Winnipeg Construction X
Courtesy of Dan Harper Photography
Previous construction threads:
Winnipeg Construction 9
Winnipeg Construction 8
Winnipeg Construction 7
Winnipeg Construction 6
Winnipeg Construction 5
Winnipeg Construction 4
Winnipeg Construction 3
Winnipeg Construction 2
Winnipeg Construction 1
Winnipeg Developments
Portage Place Redevelopment
Location: 393 Portage Ave
Developer: True North Real Estate Development (TNRED)
Architects: Architecture49
Status: U/C
Documents: Portage Place Redevelopment Plan | Community Engagement Summary Report | Phase 2 - Community Engagement Summary Report | Overall Campus plan for Health, Wellness & Neighbourhood Services
Project Thread: Portage Place Redevelopment
Media: ‘This is it’: True North reaches deal to buy Portage Place for $650-M redevelopment project
Description: TNRED’s $650-M plan for Portage Place is intended to improve the urban health of downtown Winnipeg, and is based on the notion of breaking down the large monolithic structure into four simple zones providing for health equity (Downtown Winnipeg Health Centre for Excellence, Pan Am Centre for Advanced Musculoskeletal Medicine); public spaces and greenways; neighbourhood services, culture and arts; and housing and food equity.
A 15-storey residential tower will be developed as part of a historic not-for-profit partnership with
Southern Chiefs’ Organization (SCO), named TN-SCO 92 Housing Inc. This project is a recipient of the
Housing Accelerator Fund Capital Grant Incentive
• Video Link
• Video Link
Hudson Bay Building | Wehwehneh Bahgahkinahgohn
Location: 450 Portage Ave
Architects: Number TEN Architectural Group
Developer: The Southern Chiefs Organization
Status: Under Construction
Project Thread: Hudson Bay Building Redevelopment
Media: Redevelopment cost for former Bay building doubles to $310M
Renderings
Description: The Southern Chiefs Organization (SCO) is transforming the six-storey, 655,000-square-foot historic Hudson’s Bay Company Building in downtown Winnipeg. The revitalization of the historic retail space into a multi-use building will revive downtown Winnipeg and exemplifies both economic and social reconciliation.
The $310 million project features over 373 affordable residential units, each unit will have a view out of the historic façade or into the newly imagined atrium (which is the size of an NHL ice rink), hosting unique designs inspired by all 34 SCO First Nation communities. The building will also provide office and retail space for First Nations entrepreneurs. Recipient of the
Housing Accelerator Fund Capital Grant Incentive
• Video Link
The Sutton Place Hotel
Location: 220 Carlton St
Developer: Northland Properties Corporation
Architects: Pacific Coast Architecture Inc
Status: Under Construction
Documents: VARIANCE: 24-140482/B
Project Thread: Winnipeg | True North Square
Renderings
Description: 27 storey ultra modern skyscraper will house a new location of the Sutton Place Hotel. A 132kW south-facing solar panel system will offset approximately one third of the hotel's power.
Red River Métis Nation Heritage Centre
Location: 335 Main Street
Developer:The Manitoba Métis Federation - the National Government of the Red River Métis
Architects: Number TEN Architectural Group
Status: Under Construction
Renderings
Media: MMF unveils sample of beadwork installation for heritage centre
Renderings
Description: the National Government of the Red River Métis - is developing a Heritage Centre in the heart of our Homeland on Winnipeg's iconic corner of Portage and Main. Symbolically facing toward the Northwest, the Heritage Cenre is at the most significat intersection of our Red River Cart Trails from across the Prairies. This one-of-a-kind Heritage Centre will tell our Red River Métis stories and showcase our history with engaging exhibits and programs that mix historical artifacts and contemporary art in unique ways. The Heritge Centre will dignify the history and interpret the significance of the Red River Métis in the development and future of Canada and be a welcoming place that is accessible and inclusive as a place for gathering and celebrating our Red River Métis collective identity and culture.
127 Bannatyne Ave
Location: 127 Bannatyne Ave
Developer: Alston Properties Ltd.
Architects: AtLRG
Status: Under Construction
Documents: Appeal – Variance DAV 106976A/2022B
Media: New highrise labour of love; Alston Properties, Concord Projects making ‘emotional investment’ with 10-storey building in east Exchange
Description: A 10 storey infill in the historic Exchange District replaces a surface parking lot with underground parking, main floor commercial space, 2nd floor office space, and 80 residential apartments above with a roof terrace amenity contributes the evolution of the downtown sector as a diverse, mixed-use neighbourhood. The podium portion interfaces with the heritage qualities of the streetscape through scale and materiality; the tower portion is set back and subservient.
Solara Flats
Location: 308 Colony St
Developer(s): Lotus Equity Partners Inc &
UWCRC 2.0
Architects: Cibinel Architecture
Status: U/C
Documents: Zoning Agreement Amendment December 7, 2020
Project Thread: Winnipeg | 308 Colony St | 21F
Media: University charity spearheads innovative approach to affordable housing in Winnipeg
Description: $77 million project, 156,000 square foot, 214 unit, 21-storey mixed-use tower, Canada’s tallest residential Zero Carbon Building with Integrated Photovoltaic Panels that provide return on investment as a energy generating asset while utilizing daylight and reducing cooling loads
Atelier
Location: 2071 Corydon Ave
Developer: IG Mackenzie Real Property Fund
Architects: Raymond S.C. Wan Architect
Status: U/C
Renderings
Media: A lease on luxury; Deluxe apartment tower taking shape in Tuxedo
Description: 13 storey, 84 unit rental apartment tower, three (3) commercial units on main floor. A Shell gas station that occupies the site will be demolished for this development.
Station Place 01 | Station Place 02
Location: Station Place
Developer: Carrington Real Estate
Architects: MMP Architects Inc.
Status: Under Construction
Documents: Plan Approval – 25 Station Place Approved Plans |
Rezoning - 28 Station Place
Project Thread: 25 & 28 Station Place
Media: Raising the bar in Winnipeg; Carrington Real Estate breaks ground on premiere rental property
STNP 01 is a transit-oriented development in the Fort-Rouge neighbourhood featuring a luxury 16 storey highrise tower with a total of 156 units. The estimated completion date is Spring 2026
STNP 02 features a luxury 22 storey highrise tower with a total of 202 units, 3 commercial units and structured parking. The estimated completion date is Fall 2027.
DSM
Location: 185 Donald Street
Developer: Carrington Real Estate
Architects: MMP Architects Inc
Status: U/C
Project Thread: 185 Donald St | 14F | Mixed-use
Renderings
Media: Carrington Real Estate revives Donald-St. Mary residential tower project, taps Keg for main floor
Description: DSM is a 14-storey luxury high-rise featuring 160 modern units in the heart of downtown. Ground level will be the new home of The Keg downtown and the second floor will be the head office for Carrington Real Estate
East Block Lofts
Location: 138 Portage Ave E
Developer: Space2Developers
Architects:
Status: U/C
Project Thread: 138 Portage Ave | East Block Lofts
Media: Future building on history; East Block Lofts: residential redevelopment set for 114-year-old structure on Portage Avenue East
Description: Plans for the historic heritage property east of Portage and Main proposes to redevelop the 105-year-old seven-storey Keewayden block, transforming it into a 117-unit apartment building with new addition to the west side. Recipient of the
Housing Accelerator Fund Capital Grant Incentive
Market Lands (2 phases)
Location: 151 - 171 Princess Street
Developer: CentreVenture Development Corporation &
UWCRC 2.0
Architect: Daoust Lestage
Status: U/C
Project Thread: Market Lands Redevelopment
Renderings
Description:
Phase 1 - South Parcel
10-storey net zero mixed-use building, will create 102 new apartment units as well as a Creative Hub, a 20,000 square foot area dedicated to arts and culture organizations.
The building is one of the first net zero carbon projects in Canada, it will produce as much energy as it consumes. The design includes a state-of-the art building envelope, with the front of the building being clad entirely in solar panels.
Phase 2 - North parcel
Developer: UWCRC 2.0
Architect: Number TEN Architectural Group
1. Market Lands North Tower: 148 unit - 16 storey Corten Steel tower
2. Market Lands North Mixed-Use: 127 units - 6 storey residential block
The project is a two-building development wrapped around a raised central courtyard and a ground level public plaza. Both buildings are seeking Net Zero certification under the Canada Green Building Council Zero Carbon Building Design Standard. Building One, at the northwest corner of the site, is a 16-storey building with 148 units of mixed-income and affordable housing. The ground floor includes retail space and a public plaza.
