Quote:
Originally Posted by kmcamp
Anyway there are two serious flaws in our system that I feel, which is Tunney's and the bus loop at Hurdman which is not temporary. Tunney's can't be fixed and we'll just have to live with it, but they still have a chance to correct their Moodie mistake and put in a centre platform before construction begins in earnest out there.
The Hurdman bus loop needs some actual shelter, they could use the elevated track as a structure to build a real bus terminal more along the lines of what Toronto has, as it's a permanent feature unlike Blair and Tunney's yet has the same temporary feel.
|
I've said before that them cheaping out was a concern. And it's now becoming obvious that their cheaping out is coming back to bite riders in the six. The crappy bus loops are just symptoms of a wide disease if you will.
Their decision making for centre platforms is weird. They don't seem to have taken into account that centre platforms are convenient for a terminus. And all their planning seems to consider eventual extensions, with centre platforms reserved entirely for stations where they seem to think it would have been cheaper to build a centre platform (fewer stairs, escalators and elevators). It's basically a fluke that Blair got a centre platform. It seems like Blair, Pimisi and Cyrville got centre platforms mostly as their long term traffic doesn't warrant dual platforms with larger stations. If this thinking remains at Moodie, expect them to stick to dual platforms with an eye to extension into Kanata.
I would add a third major flaw: rolling stock. Now that we're at full service. I am starting to see issues with their selection and design of rolling stock. Everyone crowds at the multi-pronged stanchion between the doors. Nobody moves into the aisle between the seats, because the stanchions are really far apart and effectively only one person can hold on at each. It's obvious that they would have been better with wider heavy rail rolling stock. And having stuck with LRT, they should have put in only sidefacing perimeter seating and a lot more standing room, as is usually done on narrower rolling stock in many busy metro systems.
Quote:
Originally Posted by kmcamp
Edit: the other flaw was that the #ReallyBigServiceChange was really a mask for a #ReallyBigServiceCut. I don't the routing is the problem, it's the major reduction in frequencies across the entire bus network, like the 39 in Orleans only running every 30 minutes off peak, or increases upwards of other routes to the "frequent" 15 minute standard
|
You really need to tweet this out at Manconi and Watson. It's pretty disgusting how much they cut bus schedules.