I'm pretty experienced when it comes to experimenting with Commuter Rail in Vancouver. So here we go with the last 2 pages.
Quote:
Originally Posted by lokyin
Regarding WCE commuter rail between Waterfront and Moody/Coquitlam to be extended to bidirectional-allday, is the entire current corridor of land owned by CP? or does CP just own their current rail track? Can we technically double/triple-track alongside the corridor for WCE? Is there room?
Similarly, could we track along CN's rail from Pacific Central outwards southeastbound?
Are there any realistic corridors for commuter rail to hit Langley so that it makes stops at local population centers at Langley, then Abbotsford, then Chilliwack? Perhaps turn south from the existing Pitt Meadows WCE station down 200th?
|
1. CP owns the WCE corridor. The issue is the Waterfront section, where you’d likely have to turn Waterfront Road to some sort of viaduct structure in order to have enough room.
2. Yes.
3. Yes. The SRY corridor that Zweisystem will never stop yelling about. Come on guys, it's not THAT windy.
The CN route SOF is a faster corridor with a wider corridor (mostly), but misses the Town Centers of Langley and Surrey. It’s only really good if you want to go directly to the exurbs fast.
There's also a BC Hydro ROW Alignment through Surrey, but it kind of bypasses any town centers, so
Should be ok for HSR though.
The SRY corridor should allow for only building 1 new rail (with passing rails) and still get frequencies to 15 minutes. It's not the most used railway in SOF- the mainline is CN, so even 10 minutes may be feasible.
Quote:
In Phase 1, it was contemplated that single track with two-way operation would be feasible, with
passenger trains passing at stations. In order to test the feasibility of this operating
arrangement, a microsimulation was carried out to examine whether single track / two-way
operation is feasible for a range of DMU headways, 15 minutes and 10 minutes. This analysis
concluded that two-way operation is feasible with passing at every station if headways are 15
minutes or greater, but delays would be excessive and significant conflicts would be
experienced if headways are 10 minutes or less.
|
^From the Phase 2 Evergreen Line study
15 minutes is double the current capacity on the WCE.
3. See the studies I posted.
Quote:
Originally Posted by Sheba
It's come up on here before - not everyone is trying to get to downtown Van. A SoF line could just as easily terminate at Surrey Central (aka becoming the SoF downtown). It's like saying your North Shore line MUST terminate in downtown Van.
|
Well, getting it to Downtown is optimal, both for Commuter Rail and Skytrain to North Shore. The ridership potential from going Downtown is not trivial.
SRY does not terminate at Surrey Central- it terminates at Scott Road. BIG difference.
Quote:
Originally Posted by Migrant_Coconut
Likewise, Vancouver can't be called a "major city" in the same breath as Toronto/Montreal/Europe/Asia/blah blah blah. Not enough political/economic/logistical strength to be analogous. Our league is Seattle and Portland and Calgary. I'm not seeing commuter rail to Olympia just yet, or any kind of massive rapid transit expansion like ours.
Cost. Benefit. Ratio. Seeing the difficulty of just getting funding for UBC and Langley, adding another $2-3 billion to twin an already redundant line is just wasteful. Let's spend that effort on Coq-Mission or Mission-Chilliwack or something productive.
|
Not yet. There are plans to get to Dupont, and it’s not that for from there to Olympia. Seattle actually has a ton of RT plans in way.
It’s not wasteful- it would connect Cloverdale T. Center and take pressure off the Expo (which has similar expected lifespan to the Canada Line due to ridership growth- and less if you can’t hit the crucial 75s headway.
Quote:
Originally Posted by Migrant_Coconut
Mission would be much the same; it already had 80+ percent of its population when the WCE opened. It's still growing at the same rate. The train went there because the town was big, not the other way around.
|
Mission has a 30% commute to Metro-Van ratio- compared to Abbotsford’s ~10%. The only explanation is Commuter Rail.
So, yes, it would help solve the housing crisis by actually making helping Abbotsford a viable suburb to Metro Van- if you can hit the speeds necessary.
Development DOES occur near WCE. Coq and PoCoq Central got a head-start with tower construction due to the WCE, and even Port Haney gets Medium Density. Otherwise, there would be no towers in Coq Central right now, without RT to support them. (OK, Evergreen Line, but few of those are actually finished- Look at Burquitlam. That's what Coq. Central would be like today without WCE)
No offense, but please be careful when talking about suburban stuff. It's a gaping hole in your perspective.
Quote:
Originally Posted by swimmer_spe
The line going to White Rock passes through Surrey.
And the current line could have more stops.
It is sad that you really are not understanding this. What is worse is that you are doing it on the wrong forum.
|
The line to White Rock is even more windy than SRY and is isolated from the population centers in North Delta and Surrey by industry, bogs, Freeways, and a hillside. It’s actually probably one of the worst corridors for Commuter Rail. Skytrain is actually probably faster <CALC?>.
Even a line going from Marpole/Marine Dr.-YVR-Steveston-GMB/Ladner-Tsawwassen is better. And there’s not even any rails on the route, only a ROW.