HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #10041  
Old Posted Jul 4, 2019, 1:22 AM
NewfBC NewfBC is offline
Registered User
 
Join Date: May 2007
Location: Vancouver, BC
Posts: 1,328
Quote:
Originally Posted by dothediu View Post
The Oak station entrance is going to be closer to Laurel St. Hence the name change. I think Translink bought a property there.

Also, Broadway-City Hall doesn't seem like it will have additional above ground station entrances. There will likely just be the underground connection to the existing Canada line station.
The city bought the old Scotiabank property on the corner of Broadway/Oak.

Ron.
     
     
  #10042  
Old Posted Jul 4, 2019, 4:36 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by NewfBC View Post
The city bought the old Scotiabank property on the corner of Broadway/Oak.

Ron.
the city also owns this building as of the last few years.
     
     
  #10043  
Old Posted Jul 4, 2019, 6:03 PM
dothediu dothediu is offline
Registered User
 
Join Date: Sep 2015
Posts: 70
Quote:
Originally Posted by VancouverOfTheFuture View Post
How about the Avis building next to this? Would make more sense if it was at the intersection.
     
     
  #10044  
Old Posted Jul 4, 2019, 6:43 PM
idunno idunno is offline
Registered User
 
Join Date: Feb 2010
Posts: 938
^^Potentially this building and the Avis building will form the east station house, while the Oak Street old Scotiabank building will form the west station house. Or is having two station houses too much to ask?

Last edited by idunno; Jul 4, 2019 at 8:09 PM.
     
     
  #10045  
Old Posted Jul 4, 2019, 9:50 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,524
Quote:
Originally Posted by jsbertram View Post
what about the former lululemon space that was intended for a future broadway line entrance?

https://dailyhive.com/vancouver/skytrain-broadway-extension-millennium-line-stations-vancouver
Quote:
Originally Posted by VancouverOfTheFuture View Post
i want to know when Crossroads will have its station entrance connected to the new line. it is a natural idea since, you know, it was built for that...
Someone posted a while back that the Lululemon / Crossroads space may not be feasible or may be too expensive.

What we inferred that to mean is that the Broadway City Hall platform for the Broadway Subway may be located wholly east of Cambie Street - so the entrance at Crossroads, being west of Cambie, would require a passage under the Canada Line tunnels to reach the new platform.
An Oak station in the block east of Oak (at Laurel) also aligns with a Cambie station shifted to the east as well.

So if the Crossroads entrance were to be used, it would just access the Canada Line station, without direct access to the new Broadway Subway station - and could be considered out-of-scope for the Broadway Subway (even if it increases overall station circulation).
     
     
  #10046  
Old Posted Jul 4, 2019, 9:54 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by officedweller View Post
Someone posted a while back that the Lululemon / Crossroads space may not be feasible or may be too expensive.

What we inferred that to mean is that the Broadway City Hall platform for the Broadway Subway may be located wholly east of Cambie Street - so the entrance at Crossroads, being west of Cambie, would require a passage under the Canada Line tunnels to reach the new platform.
An Oak station in the block east of Oak (at Laurel) also aligns with a Cambie station shifted to the east as well.

So if the Crossroads entrance were to be used, it would just access the Canada Line station, without direct access to the new Broadway Subway station - and could be considered out-of-scope for the Broadway Subway (even if it increases overall station circulation).
all (or a lot ) will be revealed when the envelopes are opened next year.

until then its just speculation and educated guesses here
     
     
  #10047  
Old Posted Jul 4, 2019, 10:06 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,564
The entrance (let's face it, there will be only one) to the east of Cambie would be pretty disappointing.

The wait is painful though!

Do we even know for sure that it will be bored under Broadway (and not 10th?)
     
     
  #10048  
Old Posted Jul 4, 2019, 10:24 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by WarrenC12 View Post
The entrance (let's face it, there will be only one) to the east of Cambie would be pretty disappointing.

The wait is painful though!

Do we even know for sure that it will be bored under Broadway (and not 10th?)
the general consensus for the last few years has been that it will run under broadway (or on broadway whenever lrt is discussed), and the CoV has demanded NO cut n cover trenches ever again after Cambie subway construction - even if the city has to pay the increased cost of using TBMs

maybe harcourt's dream express UBC subway can be put under 10th

Last edited by jsbertram; Jul 5, 2019 at 2:31 AM.
     
     
  #10049  
Old Posted Jul 5, 2019, 6:39 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,778
Quote:
Originally Posted by WarrenC12 View Post
Do we even know for sure that it will be bored under Broadway (and not 10th?)
Well they sure as heck wouldn't be busy stringing trolley wires along 12th Avenue if they were planning to bore 10th rather than Broadway...
     
     
  #10050  
Old Posted Jul 5, 2019, 6:41 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
it will be Broadway. period.

i really want more than 1 entrance though... sigh... and 100m/expandable to 100m platforms... sigh...
     
