HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Closed Thread

 
Thread Tools Display Modes
     
     
  #9481  
Old Posted Aug 18, 2019, 6:17 PM
Mike328 Mike328 is offline
Registered User
 
Join Date: May 2012
Posts: 262
Quote:
Originally Posted by yveseluj View Post
Looks like the city is adding a running/biking pathway along McDonald St. by the Douglas Park hill. This is so long overdue - go there any evening during the summer and its dangerous for everyone as there's no sidewalks at all, nor are there shoulders on the road for bikers/runners. Not sure how far they're taking it, but anything is an improvement.

One step closer to encircling the entire lake with bike paths.
Good news. Paved or gravel?
     
     
  #9482  
Old Posted Aug 19, 2019, 1:51 AM
yveseluj's Avatar
yveseluj yveseluj is offline
Registered User
 
Join Date: Jun 2015
Location: Regina, SK, Canada
Posts: 347
Quote:
Originally Posted by Mike328 View Post
Good news. Paved or gravel?
Can’t say for certain - construction wasn’t far along enough yet. I’d have to imagine it will be paved though.
     
     
  #9483  
Old Posted Aug 19, 2019, 7:10 AM
skphc08's Avatar
skphc08 skphc08 is offline
Registered User
 
Join Date: Jun 2008
Location: South Central
Posts: 238
Quote:
Originally Posted by Mike328 View Post
Good news. Paved or gravel?
Huge news!
__________________
Everything is real on this concrete and steel.
     
     
  #9484  
Old Posted Aug 20, 2019, 2:50 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 8,000
I noticed that 2 EV fast charges have been installed at Petro Can on Vic and Starlite. They had a couple of Prius plug-in hybrids there but it looked like they were just testing the chargers. In my view they should be next to a coffee shop, not a gas station. What are you going to do at a gas station for half an hour?
Walmart east is supposed to be getting Tesla Superchargers, but no sign of construction yet. 7 are slated for the TCH in SK for 2019. Moose jaw is under construction. Nothing for the yellow head or Highway 11 yet.
I recently purchased a turbo diesel and I am amazed at the fuel efficiency. My next vehicle may be an EV though.
     
     
  #9485  
Old Posted Aug 20, 2019, 3:02 PM
Kegger Kegger is offline
Registered User
 
Join Date: Dec 2012
Posts: 121
Quote:
Originally Posted by Stormer View Post
I noticed that 2 EV fast charges have been installed at Petro Can on Vic and Starlite. They had a couple of Prius plug-in hybrids there but it looked like they were just testing the chargers. In my view they should be next to a coffee shop, not a gas station. What are you going to do at a gas station for half an hour?
Walmart east is supposed to be getting Tesla Superchargers, but no sign of construction yet. 7 are slated for the TCH in SK for 2019. Moose jaw is under construction. Nothing for the yellow head or Highway 11 yet.
I recently purchased a turbo diesel and I am amazed at the fuel efficiency. My next vehicle may be an EV though.
I have been following this a bit lately and there seems to be quite a few new constructions in the past month.

Here are some pictures of the one in Whitewood.
https://twitter.com/planeboy1/status/1163472953645780992

And here is a tweet from the Co-op in Davidson that is installing a supercharger on Highway 11.
https://twitter.com/RiverbendCoop/status/1161454811612663811

I believe the other locations with stuff already built in Sask. is at the Maple Creek Co-op and maybe Swift Current as well.
     
     
  #9486  
Old Posted Aug 20, 2019, 3:07 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 8,000
Quote:
Originally Posted by Kegger View Post
I have been following this a bit lately and there seems to be quite a few new constructions in the past month.

Here are some pictures of the one in Whitewood.
https://twitter.com/planeboy1/status/1163472953645780992

And here is a tweet from the Co-op in Davidson that is installing a supercharger on Highway 11.
https://twitter.com/RiverbendCoop/status/1161454811612663811

I believe the other locations with stuff already built in Sask. is at the Maple Creek Co-op and maybe Swift Current as well.
Interesting. Tesla does not show Davidson on their map. I assume there will be some in Saskatoon, Battleford and Lloyd soon. How do these work? Does Tesla issue your a card and pin or something or does the charger know your car when it is connected?
     
     
  #9487  
Old Posted Aug 20, 2019, 3:34 PM
Kegger Kegger is offline
Registered User
 
Join Date: Dec 2012
Posts: 121
Quote:
Originally Posted by Stormer View Post
Interesting. Tesla does not show Davidson on their map. I assume there will be some in Saskatoon, Battleford and Lloyd soon. How do these work? Does Tesla issue your a card and pin or something or does the charger know your car when it is connected?
That is a very good question. I had to look it up.

https://www.tesla.com/en_CA/support/supercharging

So it sounds like you add a payment method to your Tesla Account online or using the screen in you vehicle. Charging would then be automatic when you are at the supercharger.

