Quote:
Originally Posted by GoTrans
You need to add the trains operated by CP Rail to your graph, especially between Montreal - Quebec.
|
I was explicitly referring to "VIA Rail’s remaining Corridor routes" (i.e. those Corridor routes, which survived the 1990 cuts), but if you have such a clear opinion about what I should make my figure about, then why don't you create your own (I've linked to my timetable archives, which includes several gigabytes of CN, CP and VIA timetables, so more than enough to find whatever answers you are looking for)? Or maybe you could just ask politely if it wasn't too much of an inconvenience for me to also add certain routes and I might even feel compelled to do the work myself, because (as you might have guessed), I have already created a timetable database, which makes any timetable analysis dramatically less time consuming than working yourself through hundreds of PDFs...
Quote:
|
Are the trains such as the Ocean and the St Laurent that stopped in Levis rather than Ste Foy or Quebec as being part of the Montreal - Quebec total?
|
I've only counted Corridor trains and therefore no trains which continue beyond the CMA of Quebec City. However, I have counted transcontinental trains between Montreal and Ottawa (provided they operated via the Alexandria Subdivision) and international trains between Toronto and Sarnia-Chicago or Windsor-Detroit (provided they operated via the Dundas or Guelph Subdivisions), as these trains acted as Corridor trains and linked through London, Sarnia or Windsor, rather than only serving an adjacent city on the opposite side of the river (as in Quebec City with Levis).
Quote:
|
What about the pooled trains between Ottawa and Toronto running on CP trackage?
|
The routes via the Havelock or Belleville subdivisions have been abandoned in 1965/66 and are therefore none of the remaining corridor routes. However, once HFR becomes reality, I will of course include the services via Havelock and Trois-Rivières.
Quote:
|
Rather than list weekly mileages it would be more user friendly to graph the weekly train frequency on each route.
|
Agreed, but this would not allow to meaningfully aggregate multiple routes and would make it difficult to allow for trains serving only part of a route (e.g. Toronto-Kitchener vs. Toronto-Kitchener-London-Sarnia).
Quote:
|
This would increase the frequency in the 1960's and show the real impact of government cut backs over the years which to date have not been reversed.
|
You see, you are trying to make an entirely different point than I do: I'm arguing that the cuts in frequency on VIA's surviving Corridor routes have been almost reversed (or more than reversed, if we exclude Southwestern Ontario), whereas nobody denies that there were more intercity rail services offered throughout the 1980s over the railway network across the entire Corridor than there are today...