     
  #10051  
Old Posted Jul 5, 2019, 1:05 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,564
Quote:
Originally Posted by aberdeen5698 View Post
Well they sure as heck wouldn't be busy stringing trolley wires along 12th Avenue if they were planning to bore 10th rather than Broadway...
Stations would still disrupt traffic along Broadway...
     
     
  #10052  
Old Posted Jul 5, 2019, 6:32 PM
ilikeredheads ilikeredheads is offline
Registered User
 
Join Date: Sep 2016
Location: west coast
Posts: 651
Quote:
Originally Posted by VancouverOfTheFuture View Post
it will be Broadway. period.

i really want more than 1 entrance though... sigh... and 100m/expandable to 100m platforms... sigh...
100m platforms became a fantasy the moment they began doing station upgrades starting with Main/Science World.
     
     
  #10053  
Old Posted Jul 19, 2019, 3:19 AM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by ilikeredheads View Post
100m platforms became a fantasy the moment they began doing station upgrades starting with Main/Science World.
There is nothing stopping them from having whatever length platform they want. If they make the trains longer however, then they won't align with existing ones, and will block switches for longer amounts of time. If they wanted to future-proof it a little, they would leave the space necessary to both make it 100m and full subway width so they never have to modify the tunnel for the next 100 years.

It would be expensive to retrofit the rest of the Expo/Millennium line to make platforms longer or cars wider, but at the same time, there's nothing really preventing the line from being modified in the same way it was built. Like if we wanted an express line and 24 hour availability, we should have a third guideway along the entire entire line, which a retrofit would be something that could be stacked on top of the existing line's ROW up to the Dunsmuir tunnel. The tunnel would have to have a parallel tunnel built since it's already stacked.
     
     
  #10054  
Old Posted Jul 20, 2019, 5:35 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,524
The partners include the MST Development Corporation (Musqueam, Squamish & Tseil-Waututh)
- which owns all or part of the Jericho Lands.

Public engagement regarding horizontal & vertical alignment in Fall 2019.


https://www.translink.ca/-/media/Documen...rs-Council-PUBLIC-MTG--July-25-FINAL.pdf
     
     
  #10055  
Old Posted Jul 20, 2019, 7:04 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,049
Bottom line, there's going to be a Jericho Station. Possibly one at Lelem or the Squamish Burrard parcel.
     
     
  #10056  
Old Posted Jul 22, 2019, 1:30 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
[QUOTE=officedweller;8637225]The partners include the MST Development Corporation (Musqueam, Squamish & Tseil-Waututh)
- which owns all or part of the Jericho Lands.

Public engagement regarding horizontal & vertical alignment in Fall 2019.

>SNIP<
/QUOTE]

I'm reading this as Translink or BC Gov't is trying to find others with deep pockets to 'chip in' their share to pay for segments / stations that will benefit the 'others'

Last edited by jsbertram; Jul 22, 2019 at 4:09 AM.
     
     
  #10057  
Old Posted Jul 22, 2019, 1:36 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by Migrant_Coconut View Post
Bottom line, there's going to be a Jericho Station. Possibly one at Lelem or the Squamish Burrard parcel.
i won't be surprised if the 'block f' at UBC is somehow tied into this phase II m-line extension
     
     
  #10058  
Old Posted Jul 22, 2019, 1:50 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by Kisai View Post
There is nothing stopping them from having whatever length platform they want. If they make the trains longer however, then they won't align with existing ones, and will block switches for longer amounts of time. If they wanted to future-proof it a little, they would leave the space necessary to both make it 100m and full subway width so they never have to modify the tunnel for the next 100 years.

It would be expensive to retrofit the rest of the Expo/Millennium line to make platforms longer or cars wider, but at the same time, there's nothing really preventing the line from being modified in the same way it was built. Like if we wanted an express line and 24 hour availability, we should have a third guideway along the entire entire line, which a retrofit would be something that could be stacked on top of the existing line's ROW up to the Dunsmuir tunnel. The tunnel would have to have a parallel tunnel built since it's already stacked.
for all the complaints about the c-line build, i doubt there's many complaints about spending a bit more per station to build them with 50M platforms (although they have temporary block walls built to make some platforms appear to be 40M). its easier & cheaper to remove the temporary walls in the future to get the full-length platforms, than to dig up the streets again to extend each of the stations.

it should be a no-brainer decision to build the ubc line stations with 100M platforms, but hide 20M behind temporary brick walls until a decision is made to have 100M platforms on the entire M-line (later this century)

spending a few extra $million now to save $billions later should be encouraged
     
     
  #10059  
Old Posted Jul 22, 2019, 2:03 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by Migrant_Coconut View Post
Bottom line, there's going to be a Jericho Station. Possibly one at Lelem or the Squamish Burrard parcel.
the Squamish Burrard land (beside the burrard bridge) is a bit of a trek to the broadway UBC skytrain.

but it's close to a future arbutus / burrard /downtown line
     
     
  #10060  
Old Posted Jul 22, 2019, 6:01 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,049
Quote:
Originally Posted by jsbertram View Post
i won't be surprised if the 'block f' at UBC is somehow tied into this phase II m-line extension
Right, Lelem is the new name for Block F.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:53 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.