Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #10021  
Old Posted Jul 2, 2019, 6:32 PM
whatnext whatnext is online now
Registered User
 
Join Date: Feb 2009
Location: Vancouver
Posts: 27,616
Quote:
Originally Posted by dpogue View Post
They still need to do surface excavation for where the stations will be located.
That's going to cause a hell of a mess at some major intersections, if they're digging out into the streets. At least with the Canada Line it was just Cambie affected.
     
     
  #10022  
Old Posted Jul 2, 2019, 9:56 PM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,739
Quote:
Originally Posted by casper View Post
More interesting is this fact:
Will the trolley wires be removed once construction is complete?
No. The trolley overhead infrastructure will remain in place so that TransLink can reroute trolley services in the event of an accident or other disruption to the normal routing, and for flexibility to adjust routes if customer needs or behaviours change as needed in the future.
https://engage.gov.bc.ca/broadwaysubway/faq/
There would be a cost to tearing down the wires so it is probably more than just keeping them in there (which would then allow them to be used for trolley shuffling/rerouting, possible future 12th service)
     
     
  #10023  
Old Posted Jul 2, 2019, 10:02 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,064
Quote:
Originally Posted by whatnext View Post
That's going to cause a hell of a mess at some major intersections, if they're digging out into the streets. At least with the Canada Line it was just Cambie affected.
IIRC the Canada seriously messed up King Ed/41st/49th too. Such is life.

Quote:
Originally Posted by s211 View Post
In the event of an accident, they'd change the route? Honest? And people would be alerted how? (And please no high-tech solutions, because not everyone of every age group has access to twitter, etc.)
Put up a sign on the bus stop that says "rerouted to 12th?" Works just fine whenever there's a marathon or parade.
     
     
  #10024  
Old Posted Jul 2, 2019, 10:09 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,011
A new cafe is opening in that new building at Oak and Broadway in the spot that was a possible skytrain entrance. So that eliminates that spot.
__________________
belowitall
     
     
  #10025  
Old Posted Jul 2, 2019, 10:56 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,541
Quote:
Originally Posted by whatnext View Post
That's going to cause a hell of a mess at some major intersections, if they're digging out into the streets. At least with the Canada Line it was just Cambie affected.
Hopefully they deck over the excavation pit so traffic can still pass over top.

Here's what's being done for the Crosstown in Toronto (which is bored tunnel but open excavation for stations.


https://urbantoronto.ca/news/2019/03/excavation-underway-eglinton-crosstown-station-yonge
     
     
  #10026  
Old Posted Jul 2, 2019, 11:16 PM
CanSpice's Avatar
CanSpice CanSpice is offline
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,708
Quote:
Originally Posted by SpongeG View Post
A new cafe is opening in that new building at Oak and Broadway in the spot that was a possible skytrain entrance. So that eliminates that spot.
Do you know how long the lease is that the cafe signed?
     
     
  #10027  
Old Posted Jul 3, 2019, 1:29 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by SpongeG View Post
A new cafe is opening in that new building at Oak and Broadway in the spot that was a possible skytrain entrance. So that eliminates that spot.
i thought when that new building (now IA finance i think) was first proposed, there were plans to have a station entrance on the corner, but until it was needed the space would be used as a CRU for a few years.

plans were later changed to making provision for only an emerg exit (assuming the station entrance was located somewhere else nearby) -speculation here was the old bank site across the street would be the station entrance

an emerg exit stairwell and the exit doors to the street will take up less space in the building, so i'm not surprised if most of the space formerly planned to be used for a station entrace is now a long-term CRU tenant

Last edited by jsbertram; Jul 4, 2019 at 1:18 AM.
     
     
  #10028  
Old Posted Jul 3, 2019, 1:35 AM
dandor31 dandor31 is offline
Registered User
 
Join Date: May 2015
Location: Vancouver
Posts: 74
Quote:
Originally Posted by Migrant_Coconut View Post
Rezone 12th/10th as a secondary retail street, and I think eventually the 14 could stay there for good.
I actually think the 14 is going to be diverted to 4th Ave. Same route as 4/7 along 4th before turning along Macdonald to get back along Broadway.

The 16 will be diverted along 12th to Arbutus.

Only 80% Relatively sure about these. But this way you limit the number of times these routes have to cross Broadway where there is active construction.

EDIT: Daily Hive link with maps https://dailyhive.com/vancouver/vancouver-broadway-subway-trolley-bus-reroutes

Last edited by dandor31; Jul 3, 2019 at 1:48 AM.
     
     
  #10029  
Old Posted Jul 3, 2019, 1:51 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by officedweller View Post
Hopefully they deck over the excavation pit so traffic can still pass over top.

Here's what's being done for the Crosstown in Toronto (which is bored tunnel but open excavation for stations.

>snip<
https://urbantoronto.ca/news/2019/03/excavation-underway-eglinton-crosstown-station-yonge
i think i read somewhere they (CoV?) wanted to use decking to keep the streets and sidewalks free-flowing (as best as possible) during rush-hours and the in-between daytime during station construction.

traffic lanes overnight could be reduced to 1 lane each direction when access to the pit under the decking is need.

just imagine if that pic was a preview of a two-lane broadway snaking for 50 blocks around cut n cover tunnels and stations during construction. and a two-lane cambie thrown in for an extra level of hell.

ugh

Last edited by jsbertram; Jul 3, 2019 at 2:26 AM.
     
