Quote:
Originally Posted by aberdeen5698
That's kind of the point. You get a hulluva lot better bang for every one of your bucks spent building transit than you do building roads. It's why investment in a new bridge was seen by many as lopsided spending by the provincial Liberals, given that they had crippled Translink's attempts to acquire funding for transit expansion.
|
Except I meant 6 as in absolute maximum. Realistically, if we moved up the say, next
6 transit projects up and magically completed them (Skytrain to UBC, Langley, Tunnel under Vancouver Harbour, L-Line Skytrain, Marine Drive Skytrain, Hastings Skytrain), you'd probably get a cost over
10 Billion overall- with 0 new Bridges or Lanes for Transit.
Literally building ANY new roads across the river makes Transit
seem small compared to Roads.
The 2 other bridges over the Fraser are Skytrain Langley-Maple Ridge and Skytrain S.Delta-Richmond, neither of which are likely within the next few decades.
Quote:
Originally Posted by Mininari
Where exactly is rail rapid transit supposed to go on the south end of this crossing exactly? To Ladner and Twassessen? I'm not sure these are designated high-density growth areas requiring rapid transit service? As much as I'd love to see train service all the way to the ferry, I can't see that being cost effective.
Besides, someone has to pay for Mayor Adam West's Skytrain system in Surrey.
|
Ladner is
technically considered a municipal town center- that's surrounded by an ocean of ALR and has the population of Walnut Grove.

Tswwaseen isn't much better.
Every time someone posts a new Skytrain map on the Transit Fantasies Thread though, there it is- a Skytrain across to South Delta.
This is one place where BRT/LRT is probably the only thing that's ever going to happen.