HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jul 16, 2019, 6:03 PM
daud's Avatar
daud daud is offline
 
Join Date: Jun 2012
Posts: 764
Quote:
Originally Posted by roger1818 View Post
I thought the Osgoode Pathway ended at Leitrim. Stage 2 south only crosses to the south side Leitrim and then heads west. I would expect only a minor detour of the pathway would be needed to avoid the construction.
The Osgoode pathway always ended at Leitrim (northbound)-correct. Stage 2 uses a fair bit of the Osgoode Pathway from Leitrim sotuhbound to just south of Earl Armstrong. That whole section is currently closed probably at least until construction is done if not permanently.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 7:05 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.