One thing I didn't see was how it actually does that. Is it some sort of wifi connection to the charger, is there some data soehow passed through the charging cable itself?
     
     
  #9488  
Old Posted Aug 20, 2019, 4:03 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 8,000
Quote:
Originally Posted by Stormer View Post
I noticed that 2 EV fast charges have been installed at Petro Can on Vic and Starlite. They had a couple of Prius plug-in hybrids there but it looked like they were just testing the chargers. In my view they should be next to a coffee shop, not a gas station. What are you going to do at a gas station for half an hour?
Walmart east is supposed to be getting Tesla Superchargers, but no sign of construction yet. 7 are slated for the TCH in SK for 2019. Moose jaw is under construction. Nothing for the yellow head or Highway 11 yet.
I recently purchased a turbo diesel and I am amazed at the fuel efficiency. My next vehicle may be an EV though.
Here is a tweet from @SaskPower.




Congratulations to Petro-Canada for installing its first fast-charging station in Saskatchewan! The electric vehicle charging station is one of 50 that they're installing along the Trans-Canada highway. We took two of our own electric cars to check it out. #Powering2030
     
     
  #9489  
Old Posted Aug 21, 2019, 4:27 PM
UrbanClimate's Avatar
UrbanClimate UrbanClimate is offline
Registered User
 
Join Date: Sep 2011
Location: Toronto
Posts: 398
EV charging stations in SK

Electric vehicle charging stations being built along Trans-Canada Highway in Sask.

https://leaderpost.com/news/local-news/e...built-along-trans-canada-highway-in-sask

"...Electric vehicle (EV) owners in Saskatchewan will soon have a lot more options when trying to find a place to plug in.

Tesla, Petro-Canada and Canadian Tire are all planning to build fast-charging stations in the province. Petro-Canada’s Regina station soft-launched on Tuesday, and three more in the province are expected to be up and running by the end of September.

Tesla is planning to have seven Supercharger stations in the province this year, with some already under construction. Canadian Tire is planning 10 charging locations, and is hoping to have them operating towards the end of next year.

The Tesla and Petro-Canada charging stations are both part of cross-country networks, meaning the all the Saskatchewan locations will be near the Trans-Canada Highway.

Saskatoon does have charging stations, but neither Tesla nor Petro-Canada have listed any upcoming locations in the city. A Petro-Canada representative said the company wanted to start with stations near the Trans-Canada, and more may come to the province in the future.

Canadian Tire, which received funding to build its stations through the federal government’s electric vehicle and alternative fuel infrastructure initiative, doesn’t currently have plans for a Saskatoon location. The closest one will be in Martensville.

Petro-Canada announced its cross-country network of 50 fast charging stations in February. The goal of the network is to allow EV owners to drive from Nova Scotia to Victoria, B.C., with charging stations placed approximately 200-250 kilometres away from each other. The Regina charging station, located at 2020 Coleman Cr. in the east end, is the first of Petro-Canada’s Saskatchewan stations to go online.

Petro-Canada’s other stations will be located in Whitewood, Moose Jaw and Swift Current. Petro-Canada said Saskatoon was not included because the initial goal was to establish a cross-country network of charging stations, but more may be planned in the future.

According to Tesla’s website, the company is planning to put Supercharger stations in Maple Creek, Swift Current, Chaplin, Moose Jaw, Regina, Wolsley and Moosomin. However, keen Tesla owners may have spotted other unannounced charging stations."
     
     
  #9490  
Old Posted Aug 21, 2019, 4:34 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 8,000
I actually saw people charging at Petro Canada last night. No surprise I suppose given that it is free for now. Fast charging looks like it will generally cost around $20.

Canadian Tire has the right idea. People will go in to shop while they are charging.
     
     
  #9491  
Old Posted Aug 21, 2019, 8:42 PM
one_brick_at_a_time's Avatar
one_brick_at_a_time one_brick_at_a_time is offline
Registered User
 
Join Date: Apr 2009
Location: Regina/Toronto
Posts: 2,389
Regina Information Centre Unveiled, Second Pavilion In The Works

https://www.cbc.ca/news/canada/saskatchewan/regina-information-centre-unveiled-1.5253706
     
     
  #9492  
Old Posted Aug 21, 2019, 8:49 PM
Draftsman Draftsman is offline
Registered User
 
Join Date: May 2011
Location: Regina, Saskatchewan
Posts: 989
Quote:
Originally Posted by Stormer View Post
I actually saw people charging at Petro Canada last night. No surprise I suppose given that it is free for now. Fast charging looks like it will generally cost around $20.

Canadian Tire has the right idea. People will go in to shop while they are charging.
I would guess that some employers / office parks will be putting in charging stations for their employees / tenants to use. Harbour Landing Business Park has had two charging stations at the first building on corner of Harbour Landing Drive & Parliament for some time now. I am not sure if the other two buildings have any. It might just be something that one of the tenants installed for their employees. I am starting to see a few Tesla's on Regina streets, including the Model X with the double-hinged falcon wing doors.
     
