HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast > Atlanta


Reply

 
Thread Tools Display Modes
     
     
  #1881  
Old Posted Mar 19, 2019, 1:17 AM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 3,111
Quote:
Originally Posted by smArTaLlone View Post
Wow! Thanks for sharing this. Looks good! I can see that.
Reply With Quote
     
     
  #1882  
Old Posted Mar 19, 2019, 1:36 AM
Martinman Martinman is offline
Registered User
 
Join Date: Jul 2015
Posts: 1,641
You can see a little bit of the exterior modernization in the photo which I think looks pretty sharp.
Reply With Quote
     
     
  #1883  
Old Posted Mar 19, 2019, 8:15 PM
smArTaLlone smArTaLlone is offline
Registered User
 
Join Date: Feb 2005
Posts: 8,809
I found a photo of a completed section.


https://twitter.com/DoctorDeon/status/1079135139379269632
Reply With Quote
     
     
  #1884  
Old Posted Mar 19, 2019, 9:03 PM
Street Advocate Street Advocate is offline
Registered User
 
Join Date: Oct 2015
Posts: 3,717
Quote:
Originally Posted by smArTaLlone View Post
I found a photo of a completed section.
Yep i've been in and out of S3 a handful of times the past week and agree it looks sleek (and has improved function). Bollards could have been moved outward a bit IMO, but do a fair job as is.
Reply With Quote
     
     
  #1885  
Old Posted Apr 3, 2019, 4:22 PM
smArTaLlone smArTaLlone is offline
Registered User
 
Join Date: Feb 2005
Posts: 8,809
Hartsfield-Jackson renovates domestic terminal façade

https://www.ajc.com/blog/airport/hartsfi...-terminal-facade/T9z19xfLxR2G6IoBR1AvYO/

Quote:
Hartsfield-Jackson International Airport is updating the façade of the domestic terminal with new finishes and an updated design.

The facade construction has started at Terminal North, where a massive canopy was constructed last year. A matching canopy is under construction now at Terminal South, and is scheduled to be mostly complete by September 2019.

It will take until April 2020 for substantial completion of the Terminal North and Terminal South facade construction, according to the airport.


Reply With Quote
     
     
  #1886  
Old Posted Apr 30, 2019, 7:58 PM
smArTaLlone smArTaLlone is offline
Registered User
 
Join Date: Feb 2005
Posts: 8,809
Over 1,000 parking spaces at Atlanta airport to be eliminated soon for new gates

https://www.bizjournals.com/atlanta/news...inated.html?iana=hpmvp_atl_news_headline

Quote:
Construction to add five gates to Concourse T at Hartsfield-Jackson Atlanta International Airport is slated to begin May 1, eliminating nearly 700 spaces in the airport's North Economy parking lot as part of the process.

More than 350 spaces will eliminated two weeks later at the same parking lot on May 15. Initial construction efforts will mostly consist of preparations to make the site ready to begin the extension process.

Tom Nissalke, Hartsfield-Jackson's assistant general manger of planning, told Atlanta Business Chronicle in March the airport needs more gates to add capacity, and in order to make room for the extension, the airport must demolish and relocate the North Economy parking exit plaza, a segment of the Terminal North exit road, a Delta ground handling equipment shop and an airport fire station. The additional gates will mostly accommodate larger planes such as Delta Air Lines' A350.
Reply With Quote
     
     
  #1887  
Old Posted Apr 30, 2019, 9:14 PM
alco89 alco89 is offline
Registered User
 
Join Date: Sep 2013
Posts: 492
I struggle to understand why all the parking and road relocations are needed. Looking at an aerial view, seems like the concourse can be extended by moving the fire rescue station and leaving everything else the same. Maybe the configuration is wonkier than I'm thinking.

EDIT: I'm stupid. Clicking on the renderings in the link, I now see why.