Building Two, which wraps the other three corners of the site, is a 6-storey building with 127 residential units and will be home to commercial space for non-profit tenants. There will also be a childcare centre along King Street, with an outdoor play space in the courtyard. Building Two will also provide 91 indoor parking spaces. Recipient of the
Housing Accelerator Fund Capital Grant Incentive
31 Riel Ave
Address: 31 Riel Ave street Winnipeg, MB
Developer: Trademark Builders Inc
Architect: AtLRG
Status: U/C
Renderings
Description: A four-storey, 82 suite residential building with ground floor commercial suites complete with underground parking. The gable roof extends the amount of liveable space with the inclusion of brightly-lit mezzanine space for the forth floor suites, while also providing a distinctive identity to the local multi-family housing typology.
Mayfair Tower
Location: 109 Mayfair
Developer: WRE Developments
Architects: Otto Cheng Architect Incorporated
Status: U/C
Project Thread: 109 Mayfair
Description: WRE Developments is considering the construction of a 15-storey, 96 unit residential apartment building located at 109 Mayfair across from downtown along the Assiniboine River.
200 Portage Ave.
Location: 200 Portage Ave
Developer: 200 Portage INC. (Carmyn Aleshka)
Status: U/C
Renderings & Construction pics
Description:Landlord has comprehensive plan to completely renovate 200 Portage, including the main floor and concourse space, redevelopment plans include upgraded floor to ceiling windows giving unprecedented 360° views of Portage and Main and flooding office spaces with natural light. Other upgrades include new curtain wall, doors, lobbies and elevators which will be replaced or upgraded.
210 Masson
Address: 210 rue Masson
Architects: BLDG architecture office inc.
Developer: Towers Realty Group
Status: Proposed
Documents: File DAZ 215/2018 | Submitted Plans
Media: Housing plans approved for historic building
Description: The applicant intends to redevelop an existing vacant heritage building into multi family rental housing. The building will be restored in accordance with the policies for heritage-status buildings. The redevelopment will consist of seven (7) studio units, twenty-three (23) one bedroom units, and one (1) two-bedroom unit.
Railside Residential Village at The Forks
PDF Storyboard
Developer: The Forks North Portage Partnership
Status: Site prep (geothermal, fire hydrants)
Project Thread: Forks Redevelopment
Description: Railside at The Forks is a new kind of development and a major step in the evolution of The Forks. Railside represents the first ever opportunity for residential development at The Forks, on two parking lots known as
Railside and
Parcel 4. Remaining true to The Forks' founding vision, this significant mixed-use project will build on the site's abundant cultural background.
Railside | Kink | Site 16
Location: Israel Asper Way
Developer: GSD
Architects: ATLRG Architecture
Status: Proposed
Documents:
Project Thread: Forks Redevelopment
Renderings
Description: Ground floor commercial with 29 deeply affordable apartment units within the 6 storey mass timber building. The kinked form is located at the nearest point to the market proper, with a carved-out plaza serving as a gateway to the residential component of the historic site.
Railside | Pilot & Porter Condominiums | Site 15
Location: 32 Israel Asper Way
Developer: StreetSide
Architects: Prairie Architects
Status: Proposed
Documents: VARIANCE: 25-121080/B
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg approved an application to build mixed-use building with two ground floor storefronts and 45 apartments on the floors above.
Railside - Site 13
Location: 44 Israel Asper Way
Developer: Alston Properties
Architects: 1X1 Architecture
Status: Proposed
Documents: VARIANCE: 24-191468/B
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg approved an application for a mixed-use housing development (1 CRU & 35 Units)
Railside - Site 11
Location: 64 Israel Asper Way
Developer: Alston Properties
Architects: 1X1 Architecture
Status: Proposed
Documents: VARIANCE: 24-191465/B
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg approved an application for a mixed-use housing development (1 CRU & 23 Units)
Railside - Site 12
Location: 50 Israel Asper Way
Developer:
Architects: 2 Architecture
Status: Proposed
Documents: VARIANCE: 24-271940/B
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg approved an application to build a six storey mixed-use building with seven (7) ground floor commercial units and 40 residential units on the floor above.
Railside | Building 5X | Site 10
Location: 68 Israel Asper Way
Developer:
Architects: 2 Architecture
Status: Proposed
Documents: VARIANCE: 24-271871/B
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg approved a Conditional Use under Downtown Zoning By-Law No. 100/2004 to permit a Restaurant use located at ground level and not directly accessible from a public sidewalk, 4 storey mixed-use building 1 ground floor commercial unit and 06 residential units on the floors above.
Railside | Building 5Y | Site 08
Location: 80 Israel Asper Way
Developer:
Architects: 2 Architecture
Status: Proposed
Documents: VARIANCE: 24-271356/B
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg approved an application for a four storey residential building with 16 units
Railside | Site 09
Location: 72 Israel Asper Way
Developer: FNP
Architects: Number TEN Architectural Group
Status: Proposed
Documents: VARIANCE: 24-279590/B
Project Thread: Forks Redevelopment
Renderings
Description: The City of Winnipeg approved an application for a six storey mixed-use building with four ground floor commercial units and 91 residential units on the floors above. Recipient of the
Housing Accelerator Fund Capital Grant Incentive
BOXCAR ALLEY at Union Station
Location: Union Station/The Forks, Winnipeg, MB
Developer: The Forks North Portage Partnership
Architects: PUBLIC CITY
Status: Proposed
Renderings
Description: As a part of the
Railside Residential Village at The Forks development, The Box Car Alley design playfully highlights the space under the CN rail line at the Forks, a space that is currently under-utilized and overlooked. The project seeks to brighten the peripheries of The Forks, revitalizing an important public space through public engagement, local business promotion and creative opportunities for artists and visitors.
22 Granite Way
Location: 22 Granite Way
Developer: University of Winnipeg Community Renewal Corporation (UWCRC)
Architect: Number TEN Architectural Group
Status: In development
Documents: Subdivision and Rezoning February 6, 2025
Project Thread: 22 Granite Way | 12F
Description: 111-unit multi-family Affordable development to be constructed on the City of Winnipeg owned surface parking lot of the Granite Curling Club in West Broadway.
265 Osborne St (Phase 2)
Location: 265 Osborne St
Developer: Jeff Silverstein
Architect: DIN Projects
Project Thread: Osborne Place
Status: On Hold
Media: Fully automated parkade raises profile of Osborne Street development
Description:
The proposed development is a mixed use building with 75 dwelling units. It contains:
o commercial uses on the ground floor (restaurant)
o a 134-stall parking garage and residential uses on floors 2-5
o an office and gym on floors 6 and 7 and roof deck on floor 7
o residential dwelling units on floors 8-15
This project represents the first ever proposed rezoning into Winnipeg’s “TOD” – Transit
Oriented Development zoning district.
Documents: Subdivision and Rezoning Extension of Time – Subdivision and Rezoning
Winnipeg Hotel (Heritage restoration)
Location: 214 Main St
Developer: John Pollard
Architect: Unit 7 Architecture
Contractor: Jilmark Construction Ltd.
Status: In development
Media: Closing time for Winnipeg Hotel |
New life being breathed into Winnipeg Hotel, oldest building in city's downtown
Renderings
Description: The hotel at 214 Main St. opened in 1881, it was purchased three years ago by a holding company fronted by John Pollard, co-chief executive officer of Pollard Banknote Ltd, plans are to refurbish the building and redevelop it into a boutique hotel. Pollard anticipates it could take as long as three years to complete the renovations on the Winnipeg Hotel.
366 Marion St.
Location: 366 Marion St.
Developers: Paskwayak Development Corporation | Freedhome Developments Ltd.
Architects: Number TEN Architectural Group
Status: In Development
Documents: Variance – DAV 108685/2024D
Media: Six-storey housing complex in works for Marion Street
Renderings
Description: Project Marion will be a 127-unit apartment building, including 52 affordable units, with priority given to members of Opakswayak Cree Nation and other First Nations community members. This development is a recipient of the
Affordable Housing Now program.
350 River Ave.
Location: 350 River Ave. Winnipeg, MB
Developer: Andre Silva
Architect(s): 2 Architecture
Status: U/C
Media: Changing plans over opposition; Osborne Village single-room-occupancy project revamped
Description: Plans are to redevelop lot it into a four-storey, single-room-occupancy building with 30 very small, private rooms. Shared spaces include kitchens, living and dining room, and roof terrace for social space.
