Originally Posted by Migrant_Coconut
Given the foot traffic in the Greektown area (and eventually the Point Grey Village/Jericho area), one could argue that even the minor intersections need to stay open. And City staff have said that they'd need to run trams the length of the block to meet demand.
Trams are a nice idea, but for the most part, their role in Metro Vancouver is met by the RapidBuses. Your best shot is a former rail corridor like Arbutus or Railway Avenue that doesn't have a lot of intersections to begin with, and even that's a maybe.
|
The Jan 2019 "Rail to UBC Rapid Transit Study" seems biased to me. I concur with your comments. But the study does not indicate a 100 year time horizon for planning and seems to suggest that a 2 car train is maximum because of the only intersection from Arbutus to UBC that is short (macdonald to stephens).
When it comes to volume, it's rapid bus, then tram, then underground (tram still really).
In terms of intersections. the report adds a Blenheim stop. When planning for lrt capacity, the distance between stops is the most important thing.
The Jan 2019 study shows the maximum capacity of the bus as being 25,000 daily average ridership and it's already at 50,000. So the model used is flawed. I would agree that pass ups and capacity is already being hit. But we are talking about students as the main driver of the volume as admitted in the same report and it's just WB early morning volume. By the year 2045, after doing sensitivity analysis of the land use in UBC, it was determined that it would impact EB traffic and this is not capacity constrained. Yes they can build big in UBC, but it's not the volume being planned for. Given a 100 year timeline (which the report is not doing), I would agree that things would be different and then this report makes more sense. I don't know what is right or wrong to be honest.
I agree with your comments and specifically agree with the link you provided, but the study parameters in the Jan 2019 report are not the same as the ones mentioned in the article: Namely full block size (4 car trains) and 100 year timeline.
I agree with this:
City staff have said
Not the seemingly biased report:
Jan 2019: Rail to UBC Rapid Transit Study
McElhanney Consulting
https://www.translink.ca/-/media/Documen...9_01_24_technical_report_rail_to_ubc.pdf