Quote:
Originally Posted by rofina
Viewcones could be a factor. But its likely to do with costs more than anything else.
|
That is just ridiculous.
Can you think of a single office project being built right now that is
not building precisely to the maximum height permitted by the city, whether it be 92 metres or 168 metres? Whatever the permissible height for an office site is, the developers are building to it, down to the very foot:
The permissible height for 410 West Georgia is 92 metres; the developers are building to
92 metres. The permissible height for 601 West Hastings is 109 metres; the developers are building to
109 metres. The permissible height for 320 Granville is 115 metres; the developers are building to
115 metres. The permissible height for 753 Seymour is 123 metres; the developers are building to
123 metres. The permissible height for the Stack was 168 metres; the developer's proposed to build to
168 metres.
And the permissible height for 601 West Pender is 337 feet, 9 inches; the developers are proposing to build to
337 feet, 6 inches:

Source:
https://dailyhive.com/vancouver/601-west-pender-street-vancouver-office-tower
In every case, the developers are using up every single damn foot of height the city will allow.
The city-mandated height limit is
exactly the determining factor for this building's proposed height (and every other current office project's height). There is zero basis (and is preposterous) to think otherwise.