McLaren Hotel, mixed use residential development
Location: 554 Main Street, Winnipeg, MB
Developer: Rubi Gill |
The Equal Housing Initiative
Architects: Verne Reimer (Tower) |
Brook McIlroy (Heritage building)
Status: U/C
Media: McLaren owner wants to build new 'dignified living' space next to Main Street hotel | $12M retrofit will transform aging McLaren Hotel into 150 'tiny homes' of supportive housing | Winnipeg hotel used to house 150 residents is getting a facelift | McLaren up for overhaul
Renderings
Description: As part of the renovations to the historic McLaren Hotel a new 12-storey mixed use residential building is proposed. Plans are to have one-third of the 108 suites designated as affordable housing. Equal Housing Initiative will begin a $12-million retrofit of the McLaren Hotel, The retrofit will be separated into three stages — two floors at a time.
Steinbach Credit Union (Renovation)
Location: 2100 McGillivray Blvd, Winnipeg, MB
Developer: Steinbach Credit Union
Architects: Raymond S.C. Wan
Status: In Development
Media: Community committee approves credit union renovation
Documents: Plan Approval |
Submitted Plans
Description: Plans were approved for an addition and renovation to the pre-existing Steinbach Credit Union bank and office space. The addition will include new office space for staff, as well as a larger bank hall area for the general public. The new section of the building will be added to the south side, facing McGillivray Boulevard.
PROV 01
Location: 165 Provencher Blvd
Developer(s): Carrington Real Estate
Architects: MMP Architects Inc
Status: In Development
Documents: Plan Approval |
Approved Plans
Media: Plans approved for multi-family developments
Project Thread: 165 Provencher Blvd | PROV 01
Description: Proposed is a residential and commercial mixed use building with 94 residential dwelling units, Six commercial units are proposed within the building, Five units are proposed at grade and one office is proposed on the second floor
915 McMillan Ave
Location: 915 McMillan Ave.
Developer: Dwell Design Builders
Architects: BLDG architecture office inc
Status: In Development
Documents: Zoning Agreement Amendment
Media: Back to the drawing board for McMillan Avenue project
Renderings
Description: The proposed development is a 4-storey building with 30 residential units on upper floors and 2 commercial units on the ground floor
128 River Avenue
Location: 128 River Avenue
Developer:
Architects: ft3 Architecture Landscape Interior Design
Status: In Development
Documents: Variance DAV 263772/2024D
Media: -
Renderings
Description: 6 storey residential building with 19 units
The Grosvenor Manor
Location: 880 Grosvenor Ave, Winnipeg, MB
Developer: Ventura Developments
Architects: Prairie Architects
Status: In Development
Documents: Subdivision and Rezoning December 7, 2020 |
Extension of Time June 25, 2024 – Subdivision and Rezoning
Media:
Renderings
Description: Development plans are for a 4 storey 26 unit multi-family residential building at the corner of Grosvenor Ave & Wentworth St.
738 Rue St. Joseph
Location: 738 Rue St. Joseph, St. Boniface, Winnipeg, MB
Developer: Edison Properties
Architects: MMP Architects
Status: In Development
Renderings
Media: Consultation process for old Parmalat site ramps up |
Ancien site de l'usine Parmalat : un projet et plusieurs inquiétudes
Description: Edison Properties is considering an application to rezone the vacant parcel so that it can eventually accommodate multi-family development.
670 McMillan Avenue
Location: 670 McMillan Avenue
Developer: Paragon Living
Architects: Affinity Architecture Inc
Status: In Development
Documents: McMillan Avenue Redevelopment May 5th, 2021
Renderings
Media:
Description: A four storey, (tapering down to three storeys along the eastern façade) 40 residential unit rental building with underground parking and parking off of the rear lane.
51RR
Location: 51 Roslyn Rd, Winnipeg, MB
Developer:
Architects: h5 Architecture
Status: In Development
Documents: VARIANCE: 22-143518/D May 30, 2022
Media: Vacant block that poses fire hazard approved for quick demolition
Project Thread: 51 Roslyn Rd
Description: 6 Storey 66 unit residential building located in Osborne Village.
Main Street Project Inc.
Location: 637 Main St.
Developer: Main Street Project
Architects: -
Status: In Development
Documents: -
Media: Federal cash boosts key inner-city housing projects
Description: With 111 units, all of which are rent geared to income, this project aims to address homelessness in the community by transforming Main Street Project's existing emergency shelter into a multi-purpose facility with affordable housing, communal spaces, and on-site support services. Main Street Project received $2.5 million from the
Housing Accelerator Fund Capital Grant Incentive and tax increment financing. It hopes to use the money to finance a three-storey addition to its emergency shelter, The project is expected to cost approximately $30 million. The Winnipeg Foundation has committed financial support, and additional funding is expected from the provincial and federal governments.
440 Edmonton St.
Location: 440 Edmonton St.
Developers: UWCRC 2.0 Inc. & 10162513 Manitoba Ltd.
Architects: -
Status: In Development
Documents: -
Media: Former Parkview Place redevelopment among 11 Winnipeg projects receiving housing funding
Description: This project will convert a vacant 13-story commercial building into a residential complex with 180 new transitional, social, and affordable housing units. This development is a recipient of the
Housing Accelerator Fund Capital Grant Incentive.
1022 Pembina Hwy
Location: 1022 Pembina Hwy, Winnipeg, MB
Developer: Pre-Con Builders | Towers Realty Group
Architects: BLDG architecture
Status: In Development
Documents: Variance March 25, 2022 |
Extension of Time March 27, 2025
Media: ‘Just the way the future goes’; Longtime Pembina Highway fixture Cambridge Hotel to shutter Nov. 5 to make room for mixed-use complex
Renderings
Description: 87 unit 6 level apartment complex, replacing the Cambridge Hotel and Beer Vendor
Paulin Street Villag.
Location: 346 Pacific Ave.
Developers: MRH Properties
Architects: BLDG architecture office inc.
Status: In Development
Renderings
Documents: VARIANCE: 24-201369/B
Media: -
Description: This new, privately-owned development will convert a downtown surface parking lot into 125 units of housing, including 38 affordable units with a ground floor commercial unit . This development is a recipient of the
Housing Accelerator Fund Capital Grant Incentive.
269 River Ave.
Location: 269 River Ave.
Developers: Brokenhead Ojibway Nation Development Corp.
Architects: -
Status: In Development
Documents: -
Media: -
Description: The proponent is building a 144-unit apartment with 58 units rented at affordable rates, with priority given to members of Brokenhead Ojibway First Nation and other First Nations community members. This development is a recipient of the
Housing Accelerator Fund Capital Grant Incentive.
Queer Village Housing Development
Location: 927 Notre Dame Ave
Developers: 2Spirit Manitoba | Sunshine House
Architects: Brook McIlroy
Status: In Development
Documents: Subdivision and Rezoning | Variance September 5, 2024
Media: ‘Queer Village’ proposed for West Alexander | Plan to turn parking lot into ‘queer village’ advances
Description: This first-of-its-kind in Manitoba development, led in partnership by 2Spirit Manitoba and Sunshine House, a new 4-storey commercial mixed-use multi-family building on existing surface parking lot will consist of 11 shelter beds, 14 transitional housing units, and seven social housing units with onsite wrap-around supports. The development will include a communal kitchen, gathering spaces, ceremony room, office/counselling spaces, medical room, and an outdoor medicine garden. Onsite supports will be provided by 2Spirit Manitoba and Sunshine House, with capacity building support from Siloam Mission and UWCRC 2.0. This development is a recipient of the
Affordable Housing Now program.
125 Garry St.
Location: 125 Garry St.
Developers: Westgate Developments Ltd & LVDC Holdings Ltd
Architects: -
Status: In Development
Documents: -
Media: -
Description: This privately-owned development will convert a largely vacant commercial building into a mixed-use apartment with a commercial ground floor and 126 units of housing, including 32 affordable units. This development is a recipient of the
Housing Accelerator Fund Capital Grant Incentive.
530 St. Mary Ave. & 252 Good St.
Location: 252 Good St.
Developers: Longboat
Architects: Cibinel Architecture
Status: In Development
Documents: Variance - DAV 133214/2024D
Media:
Description: The new 7-storey 165-unit, privately owned development will provide 50 units of affordable housing, 1,780 square feet of commercial space which will front St. Mary Avenue. The residential component will contain ground level townhouse units along Good Street to reinforce a pedestrian scale. This development is a recipient of the
Housing Accelerator Fund Capital Grant Incentive.
228 King St.
Location: 228 King St
Developers: Winnipeg Chinatown Development Corporation
Architects: -
Status: In Development
Documents: -
Media: -
Renderings
Description: This new, 54-unit apartment in the heart of Chinatown will include a daycare space, 14 affordable units, and 15 units that are rent geared to income. This development is a recipient of the
Housing Accelerator Fund Capital Grant Incentive.
