Quote:
Originally Posted by Aylmer
But it could be good for users too if local bus lines take the Rapibus to Hull.
Roughly 50% of downtown-bound Gatineau riders are headed to Hull, 50% to Ottawa. If the local Gatineau sector lines used the Rapibus infrastructure to run to downtown Hull (like Ottawa's express buses did) then half of riders would go from one transfer to a direct ride. Those headed to Ottawa would still only require one transfer, occurring in downtown Hull rather than at a local Rapibus station. Any East-West trips would similarly only require one transfer instead of the two currently required (ignoring the once-per-hour 800, too infrequent to be useful).
So half of all Gatineau-sector trips shed one transfer. The other retain a single transfer, but has a traffic-free entry to Ottawa. And the STO gets efficient vehicle usage and tram tracks unencumbered by buses.
The only losers in this scenario are Hull riders (30-series buses) which go from no transfers to one transfer for half their riders. But it's arguably a draw because those buses currently take a painfully long routing across the MC bridge. Even with a transfer, trips to downtown Ottawa will be much faster.
|
+1, that makes a ton of sense. I will probably suggest such a setup in the public consultation... Although it's a bit too complex of a thought to be neatly summarized in an "as we heard it" report. To be honest they are doing public consultation in June and presenting the preferred Ottawa option in July. That is too close together for the public consultation to play a role in the Ottawa insertion decision. Between June and July they are probably just finalizing the presentation and renders.
Anyway, the only thing about a downtown Hull transfer between Rapibus and the Alymer tram is where to put it. It has to be far enough into Hull to have a good portion of tram passengers already disembarked. My money would be on a reorganization of the Terrace de Chaudière plaza into a bus loop and LRT transfer station.
Speaking of money. Anyone want to make bets on the ultimate recommendation. 2 parter...
Part 1: Full tram, Hybrid LRT south, or Hybrid LRT north.
Part 2: Wellington surface or Sparks tunnel.
My bet is Full tram, Wellington surface (although personally I want Sparks tunnel).