Last edited by alco89; May 1, 2019 at 12:11 AM.
Reply With Quote
     
     
  #1888  
Old Posted May 31, 2019, 5:38 AM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 3,111
Any news construction photos at ATL lately? Can we see it?
Reply With Quote
     
     
  #1889  
Old Posted Jun 7, 2019, 3:48 PM
smArTaLlone smArTaLlone is offline
Registered User
 
Join Date: Feb 2005
Posts: 8,809
As the Canopy construction concludes, construction on the four pedestrian bridges begins.

The South Canopy is expected to be complete in early fall 2019.



https://twitter.com/ATLairport/status/1137013280336240640
Reply With Quote
     
     
  #1890  
Old Posted Jul 25, 2019, 7:54 PM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 3,111
Toddler ride on ATL airport's baggage conveyor belt

Can't you guys believe this? Toddler who ride on ATL airport's conveyor belt to TSA inline baggage screening system.

The toddler is lucky he didn't get hit with a pusher.

https://www.nbcnews.com/news/us-news/ter...ort-conveyor-belt-caught-camera-n1034276

I'm glad he is doing okay. His mother is worried about him.
Reply With Quote
     
     
  #1891  
Old Posted Jul 25, 2019, 10:00 PM
cabasse's Avatar
cabasse cabasse is online now
Registered User
 
Join Date: Jun 2002
Location: Ἀταλάντη
Posts: 4,388
/r/kidsarefuckingstupid
Reply With Quote
     
     
  #1892  
Old Posted Jul 26, 2019, 12:54 PM
bigstick's Avatar
bigstick bigstick is offline
Registered User
 
Join Date: Mar 2012
Location: 30327
Posts: 1,980
Quote:
Originally Posted by cabasse View Post
/r/kidsarefuckingstupid
Agree about kids, but parents are too...Are they going to sue now????
Reply With Quote
     
     
  #1893  
Old Posted Jul 27, 2019, 12:53 AM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 3,111
Quote:
Originally Posted by bigstick View Post
Agree about kids, but parents are too...Are they going to sue now????
No, they won't sue them.
Reply With Quote
     
     
  #1894  
Old Posted Aug 23, 2019, 10:36 PM
smArTaLlone smArTaLlone is offline
Registered User
 
Join Date: Feb 2005
Posts: 8,809
Plans Filed For Phase I of Hartsfield-Jackson Atlanta International Airport Hotel

https://whatnowatlanta.com/plans-filed-for-phase-i-of-hjaia-hotel-intercontinental/
Quote:
Majestic Carter Atlanta Mixed Use LLC is moving forward with plans to develop a 14-story InterContinental hotel adjacent the Hartsfield-Jackson International Airport’s domestic terminal.
Planning and design firm Kimley Horn submitted a land development permit to the City of Atlanta for the hotel on behalf of Majestic Cater, a partnership between Majestic Realty Co., Carter, and GPM Investments LLC.

An updated timeline for the project indicates a 2020 delivery.

Once complete, the InterContinental hotel will offer at least 440 keys, 80,000 square feet of conference space, and 60,000 square feet of Class A office space.



Reply With Quote
     
     
  #1895  
Old Posted Aug 28, 2019, 12:03 AM
smArTaLlone smArTaLlone is offline
Registered User
 
Join Date: Feb 2005
Posts: 8,809
Hartsfield-Jackson canopies nearly complete

https://www.ajc.com/blog/airport/hartsfi...nearly-complete/WJi0sRHaokJzLaGAlTkQFM/#
Quote:
The Terminal South canopy will be complete by Sept. 4.