120 & 128 James Ave.
Location: 120 & 128 James Ave
Developers: Veritas Development Group Ltd.
Architects: Northern Sky Architecture Inc
Status: In Development
Documents: Variance - DAV 265852A/2024B
Media: -
Project Thread: 120/128 James Avenue | 10F
Description: The proposed development involves a four storey addition on top of the existing building located at 128 James Avenue to add 16 dwelling units. The development also includes the construction of a new ten storey residential building at 120 James Avenue with 71 dwelling units. This development is a recipient of the
Housing Accelerator Fund Capital Grant Incentive
The Bond Redux
Location: 151 William Stephenson Way
Developers: -
Architects: 5468796 Architecture Inc
Status: In Development
Documents: -
Media: Its name is Bond … Bond Redux
Description: Seven-storey heavy timber mixed-use development east of Portage and Main in downtown Winnipeg. Hybrid office space on its first two floors will house 5468796’s office and support spaces for two affordable housing agencies.
Global Agriculture Technology Exchange (Gate)
Location: Westbrook St
Developers: Cereals Canada
Architects:
Status: In Development
Documents: -
Media: Cereals Canada looking ahead to GATE facility
Project Thread
Description: Cereals Canada is planning a $102-million new, modernized research facility in Winnipeg’s Exchange District neighbourhood. Cereals Canada currently operates in a 30,000-square-foot space. The new proposed facility will be slightly larger and state-of-the-art, specialized laboratories for baking, milling, noodle and pasta making are in the plans.
199 and 201 Marion Street
Location: 199 and 201 Marion Street
Developers: Urban Ridge Homes
Architects: 2 Architecture Inc
Status: In Development
Documents: Plan Approval | Approved Plans | Submission
Media:
Renderings
Description: Proposed is a 6-storey (68 feet) mixed use building. The building will encompass 26 residential units and a commercial unit on the ground floor.
1131 Nairn
Location: 1131 Nairn
Developers: Progressive Real Estate Group
Architects: Affinity Architecture Inc
Status: In Development
Documents: Variance – DAV 254531/2023D
Media: Mixed-use rezoning on Nairn approved
Renderings
Description: Proposed is a six story mixed use building. The building will encompass 99 residential units and commercial units on the ground floor.
90 Wellington Cres. & 586/588 River Ave.
Location: 90 Wellington Cres
Developers: Progressive Real Estate Group
Architects: Affinity Architecture Inc
Status: U/C
Documents: Subdivision and Rezoning | Variance
Media: Affordable, supportive housing proposed for Osborne Village
Renderings
Description: The development is planned to include a 4 storey, 51 unit residential development, composed of two buildings. A third floor walkway will span the rear public lane, connecting the two new buildings. 20 units in the development are proposed to provide supported housing. The development will contain an onsite kitchen to serve the needs of those living in the supported housing.
914 and 980 St James Street
Location: 914 and 980 St James St
Developers: Towers Realty Group
Architects: BLDG architecture
Status: In development
Documents: Subdivision and Rezoning
Media: Polo Park development proposes 101 residential suites; Province changed airport vicinity protection area rules
Description: The development is planned to include an 8-storey 101 unit mixed-use building with 5 CRU at grade.
The Banks Condominiums
Location: 1924 St. Mary’s Road
Developers: StreetSide Developments
Architects:
Status: U/C
Documents: Brochure | Subdivision and Rezoning | Variance
Media: -
Renderings
Description: StreetSide Developments is constructing a 6-storey multi-family residential building containing 69 units.
1918 SMR
Location: 1918 St. Mary's Road
Developers: Carrington Real Estate
Architects: Verne Reimer Architecture
Status: U/C
Documents: Plan Approval | Submitted Plans
Media: Multi-family development on St. Mary’s gets OK
Renderings
Description: Proposed are two multi-family residential buildings, one eight-storey building containing 168 units (1918 SMR) and one six-storey building containing 102 units (1920 SMR).
1920 SMR
Location: 1920 St. Mary's Road
Developers: Carrington Real Estate
Architects: Verne Reimer Architecture
Status: U/C
Documents: Plan Approval | Submitted Plans
Media: Multi-family development on St. Mary’s gets OK
Renderings
Description: Proposed are two multi-family residential buildings, one eight-storey building containing 168 units (1918 SMR) and one six-storey building containing 102 units (1920 SMR).
158 and 160 Dumoulin Str
Location: 158 and 160 Dumoulin Str
Developers:
Architects: Verne Reimer Architecture
Status: In development
Documents: Design Review |
Submitted Plans
Media:
Description: 6-storey multi-family residential building encompassing 20 self-contained units and 8 single room occupancy units. The 8 single room occupancy units will be located on the second floor and have access to a shared kitchen/lounge room.
Le Quartier
Location: 174 Provencher Blvd
Developers: KAI Properties Inc.
Architects: Serhal Consulting | 818 Architecture
Status: U/C
Documents: ADMINISTRATIVE REPORT
Media: Provencher development gets green light
Description: The City of Winnipeg approved an application for a mixed use building to a vacant lot with 2 commercial units and 45 residential suites
787 and 783 Archibald Street
Location: 787 and 783 Archibald Street
Developers:
Architects: 2 Architecture Inc. (Andre Silva)
Status: In development
Documents: Subdivision and Rezoning
Project Post
Media: -
Description: 4 storey building with 18 residential units and 2 ground floor commercial units.
130 Sherbrook St
Location: 130 Sherbrook Street
Developers: Paragon Living
Architects: Affinity Architecture Inc.
Status: In development
Documents: Subdivision and Rezoning April 4, 2024 | Variance April 4, 2024
Media: Community groups line up against proposed Sherbrook development
Renderings
Description: A mixed use development with 102 dwelling units and 7 individual commercial spaces on the ground floor.
Place of Pride welcome centre
Location: 545 Broadway
Developers: Rainbow Resource Centre
Architects: Number Ten Architectural Group
Status: In development
Documents: -
Media: Architecture’s role in empowering LGBTTQ+ community
Renderings
Description: Rainbow Resource Centre's Place of Pride campus will feature A new glass-walled welcome centre which will provide a link between the apartment building and Wilson House so all three buildings are seamlessly connected. The welcome centre will include art spaces, a library and community-connection spaces along with a courtyard, garden and second-floor patio will provide outdoor community gathering spaces.
Hyatt Centric Winnipeg Downtown
Location: 325 Broadway
Developers: Kothari Group
Architects: Otto Cheng Architect Incorporated
Status: Under construction
Documents: HEDI program June 12, 2023
Media: Western Canada’s first Hyatt Centric hotel to open on Broadway
Project post
Description: A vacant six-story building at 325 Broadway will be converted into a 140-room Hyatt Centric hotel—the first of the Hyatt Centric brand in Western Canada. The modern, upscale property will host a wealth of amenities including a dramatic atrium, a restaurant, lounge and coffee shop and a spa and a fitness centre. This upscale lifestyle hotel is slated to open in Spring 2026.
685 Westminster Ave
Location:685 Westminster Ave
Developers: Lotus Holdings Winnipeg Ltd
Architects: Cibinel Architecture Ltd
Status: in schematic design
Documents: -
Media: Safer West Broadway touted with apartment proposal for Sherbrook Inn lot
Project post
Description: Six-storey mixed-use development with two-storey suites along Furby with private yards and apartments ranging from studios to three-bedroom suites.
CAPRI FLATS
Location:1819 Pembina Hwy
Developers: Sustainable Equity Partners Ltd.
Architects: BLDG architecture office inc.
Status: In development
Documents: Variance DAV 25-126412\C
Media:
Description: 10-storey mixed-use building with 240 dwelling units and 2 commercial spaces on the ground floor. The rear of the building is designed to provide direct pedestrian access to the rapid transit station and the public active transportation route.
Rubin Block - First Nation Healing Centre
Location: 270 Morley Avenue
Developers: Fisher River Cree Nation
Architects: AtLRG
Status: U/C
Documents: Variance
DAV 24-220304\C
Renderings
Media: Fisher River Cree Nation to restore century-plus old building on Osborne Street
Description: The historic Rubin Block building in Winnipeg will be transformed into a modern multi-family transitional complex, providing safe transitional housing for families in need. The building will contain 13 family sized apartment units, a small office and reception area, and one rentable commercial space fronting Osborne Street on the ground floor.