     
  #9493  
Old Posted Aug 21, 2019, 8:56 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 8,000
Quote:
Originally Posted by Draftsman View Post
I would guess that some employers / office parks will be putting in charging stations for their employees / tenants to use. Harbour Landing Business Park has had two charging stations at the first building on corner of Harbour Landing Drive & Parliament for some time now. I am not sure if the other two buildings have any. It might just be something that one of the tenants installed for their employees. I am starting to see a few Tesla's on Regina streets, including the Model X with the double-hinged falcon wing doors.
Those are not fast chargers/superchargers. They are destination chargers - much different. Several downtown parkades have them.

Last edited by Stormer; Aug 22, 2019 at 2:33 PM.
     
     
  #9494  
Old Posted Aug 21, 2019, 11:59 PM
Draftsman Draftsman is offline
Registered User
 
Join Date: May 2011
Location: Regina, Saskatchewan
Posts: 989
Quote:
Originally Posted by Stormer View Post
Those are not fast chargers/superchargers. They are destination chargers - much different. Several downtown parades have them.
Ah, yes. Thanks Stormer, that would make sense to recharge your vehicle while you are at work (and no need for a fast charge)
     
     
  #9495  
Old Posted Aug 22, 2019, 12:39 AM
one_brick_at_a_time's Avatar
one_brick_at_a_time one_brick_at_a_time is offline
Registered User
 
Join Date: Apr 2009
Location: Regina/Toronto
Posts: 2,389
Hopefully fast chargers will be coming to some of the mall properties.
     
     
  #9496  
Old Posted Aug 22, 2019, 4:58 AM
UrbanClimate's Avatar
UrbanClimate UrbanClimate is offline
Registered User
 
Join Date: Sep 2011
Location: Toronto
Posts: 398
Downtown Tourist Centre

Quote:
Originally Posted by one_brick_at_a_time View Post
Regina Information Centre Unveiled, Second Pavilion In The Works

https://www.cbc.ca/news/canada/saskatchewan/regina-information-centre-unveiled-1.5253706




https://regina.ctvnews.ca/new-tourist-centre-opens-doors-in-downtown-regina-1.4557914
     
     
  #9497  
Old Posted Aug 22, 2019, 2:32 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 8,000
There is mention of the construction on Vic. I heard on the rdaio this am that it will take 2 years. Really?

Also I was driving on Lewvan near Dewdney the other day and it looks to me like all they have done is replace some curbs. Am I wrong? It seems ridiculous to have this major thoroughfare restricted all summer for that.
     
     
  #9498  
Old Posted Aug 22, 2019, 3:03 PM
jigglysquishy's Avatar
jigglysquishy jigglysquishy is offline
Registered User
 
Join Date: Jul 2010
Location: Saskatchewan
Posts: 3,326
Planting trees in boulevards. Widening sidewalks including pedestrian bumpouts. Changing out all traffic lights and adding new street lights. Fixing the entire sewer system on Vic.
     
     
  #9499  
Old Posted Aug 22, 2019, 3:19 PM
Stormer's Avatar
Stormer Stormer is offline
Registered User
 
Join Date: Jan 2008
Posts: 8,000
Quote:
Originally Posted by jigglysquishy View Post
Planting trees in boulevards. Widening sidewalks including pedestrian bumpouts. Changing out all traffic lights and adding new street lights. Fixing the entire sewer system on Vic.
I believe they are just relining some sewers. May favourite part of this project is 80 new trees.

https://www.regina.ca/news/Victoria-Avenue-Infrastructure-and-Beautification-Project-Kicks-Off/

The City and Downtown BID really need to get on with replacing all the dead trees downtown. Even on Hamilton between 11th and 12th where they completely redid the streetscape with special soil cells and new trees just a few years ago, they are pretty much all dead. You can't just plant trees in the middle of a drought and not care for them, even with soil cells. This is especially true in front of Harvard buildings where they are inundated with ice melter. Harvard needs to take some responsibility here too. I don't blame them for their intensive winter maintenance, but unless they want ugly dead trees front of all of your buildings, they should be watering them occasionally.
     
     
  #9500  
Old Posted Aug 22, 2019, 6:19 PM
pappcam pappcam is offline
Registered User
 
Join Date: Mar 2008
Location: Regina
Posts: 817
Quote:
Originally Posted by Stormer View Post
There is mention of the construction on Vic. I heard on the rdaio this am that it will take 2 years. Really?

Also I was driving on Lewvan near Dewdney the other day and it looks to me like all they have done is replace some curbs. Am I wrong? It seems ridiculous to have this major thoroughfare restricted all summer for that.
They are also repaving it from 11th to 4th or 1st N. They did all the curbs first before doing any paving.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 10:59 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.