Quote:
Originally Posted by ilikeredheads
We've been through this. Double tracking Brighouse is just not gonna happen. The reality is that this is a mistake Richmond will have to live with.
|
It will happen as the population growth around brighouse is huge. Also its already listed on translinks 15 year plan. It wont be a impossible. just will require piers to span to the center of 3 road. and a station that would span both sides.
The bus loop is being worked on as we speak.
There is a number of 600 plus unit projects all south of westminister highway. So over the next 10 years or so will see over 1000 people move into dt richmond