Maws Garage & Sanford Building
Location: 291 Bannatyne Ave
Developers: RIDGIX Building Solutions Inc
Architects: Northern Sky Architecture Inc
Status: In development
Documents: VARIANCE: 25-130698/B
Project Thread
Media: Neighbours concerned by redevelopment plan for Exchange District building
Description: 10 storey, 114 residential unit addition to the property with three storefronts
1141 St. Mary’s Road
Location: 1141 St. Mary’s Road
Developers: George & Dimitri Ifantis
Architects: Amphora Architecture Inc.
Status: In development
Documents: Closing – Portion of Craddock Avenue
Project Post
Media:-
Description: 5 storey, 38 residential units with storefronts including new flagship
George's Burger and Subs
187 Garry St
Location: 187 Garry St
Developers: Serhal Consulting Inc.
Architects: 818 Architecture Inc.
Status: In development
Documents: VARIANCE: 24-192824/B
Media:-
Description: The City of Winnipeg approved an application for a mixed-use development with three ground floor commercial units and 149 residential units split between a six storey tower and a twelve storey tower.
East of the Red RecPlex
Location: Northwest corner of Transcona Boulevard and Plessis Road, next to the Transcona Library
Developers: City Of Winnipeg
Architects: Number TEN Architectural Group
Status: In development
Documents: Open house presentation boards - February 2025 | Photo Gallery
Media: Winnipeg’s First New Public Pool in 4 Decades Proposed for Transcona
Project Post
Description: The City of Winnipeg is in the preliminary design stage of a new recreation centre called the East of the Red RecPlex. This proposed centre will be a place where families and individuals can enjoy various activities all in one location. The proposed regional centre will be located at the northwest corner of Transcona Boulevard and Plessis Road, next to the Transcona Library
• Video Link
South Winnipeg Recreation Campus
Location: Bison Drive west of Frontier Trail and east of Kenaston Boulevard
Developers: City Of Winnipeg
Architects: Architects: Diamond Schmitt Architects Inc.
Status: In development
Documents: Open House Presentation Boards - March 2025 | Photo Gallery
Media: City seeks input for design of new South Winnipeg Rec Campus
Project Post
Description: The City is building a new regional multi-use, multi-generational South Winnipeg Recreation Campus Phase 1 includes gymnasiums, multipurpose rooms, indoor walking/running track, a fitness area, a café, a serving kitchen, a child care centre, an outdoor spray pad and an addition to Pembina Trails Collegiate (50 Frontier Rd.), that supports vocational programs. Construction expected in 2026-2027. Future Phases to include, An aquatic center, A library, Outdoor leisure spaces, An arena & Athletic fields. The SWRC will be the largest investment in recreation in Winnipeg’s history.
• Video Link
Re-imagining Graham Avenue
Location: Graham Avenue
Developers: City Of Winnipeg
Status: Council review
Documents: CentrePlan 2050 - May 2024 | CentrePlan 2050 - Re-imagining Graham Avenue
Media: City asking for feedback on re-imagination of Graham Avenue
Project Post
Description: The City wants to create a signature street in Downtown. A place to meet-up on a patio, attend a market, gather for events, read a book in the shade, or walk a dog. In June 2025, bus routes will begin moving off Graham Avenue as planned in the Winnipeg Transit Master Plan. This gives Winnipeg an incredible opportunity to re-imagine how we use Graham Avenue.
Winnipeg Transit Master Plan
Documents: Winnipeg
Transit Master Plan
• Video Link
• Video Link
Osborne to Downtown Walk Bike Bridge
Location: Assiniboine River crossing, McFadyen Park and Fort Rouge Park, Winnipeg, MB
Developer: City of Winnipeg
Architects: TBD
Contractor: TBD
Size: TBD
Cost: Unfunded
Status: design Stage
Media: 3 designs pitched for new pedestrian bridge over Assiniboine River
Renderings
Description: A preliminary design for a new pedestrian and cycling bridge over the Assiniboine River will be developed to connect Osborne Village to Downtown via McFadyen Park on the north side of the river and Fort Rouge Park on the south side of the river. Considerations for this project include pedestrian and cycling connectivity throughout Osborne Village to Osborne Rapid Transit Station, Norwood Bridge, bike lanes on Nassau Street, and the riverwalk, upgrades to both McFadyen Park and Fort Rouge Park, crime prevention through environmental design (CPTED), and riverbank stabilization.
Bridge Option 2 of 3: Cable-Stayed Bridge:
Landmark double curved bridge:
The Refinery District (Bishop Grandin Crossing)
Location: Bishop Grandin Boulevard and Newmarket Boulevard, Winnipeg, MB
Developer: Hopewell Development
Cost: $500+-million
Status: U/C
Description: The Refinery District is a planned 102 acre mixed-use infill development built on the former Manitoba Sugar Beet Factory property which is exceptionally well-located in Southwest Winnipeg offering residential flex-space options to users and developers. This property is surrounded by many of Winnipeg’s fastest growing and affluent residential communities, with this Transit Oriented Development (TOD) featuring a variety of active and traditional transportation options serviced by a designated station on the Rapid Transit Corridor.
Media: Bishop Grandin Crossing will have it all; $500-M development will tie in with city's rapid transit corridor
Naawi-Oodena - Kapyong Barracks Redevelopment
Location: Route 90/Grant Avenue, Winnipeg, MB
Developer: Treaty One Development Corporation &
Canada Lands Company Limited
Status: U/C
Documents: MASTER PLAN MARCH 2021 |
Open House Boards - September 2023
Project Thread: Kapyong Barracks Discussion
Description: Formerly part of Canadian Forces Base/17 Wing Winnipeg, the Kapyong Barracks property is located between the Tuxedo and River Heights neighbourhoods in southwest Winnipeg. The property is comprised of approximately 65 hectares of land and 40 buildings, and was home to 2nd Battalion Princess Patricia’s Canadian Light Infantry, until it relocated to Canadian Forces Base Shilo in 2004. Seven Treaty 1 First Nations will be taking over the Kapyong Barracks land with plans to develop the largest urban reserve in Canada with a $2+ billion investment. Around two-thirds of the abandoned military base is being developed by the Treaty 1 Development Corporation, and the rest of the property will be developed by Canada Lands Co., a Crown corporation. Plans may include a sports facility, hotel, convention centre, war museum and an Indigenous hospice, green space as well as low, medium and high density residential areas.
Media: Everything is on track and going quite well’: Naawi-Oodena takes shape
Water Tower District
Location: St. Boniface, Winnipeg, MB
Developer: Olexa Developments |
Shindico Realty Inc.
Status: Consultation Stage
Project Thread: St. Boniface | Water Tower District
Description: The Public Markets Major Redevelopment Site is located within 4km of Downtown, Portage and Main, immediately to the east of the future Southeast Rapid Transit Corridor and bounded by industrial lands to the north and east, and rail lines to the south and west, single family south of the rail lines to the south and commercial, single family and multi-family west of the rail lines to the west. Approximately 185 acres of this total 222 acre Major Redevelopment Site has tremendous redevelopment potential as an infill, medium to high density housing, commercial and industrial development consistent with MRS policies outlined in Complete Communities on a vacant heavy (M3) industrial site.
Media:
Polo Park (mall parking lot redevelopment)
Location: 1485 Portage Ave, Winnipeg, MB
Developer(s): Shindico &
Cadillac Fairview Corporation Limited.
Status: In development
Media: Big plans unveiled for Polo Park development
Project Thread: Polo Park Expansion
Renderings
Description: CF and Shindico have collaborated on a renewed Master Plan vision for CF Polo Park and the surrounding lands bounded by Portage Avenue, St. James Street, St. Matthews Avenue, and Empress Street. The Polo Park lands encompass 84 acres, including the vacant former Canad Inns Stadium, and the Master Plan vision will create a complete community including a mix of residential, amenity and retail uses, a range of new parks, open spaces, a combination of private and public streets, as well as pedestrian and cycling connections centred around CF Polo Park, the largest shopping centre in Manitoba. In addition to building out the Stadium Lands, the Master Plan includes adding residential
and mixed-use density to the parking fields surrounding CF Polo Park.
Southwood Circle (University of Manitoba development)
Location: University of Manitoba Fort Garry Campus
Developer(s): UM Properties
Status: In development
Media: University of Manitoba unveils landmark urban community project
Project Thread: UofM | Southwood Circle
Description: Southwood Circle will grow and transform the University of Manitoba campus into a world-leading “UniverCity” where 65,000 people will live, work, study or play. It will be Manitoba’s first complete campus community and the largest residential mixed-use infill project ever embarked on in this city.
