HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Dec 30, 2019, 11:34 PM
RationalPhi RationalPhi is offline
 
Join Date: Oct 2019
Posts: 11
Quote:
Originally Posted by SidetrackedSue View Post
But no-one remembers the reason the temporary bridge was shifted over to Roosevelt.
It's discussed in the Scott Detour Presentation from April 2017 (reuploaded as it vanished along with the stage2lrt website). As per page 13, the Scott-Churchill-Workman route was screened early out due to "High bus volumes and noise levels on a local road (Workman Ave)". The recommended route was always to extend Scott, cross at Roosevelt, then build a dedicated road to the SJAM with noise barriers.

Basically there was much handwringing over the residents of Churchill North (Jeff Leiper notably called the potential routing of buses from Scott to Churchill North to SJAM as a "nightmare scenario") and those of Workman Ave (they get a full noise barrier between them and the transitway detour), but not a peep for the Taiga residents.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 11:51 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.