     
  #10030  
Old Posted Jul 3, 2019, 2:18 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by xd_1771 View Post
There would be a cost to tearing down the wires so it is probably more than just keeping them in there (which would then allow them to be used for trolley shuffling/rerouting, possible future 12th service)
i used to work near hastings & carrall in the 'tinsletown' building and noticed the s.b. trolly wires on carrall one day, but never saw a trolly actually use them. i guess its cheaper to leave em rather than take em down
     
     
  #10031  
Old Posted Jul 3, 2019, 2:28 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,616
Quote:
Originally Posted by jsbertram View Post
i used to work near hastings & carrall in the 'tinsletown' building and noticed the s.b. trolly wires on carrall one day, but never saw a trolly actually use them. i guess its cheaper to leave em rather than take em down
Anyone know which buses went on Carrall?

This report on the Carrall Street greenway mentions the trolley lines being relocated when they redid it in the early 2000s.

http://conf.tac-atc.ca/english/resourcecentre/readingroom/conference/conf2009/pdf/Chow.pdf
     
     
  #10032  
Old Posted Jul 3, 2019, 3:58 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by jollyburger View Post
Anyone know which buses went on Carrall?

This report on the Carrall Street greenway mentions the trolley lines being relocated when they redid it in the early 2000s.

http://conf.tac-atc.ca/english/resourcecentre/readingroom/conference/conf2009/pdf/Chow.pdf
if i read this right, new trolley wires were strung during this greenway project, but since then (for decades) they've never been used?
     
     
  #10033  
Old Posted Jul 3, 2019, 4:36 AM
jollyburger jollyburger is offline
Registered User
 
Join Date: Dec 2015
Posts: 15,616
Quote:
Originally Posted by jsbertram View Post
if i read this right, new trolley wires were strung during this greenway project, but since then (for decades) they've never been used?
Some buses used them when Main/Hastings was blocked off in June 2008

https://www.youtube.com/watch?v=Y8hDhObEuz8
     
     
  #10034  
Old Posted Jul 3, 2019, 7:00 AM
whatnext whatnext is online now
Registered User
 
Join Date: Feb 2009
Location: Vancouver
Posts: 27,616
Quote:
Originally Posted by jsbertram View Post
i used to work near hastings & carrall in the 'tinsletown' building and noticed the s.b. trolly wires on carrall one day, but never saw a trolly actually use them. i guess its cheaper to leave em rather than take em down
Likely the same reason wires are still on the Hemlock ramp to the Granville St. Bridge.
     
     
  #10035  
Old Posted Jul 3, 2019, 1:44 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,577
Quote:
Originally Posted by jsbertram View Post
i think i read somewhere they (CoV?) wanted to use decking to keep the streets and sidewalks free-flowing (as best as possible) during rush-hours and the in-between daytime during station construction.

traffic lanes overnight could be reduced to 1 lane each direction when access to the pit under the decking is need.

just imagine if that pic was a preview of a two-lane broadway snaking for 50 blocks around cut n cover tunnels and stations during construction. and a two-lane cambie thrown in for an extra level of hell.

ugh
If they ban all street parking on Broadway, 12th and even 16th for the duration of construction, I think we'll survive.
     
     
  #10036  
Old Posted Jul 3, 2019, 10:22 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,541
Quote:
Originally Posted by jsbertram View Post
i think i read somewhere they (CoV?) wanted to use decking to keep the streets and sidewalks free-flowing (as best as possible) during rush-hours and the in-between daytime during station construction.
I seem to recall that too.

I think they'd still need to have an open excavation for the initial excavation, then when it gets deep enough for workable headroom, they can deck over the pit.

I remember in the 1980s when Granville Station was built, there was heavy timber decking on Seymour over the ticket hall excavation, but otherwise the traffic flowed over top.
     
     
  #10037  
Old Posted Jul 3, 2019, 10:58 PM
dothediu dothediu is offline
Registered User
 
Join Date: Sep 2015
Posts: 70
Quote:
Originally Posted by SpongeG View Post
A new cafe is opening in that new building at Oak and Broadway in the spot that was a possible skytrain entrance. So that eliminates that spot.
The Oak station entrance is going to be closer to Laurel St. Hence the name change. I think Translink bought a property there.

Also, Broadway-City Hall doesn't seem like it will have additional above ground station entrances. There will likely just be the underground connection to the existing Canada line station.
     
     
  #10038  
Old Posted Jul 4, 2019, 12:56 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by whatnext View Post
That's going to cause a hell of a mess at some major intersections, if they're digging out into the streets. At least with the Canada Line it was just Cambie affected.
not quite.


every street or avenue crossing cambie was either blocked for thru-traffic (its hard to jump an open trench), or had the bailey-bridges installed on the major intersections, which f*d most of the left-hand turns. use of the bridges also meant fewer traffic lanes all day & night, so there was horrible e- and w-bound traffic jams all day.

my office-mates who needed to cross cambie by car or bus learned to add 15-20 minutes to their commute or general running around

Last edited by jsbertram; Jul 4, 2019 at 4:12 AM.
     
     
  #10039  
Old Posted Jul 4, 2019, 1:04 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by dothediu View Post
The Oak station entrance is going to be closer to Laurel St. Hence the name change. I think Translink bought a property there.

Also, Broadway-City Hall doesn't seem like it will have additional above ground station entrances. There will likely just be the underground connection to the existing Canada line station.
what about the former lululemon space that was intended for a future broadway line entrance?


https://dailyhive.com/vancouver/skytrain-broadway-extension-millennium-line-stations-vancouver
     
     
  #10040  
Old Posted Jul 4, 2019, 1:06 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
i want to know when Crossroads will have its station entrance connected to the new line. it is a natural idea since, you know, it was built for that...
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:17 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.