in fall 2020. Hopefully sooner!
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:14 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.