However, there is still curbside construction going on, including work to build pedestrian bridges from the parking decks to the terminal. The above-ground walkways expected to make it safer for pedestrians while improving the flow of vehicle traffic on airport roads at the curbside.

https://www.instagram.com/p/B1NNI8JFljg/
Reply With Quote
     
     
  #1896  
Old Posted Aug 28, 2019, 3:41 PM
Buck's Avatar
Buck Buck is offline
Moderator
 
Join Date: Nov 2001
Location: Atlanta, GA
Posts: 6,929
Just have to say... our airport was already so nice on the inside. Anytime a friend visits me from out of town, they rave about Hartsfield-Jackson on their way in and out. Having flown a lot myself the last few years, I definitely prefer our airport to any in the nation and most of the international ones I've seen. But these canopies are amazing and really make an even better impression. Looking forward to the ped bridges and exterior remodeling being completed.
Reply With Quote
     
     
  #1897  
Old Posted Aug 29, 2019, 3:57 AM
N830MH N830MH is offline
Registered User
 
Join Date: Jan 2011
Location: Phoenix, AZ
Posts: 3,111
Are you sure about new concourse G is still under construction or did they cancelled it?

Any news about concourse T gates extension?
Reply With Quote
     
     
  #1898  
Old Posted Aug 29, 2019, 11:12 AM
alco89 alco89 is offline
Registered User
 
Join Date: Sep 2013
Posts: 492
Quote:
Originally Posted by N830MH View Post
Are you sure about new concourse G is still under construction or did they cancelled it?
Concourse G may not be built for a long, long time:
https://www.ajc.com/business/hartsfield-...lanned-concourse/0yQzvweqZhEPBQiRUTD1SN/

Quote:
Originally Posted by N830MH View Post
Any news about concourse T gates extension?
A couple months ago they closed about half of the North Economy parking lot in preparations to move N. Terminal Parkway to the west before they start expanding the T gates.

I really didn't think it would be necessary to move that road and all the surrounding infrastructure, but I guess it is. That whole operation is massively expensive and I wonder if it's worth it just to add 5 gates:
https://www.ajc.com/business/hartsfield-...rows-130-million/nJ1TWo9zjwLCjmHV79HiSM/
Reply With Quote
     
     
  #1899  
Old Posted Sep 1, 2019, 3:08 PM
smArTaLlone smArTaLlone is offline
Registered User
 
Join Date: Feb 2005
Posts: 8,809
The airport hotel has been redesigned and will be a Hilton rather than an Intercontinental.

Quote:
Project architect John Portman & Associates’ new design will allow for easier flow of guests through the lobby and to the rooms, and will also allow the hotel to have about 100 more rooms than previously planned, according to developers.

https://www.ajc.com/blog/airport/hartsfi...&utm_medium=social&utm_source=intown_tw#
Reply With Quote
     
     
  #1900  
Old Posted Sep 1, 2019, 11:04 PM
ATLonthebrain ATLonthebrain is online now
Registered User
 
Join Date: Aug 2001
Location: Oakland, CA
Posts: 429
Quote:
Originally Posted by alco89 View Post
Concourse G may not be built for a long, long time:
https://www.ajc.com/business/hartsfield-...lanned-concourse/0yQzvweqZhEPBQiRUTD1SN/



A couple months ago they closed about half of the North Economy parking lot in preparations to move N. Terminal Parkway to the west before they start expanding the T gates.

I really didn't think it would be necessary to move that road and all the surrounding infrastructure, but I guess it is. That whole operation is massively expensive and I wonder if it's worth it just to add 5 gates:
https://www.ajc.com/business/hartsfield-...rows-130-million/nJ1TWo9zjwLCjmHV79HiSM/
Have you seen the design for the T-North extension?? The aircraft parking positions jut out the the west, perpendicular to the rest. So all of those enabling projects are required in order to make the gates fit. The airport absolutely did not want to impede on the end-around taxiway next door because it is far too valuable to the efficiently of moving aircraft around the northside departure runway. It has been so valuable that they are building another one around the south sides innermost runway.

Also, it is definitely worth it to build these 5-gates, because it will allow AA to consolidate on T and other carriers will gain access to its former US Airways gates on D. 5 gates can handle about 60 daily departures if used efficiently. That’s significant for an airport with the steadily growing demand @ ATL.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southeast > Atlanta
Forum Jump



Forum Jump


All times are GMT. The time now is 4:10 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.