Master Plan
Fulton Grove Development
Location: Fulton Grove (Parker Lands)
Developer(s): Gem Equities
Status: In development
Documents: COMPREHENSIVE DEVELOPMENT VISUALIZATION PACKAGE, October, 2023
Media: Parker Lands project moving forward
Project Thread: Fulton Grove Development
Description: The Fulton Grove development in Winnipeg’s Parker Lands, River Heights – Fort Garry area is a transit oriented development that offers an important opportunity for revitalization and growth aligned with the city’s strategic vision. The development will provide a choice of housing (small lot single-family, townhome, condo and rental units) in an infill location.
Completed
STERLING WINDOW LOFTS
Location: 283 Portage Avenue, Winnipeg, MB
Developers: Sunrex Management LTD.
Architect(s):
Status: Completed 2018
Media: 'Homes for 'hipsters' Century-old office building to be converted into affordable apartments, developers say
Description: Located downtown Winnipeg. The eight levels above the first floor commercial space of the century-old Sterling Building were once offices and have now been beautifully transformed into a residential complex of 64 suites which are a combination of studio and one bedroom "Micro-Apartments".
Boyce Lofts
Location: 316 Ross Avenue, Winnipeg, MB
Developers: ALSTON PROPERTIES LTD.
Architect(s) : Monteyne Architecture Works Inc.
Status: Completed 2018
Media: Century-old warehouse on Ross Ave. set to turn into 84-unit apartment complex, $12-M project will see addition of parkade, apartment complex
Description: Heritage building conversion + new addition. Built in 1905, this historic heritage building was once home to The Boyce Carriage Company - a key business in the Winnipeg manufacturing industry, has now been converted into 94 stylish and modern lofts in the heart of Winnipeg’s most exciting area - The Northern Exchange District.
Porter House
Location: 165 McDermot Avenue, Winnipeg, MB
Developers: ALSTON PROPERTIES LTD.
Architect(s):
Status: Completed 2018
Media: From Housewares to Home - The Porter Building
Description:A six story warehouse built in 1906 (top five storeys vacant since 1975. The building's final occupant, a nightclub, left the main floor and basement in 2004 resulting in the entire building being vacant) New purpose built 34 modern loft style apartments accented with century old features in the heart of Winnipeg’s vibrant East Exchange District

The Porter Building in 1907.
Windsor Park Library
Location: 1195 Archibald St, Winnipeg, MB
Developer: City of Winnipeg
Architects: David Penner Architects &
Helio Rodrigues h5 Architecture
Contractor: Canotech Consultants Ltd.
Size: 8,000 Sq Ft
Cost: $4.9M
Status: completed March 2018
Media: Bigger, brighter, more accessible: New Windsor Park Library opens doors
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=152
Description: The new library includes a multi-purpose programming room, a tutorial room, and space for a collection of approximately 25,000 items. Tall glass walls surrounding the exterior, letting in natural light and views of the forest behind it, it also features an outdoor reading area and a mural designed by artist Simon Hughes.
390 On the River Condominiums
Location: 390 Assiniboine Ave
Architects: Verne Reimer Architecture & Mistecture Architecture & Interiors Inc
Contractor: Bockstael
Status: Completed November 2018
Description: 91 unit, 24 storey condo tower development
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=207408
McMillan Heights Condos
Location: 625 McMillan Avenue, Winnipeg, MB
Developer: Queenston Developments Ltd.
Status: Completed Fall 2018
Description: 4 luxery townhouse condominiums
Red River College Skilled Trades and Technology Centre
https://www.rrc.ca/fundraising/sttc/
Location: RRC’s Notre Dame Campus
Developer: Red River College
Architects: Number TEN Architectural Group
Contractor: Akman Construction Ltd.
Status: Completed November 2018
Description: state-of-the-art $60M 100,000 square foot Trades and Technology Centre housing new laboratory, shop space and classrooms for up to 1000 students per year in high demand trades and technologies.
Sherbrook Flats
https://sherbrookflats.com/
Location: 267 Sherbrook
Developer: Sotirios Corp
Architects: Sotirios Corp
Contractor: Akman Construction
Status: Completed June 2019
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=213278
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=127
Description: 6-storey 71 unit apartment block in West Broadway
The McMillan
http://themcmillan.ca//
Location: 958 McMillan Avenue
Developer: Ventura Developments
Contractor: Westland Construction Ltd.
Status: Completed June 2019
Description: Luxury development in Crescentwood/River Heights The high-end, multifamily project features 12 customizable residences, ranging in size from 1,200-1,500 sq. ft.
180 Roslyn Village Living
Location: 180 Roslyn, Osborne Village
Developer: Sunstone Resort Communities
Contractor: Graham Construction
Status: Completed June 2019
Description: 71,900 sq. ft. seven-storey 78-suite apartment complex in Winnipeg’s Osborne Village
1919 General Strike Monument 'Bloody Saturday'
Location: Pantages Playhouse Theatre Plaza
Artists: Bernie Miller and Noam Gonick
Status: Completed June 2019
Description: On a Saturday six weeks into the 1919 strike, tens of thousands of people gathered on Main Street at the former city hall to support striking workers and to protest the arrest days earlier of labour leaders.
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=128
Description: When a streetcar driven by strikebreakers approached, demonstrators rocked it off its tracks and set fire to it. The North West Mounted Police, joined by untrained special constables, rode into the crowd with clubs and guns. Bullets were fired. Two people died and dozens were injured as a result of the confrontation on a day now known as Bloody Saturday.
True North Square Phase 1:
17 floor Scotia Bank Tower, 242 Hargrave St
25 floor, 225 Carlton, retail, boutique office & residential
2 acres True North Square Plaza
Status: Completed July 2019
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
FORTUNE BUILDING Heritage restoration
Address: 232 Main St Winnipeg, MB
Location: https://www.google.com/maps/place/23...!4d-97.1367114
Developer:John Pollard
Architect: https://www.u7arc.com/projects/displ...rtune-building
Status: Completed Summer 2019
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=124
Smartpark Innovation Hub
Location: 100 Innovation Dr, University of Manitoba, Winnipeg, MB
Architect(s): Cibinel Architecture Ltd
Developer: University of Manitoba
Status: Complete June 2019
Cost: $44.5 M
Size: 75,000-square-foot 4-storey
Media: Open for business; Smartpark Innovation Hub is where U of M's research gets commercialized
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=147
Description: Smartpark Innovation Hub is a central gathering place for the Smartpark community, for province-wide university researchers, and for the local technology industry. The facility will support commercialization and professional services, encouraging partnerships to form that will drive the creation of new technologies, ultimately growing the number of local start-up companies. The 75,000-square-foot building is made up of a ground floor atrium, meeting rooms, a multipurpose room with 4K video walls, and a food service area, as well as two lab spaces. The second, third and fourth floors are tenant office spaces, with the fourth floor containing a Collision Corridor, where tenants can come together and network in the shared space. Tenants include: Bold Commerce, North Forge Technology Exchange, Futurpreneur, Cibus Canada, Pembina Trails Early College School, the University of Manitoba Technology Transfer Office, 151 Research and Backswath Management.
Stanley Pauley Engineering Building
Location: 97 Dafoe Road, University of Manitoba, Winnipeg, MB
Architect(s)/Engineer: Stantec
Developer: University of Manitoba
Status: Complete, Official opening May 2019
Size: 46,000-square-ft
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=148
Description: The building houses a wide complement of engineering related programs and laboratories, including the Price Innovation and Prototyping Centre used by student design teams, Co-operative education space and the Internationally-Educated Engineers Qualification program.
Transcona Library
Location: 1 Transcona Blvd, Winnipeg, MB
Developer: City of Winnipeg
Architects: Cibinel Architecture
Contractor: Boretta Construction
Size: 13,500 sqft
Cost: $6.5M
Status: Completed March 2019
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=151
Description: new Transcona Library centrally located hub for the community of Transcona featuring an outdoor reading garden, collection space for 40,000+ items, energy efficient mechanical systems, LED lighting, planting of domestic vegetation, low volatile organic compound materials and energy efficient glazing for an abundance of natural light throughout the building.
St. John's Library (ADDITION AND RENOVATION)
Location: 500 Salter St., Winnipeg, MB
Developer: City of Winnipeg
Architects: PUBLIC CITY
Contractor: Canotech Consultants Ltd.
Size: 950-squrare-feet of new space added to 104-year-old heritage building
Cost: $2.8M
Status: completed July 2019
Media: Winnipeg’s St. John’s library opens after $2.8 million in upgrades
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=153
Description: Updates to the library include a redesign of the main floor and lower level, two new tutorial rooms, two program rooms, and renovated washrooms. The work maintained and refurbished the library’s original features, and also saw new shelving and furniture, a lift, a new accessible entrance and washroom, and a new reading area and playground added.
http://www.whqwl.com/Mayor_Bowman/st...39711875960832
Waverley Underpass
Waverley St. at Taylor Ave.
