Interim sessions of the Utah Legislature start next week and they've released the list of potential study items for each committee. For the Transportation Committee, there's a study item regarding replacing Frontrunner (yes, all of Frontrunner) with BRT???
Quote:
|
Front Runner upgrades: study in conjunction with Utah Transit Authority comparing the total costs, and costs per commuter and comparative travel times over the long term of double tracking and electrifying the current system compared to those same costs for changing the train system out and replacing it with bus rapid transit running along the same line.
|
Potential Interim Study Items 2020