Quote:
Originally Posted by adam-machiavelli
None of these problems surprise me given the new system was designed without any redundancies. Looks like Ottawa will need a downtown relief line like....now.
|
And we could have had it already running. Now, it looks impossible. We put all our eggs in one basket, and oops, there goes the basket.
I expect they will resolve many of the problems but we will never achieve 100% train reliability, so the problems will continue fairly frequently. In cities like Toronto, Montreal and Vancouver, there continue to many parallel bus, trolley and streetcar routes running into downtown, usually very frequently.
We need a plan for long-term redundancy in some form. For example, return the old Route 85 Carling to run on its former route via Bronson to downtown. Why not combine Route 9 and 10 as a big circle route? Eliminate nuisance short distance transfers in downtown on local routes, which are designed to frustrate users and force longer walks. Boost frequency on downtown routes so they can be real alternatives. There are probably others.
I have already mentioned that City Hall is now in a transit desert. There is no need for this. There should be frequent bus routes crisscrossing downtown in every direction. Instead, our remaining bus routes are disjointed and have questionable frequency. I have seen bus routes which used to run on a 10 minute frequency fade to 12 minute then 15 minute then 20 minute and now 30 minute frequency. All justifiable no doubt in the accountants minds but resulting in continuous ridership loss, while we continue with infill projects needing ample parking because of poor transit, even in central neighbourhoods.