Display Boards: https://www.winnipeg.ca/publicworks/...playBoards.pdf
Cost: $98M
Status: Completed August 2019
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=156
Waverley Underpass - Design
• Video Link
96 St. Mary's Road
Location: 96 St. Mary's Road
Developer: Prairie Commercial Inc
Architect(s): Mistecture
Status: Completed 2019
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=171
Description: 6-unit, three-storey (35 feet in height) multi-family dwelling in the St. Boniface neigborghood of Norwood Flats.
889 Grosvenor Court
Location: 889 Grosvenor AveWinnipeg, MB
Status: Completed 2018
Description: Executive Suites for Lease
Women's and Newborn Hospital
Location: 665 William Ave, Winnipeg, MB
Architect(s): Architecture49 & Parkin Architects
Developer: Province of Manitoba/Winnipeg Regional Health Authority/Health Sciences Centre
Construction Manager: EllisDon
Cost: $232 million
Size: 388,500-square-ft 5-storey
Media: HSC prepares for birth of new Women's Hospital in December
Status: Completed Dec 2019
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=149
Description: Targeting LEED® Silver Certification. Located at the Health Sciences Centre, the largest health care centre in Manitoba the WNH will feature 173 new beds , state of the art ambulance bays, triage, and retail services, a new NICU unit, operating rooms, post-partum units, and spiritual centres - including a ceremonial space for smudging. The new hospital will be a place of caring support for all the diverse families of Winnipeg and Manitoba. From single-patient rooms with large windows, a super-efficient layout for medical units and highly sustainable and calming green roof, the Women and Newborn Hospital is designed to be welcoming, respectful, and peaceful for families. The new hospital is the largest capital health project ever undertaken in Manitoba.
The Women's and Newborn Hospital's exterior features a curtain wall with a picture of an elm-tree digitally printed on the glass.
703 St Annes Road
Location: 703 St Annes Road, Winnipeg, MB
Developers: ALSTON PROPERTIES LTD.
Architect(s) : AtLRG Architecture
Status: Completed Dec 2019
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=144
Description: 33 new rental apartments located on the banks of The Seine River in Winnipeg
Norwood Hotel renewal
Location: 112 Marion St.
Developer: Sparrow Hotels
Architects: FRANK Architecture
Contractor: PCL Construction
Status: Completed Nov 2019
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=150
Description: Renovate the interior of the existing restaurant located to the east of the existing hotel. The work also includes exterior alterations to the street facing façade.
The façade upgrades include the following:
o Additional openings for windows;
o Replacement of the existing windows with new larger windows including muntins;
o A new design for the main entrance as well as the secondary entrance;
o Replacement of the existing cladding materials with a darker brick;
o New façade lighting.

Norwood Hotel before

Norwood Hotel after rendering
Southwest Bus Rapid Transitway (Stage 2)
Status: Completed April 2020
Cost: $467.3 million (estimate)
Description: The Southwest Transitway is a dedicated high-speed roadway for buses, physically separated from the regular street system linking Downtown to the southwest part of the city. Buses operate at speeds up to 80 km/h, free of any other traffic, providing very fast, reliable service.
Stage 1 of the Southwest Transitway, completed in 2012, is 3.6 kilometres in length and currently runs from Queen Elizabeth Way & Stradbrook Avenue to Pembina Highway and Jubilee Avenue.
Stage 2 includes a 7.6 kilometre southerly extension of the existing infrastructure from Pembina
Highway and Jubilee Avenue to the University of Manitoba. When completed in spring 2020, the Southwest Transitway will operate from Downtown to the neighbourhoods of southwest Winnipeg, including the University of Manitoba.
Status: Completed Spring 2020
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=146
Richardson Innovation Centre
Location: Westbrook Street and Lombard Avenue
Architect(s) : Number TEN Architectural Group
Developers: Richardson International
Size: 62,000 sq. ft.
Budget: $30M
Completed: Summer 2020
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=232883
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...2&postcount=64
Status: U/C
Description: Innovation Centre in the heart of downtown Winnipeg, featuring state-of-the-art technology and equipment for research and product development.
LA MAISON
Location: 153 Rue Aubert, Winnipeg, MB
Developer: Progressive Real Estate
Architects: Affinity Architecture Inc.
Contractor:
Status: Completed summer 2020
Description: A 4-storey multi-family residential building complete with 20 residential units, two dwelling units at-grade with parking located at the rear of the building.
NOTRE TERRACE
Location: 173 Notre Dame St
Developer: Ironclad Developments Inc.
Architects:
Status: Completed Aug 2020
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...1&postcount=89
Description: 5-storey, 78 unit multi-family residential infill development in Old St. Boniface, replacing existing commercial warehouse/junk yard.
Warehouse 1885
Address:104/108 Princess Street, Winnipeg, MB Winnipeg, MB
Location:https://www.google.com/maps/place/10...!4d-97.1421145
Developer: Legatum Development
Architect: http://www.5468796.ca/
Status: Completed Summer 2020
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=126
Description: Redevelop two existing landmark properties on the corner of Princess/Bannatyne into 39 desirable residential rental units plus 5,500 sq/f of commercial space on the main floor.
The renovation will construct a 3 Storey addition on top of 108 Princess to accommodate more rental units plus access to rooftop patio on 104 Princess.
Muse Flats
Location: 290 ColonyStreet
Size: 103,000 SQ FT
Architect(s): Michael Maltzan Architecture
Construction Manager: Bockstael Construction
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=233330
Status: Completed summer 2020
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=109
Description: 119 studio, one, two and three bedroom residential units
50 Hargrave
Location: 44 Hargrave (South Broadway)
Developer: The Sunrex Group of Companies
Architect(s) : AtLRG Architecture Inc.
Status: Completed Summer 2020
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=120
Description: A 6 storey, 65 suite downtown in-fill apartment building with surface level open-air parking behind the building.
Das Haus
Location: 123 Scott St, Winnipeg, MB
Developer: Privileged Communities
Architect(s): 2 Architecture Inc
Contractor:
Status: Completed summer 2020
Media:
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=180
Description: Residential apartment infill in the Osborne Village Neighborhood, a modern twist of the monopopy house with mix of 1 and 2 bedrooms units
http://clkapps.winnipeg.ca/dmis/View...ctionId=495453
West Broadway Commons
Location: 175 Colony Street
Architect: Number TEN
Developers: UWCRC 2.0 Inc. and All Saints Anglican Church (Joint Venture Owners)
Construction Manager: Bockstael Construction
Size: 62,000 sq. ft.
Status: Completed December 2020
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=233329
Status: U/C
110-unit, mixed-income apartments, with over 3,000ft2 of street-level commercial space

October 2020:
THE SPOT AT EAST VILLAGE
Location: 221 Stradbrook Ave
Developer: Private Pension Partners
Architects: MMP Architects Inc.
Contractor: Akman Construction Ltd.
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...3&postcount=80
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=230613
Status: COMPLETED Winter 2021
Description: 18 Storey Residential Apartment with 145 units

Dec 2020:
Inuit Art Centre at the Winnipeg Art Gallery
Location: 300 Memorial Blvd, Winnipeg, MB
Architect: Michael Maltzan Architecture
Developers: Winnipeg Art Gallery
Size: 40,000 sq. ft. Addition to existing art gallery facility
Completed: March 2021
Budget: $65 M
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Status: U/C

March 2021:
Bill and Helen Norrie Library
Location: Cambridge Street and Grant Avenue, Winnipeg, MB
Developer: City of Winnipeg
Architects: LM Architectural Group
Contractor: Gateway Construction
Size: 14,000 Sq Ft
Cost: $6.3M
Status: COMPLETED
Media:
Proposed design calls for City’s first non-gendered, universal washroom
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=129
Description: The new library will be northwest of the Pan Am Pool, near the intersection of Poseidon Bay and Cambridge Street. It will take up 14,000 square feet in the Grant Park campus and will replace the existing River Heights Library at 1520 Corydon Ave. The new library is set to open in 2021.
Mar 2021:
30UC
Location: 30 University Crescent, Winnipeg, MB
Developer: Paragon Design Build
Architects: BLDG architecture office inc.
Contractor: Bockstael Construction
Status: COMPLETED 2021
Renderings & Construction pics:https://skyscraperpage.com/forum/sho...&postcount=137
Media: New housing complex gets go-ahead; Residential development planned for University Heights
Description: Seven storey 104 unit multi-family residential building
Dexter House
Location 93 Nassau St
Developer: Lount Corporation
Architect(s): Neil Cooper Architect
Contractor: Canotech Consultants Ltd.
Status: COMPLETED 2020
Description: 4 storey 13 unit Apartment
Media: Winnipeg’s Lount Corp. develops new niche: Luxury apartments
93 St. Anne’s Road
Location: 93 St. Anne’s Road, Winnipeg, MB
Developer: Wpg New Home Inc.
Architects: BLDG architecture office inc.
Status: COMPLETED
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=194
Description: Mixed use development with 1,980 square feet of commercial space and parking at grade with two storeys of five (5) two bedroom residential units above.
710 Westminster Ave
Location: 710 Westminster Ave, Winnipeg, MB
Developer: Chanden Homes Ltd.
Architect(s): Unit 7 Architecture
Status: COMPLETED 2021
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=114
Media: Luxury rentals in West Broadway, Close to Sherbrook Street cafés, restaurants
Description: The building includes approximately 11,600 sq.ft. of leasable commercial space on two levels; close to 31,000 sq.ft. of apartments on four levels for a total of 44 living units; and a 12,800 sq.ft./42-car parking area, of which half is protected under the building.
Status: Completed
The Arts Residences
Location: 233 Kennedy St, Winnipeg, MB
Developer: Hazelview Properties
Architect: Number TEN Architectural Group
Status: COMPLETED JULY 2021
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=162
Description: Hazelview Properties plans include to 14,000 sq. ft. of brand-new commercial space on the main and second floor and a broader conversion to 104 loft residential luxury apartments
Status: Completed
Media:
Downtown tower redevelopment to include apartments, office and retail space
True North Square Phase 3:
Wawanesa Mutual Insurance North American HQ
Location: 372 Graham Avenue and 236 Carlton Street, Winnipeg, MB
Developer: True North Real Estate Development (TNRED) & The Wawanesa Insurance
Architects: Architecture49
Contractor: PCL Constructors Inc
Status: Completed
Media: Wawanesa moving to new office tower at True North Square
Documents: http://clkapps.winnipeg.ca/DMIS/View...ctionId=576525
Project Thread: http://skyscraperpage.com/forum/showthread.php?t=245822
300 Main Street Apartment Tower
Location: 300 Main Street
Developers: Artis REIT
https://300main.ca/
Architect: Raymond SC Wan Architects
http://raymondscwanarchitect.com/300-main/
Floors: 42
Height: 465' | 142M
Phase 1: Reclad existing tower at 360 Main (complete)
Phase 2: Residential highrise (under construction)
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Status: Completed
• Video Link
Canada's Diversity Gardens
Location: Assiniboine Park Winnipeg, MB
Developers: Assiniboine Park Conservancy
Architect(s) : KPMB (Design Architect) in association with
Architecture 49
Completion: 2020
Size: 84,400 s.f.
Project Type: Cultural
Cost: 97.5M
Status: Completed
Description: 21st century botanical conservatory situated at the head of an existing Formal Garden at Assiniboine Park designed for LEED Silver Certification. It will be a signature piece of architecture that generates awareness and a presence in the park, an interactive destination that focuses on the interrelationships of plants and people, and a sustainable precedent focussing on horticulture, plants and the environment.
Fact: Main structure 'The Leaf' will be made of an extremely lightweight see-through plastic
Ethylene tetrafluoroethylene (ETFE) and will contain the largest indoor waterfall in canada at 6-storey in height.
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
• Video Link
Red River College - Innovation Centre Exchange District Campus
Location: Location: 319 Elgin Avenue, Winnipeg, MB, Downtown Exchange District Campus
Architect: Diamond Schmitt Architects inc. and
Number TEN Architectural Group
Developers: Red River College
Size: 100,000 sq. ft.
Budget: $95M
Completed: Completed
Project Thread: http://forum.skyscraperpage.com/show...light=winnipeg
Status: U/C
• Video Link
James Ave Pumping Station Redevelopment
Location: 109 James Avenue, Winnipeg, MB
Developers: ALSTON PROPERTIES LTD.
Architect(s) : 5468796 Architecture Inc
Status: Completed
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=223833
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=122
Phase 1: 18,600 SF of office/retail space in the James Ave Pumping Station Building. Slated for demolition after 17 attempts to revive the historic structure over the last 14 years, the James Avenue Pumping Station was successfully preserved through the development of a financial / building pro forma that would make it financially feasible. 100% leased. Spring 2018 occupancy.
Phase 2: 28 high end rental apartments on Waterfront Drive available spring 2020.
Status: Completed
Phase 3: 65 rental apartments.
Status: Completed
Status: Completed(Phase 3):
Osborne 380
Location: 380 Osborne
Developer:
Architect: DIN Projects
Status: Completed
Media: Infill apartment block planned for 380 Osborne
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...7&postcount=81
Description: 7-storey residential mixed use building with 71 dwelling units and one commercial spac ewith two levels of indoor parking, one underground and one at grade
The Arc Phase 1
Location: Location: 2525 Pembina Hwy , Winnipeg, MB
Architect: Architects + Research + Knowledge, Inc.
Developer: Campus Suites
Size: 352-unit, 16-storey multi-family building
Completion date: Unknown
Budget: $70 M
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=236081
Status: Completed
Renderings & Construction pics: http://forum.skyscraperpage.com/show...1&postcount=91
Description: 570 bed mixed-use student housing community in phase 1, phase 2 under development
http://clkapps.winnipeg.ca/DMIS/View...ctionId=493074
• Video Link
Phase 2: Phase 2: The current proposed building (phase 2) is approximately 60 meters tall (18 storeys plus a mechanical penthouse). This will be able to provide 432 Residential units that will vary between 1, 2 and 4-bedrooms. One major feature will be the commercial/retail uses on the main floor of the building, similar to the Arc (2525 Pembina) development. Please note that building details may change based on feedback received throughout the engagement process
281 River Ave
Location: 281 River Ave, Winnipeg, MB
Architect: BLDG architecture office inc.
Developer: Towers Realty Group
Size: five-storey, 100-unit residential complex
Status: Completed
Royal Aviation Museum of Western Canada
Location: Winnipeg Airports Authority campus on Wellington Avenue
Developer: Royal Aviation Museum of Western Canada
Architect(s): Architecture 49
Budget $45 million
Size 86,000 sf
Status: Completed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=101
Media:
Ottawa set to announce $8.8 million for the Royal Aviation Museum
• Video Link
238 wellington crescent
Address: 238 wellington crescent Winnipeg, MB
Location: https://www.google.com/maps/place/23...67!4d-97.15065
Developer: http://trademarkbuilders.ca
Architect: http://www.5468796.ca/
Status: Completed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=123
Description: Infill development in a mature Winnipeg neighbourhood is starting construction. Six units replacing a single house on Wellington in Osborne.
Smith Street Lofts
Location: 185 Smith St Winnipeg, MB
Developer: Edison Properties
Architect(s) : MMP Architects Inc.
Construction Manager: Akman Construction Ltd.
Status: Completed
Project Thread: https://forum.skyscraperpage.com/sho...d.php?t=240240
Description: Former social housing complex being retrofitted to mix of 250 market-rate rentals and affordable units, renovations expected to be completed in 2021
Media: Smith Street tower will 'look like a very different building'
NewPortCenter Redevelopment
Location: 330 Portage Ave, Winnipeg, MB
Developer: KingSett Real Estate Growth LP No. 6 and CCI Corpfin Capital Acquisition Fund 1 LP
Status: Completed
Renderings & Construction pics: http://skyscraperpage.com/forum/show...8&postcount=93
Description:Lobby renovations, podium refurbishment & exterior reclad
201 Portage Avenue lobby renovations
Address: 201 Portage Winnipeg, MB
Developer: Harvard Property Management Inc
Status: Completed
Terrasse Boisjoli
Location: 989 Ducharme Avenue, St. Norbert, Winnipeg,
Developer: https://legatumdevelopment.co/
Architect(s): 5468796 Architecture Inc
Status: Completed
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=103
Media: Renaissance underway in St. Norbert, Planned residential complex incorporates elements of Franco-Manitoban architecture
Description: Terrasse Boisjoli is a new 5 storey mixed-use multi-family project consisting of 40 1-and 2-bedroom suites, in-suite laundry, 9ft ceilings, heated indoor parking, and commercial space on the ground floor.
The Halo
Location: 2021 Pembina Highway, Winnipeg, MB
Developer: Private Pension Partners
Architects: Affinity Architecture Inc
Contractor: Unknown
Status: Completed
Media: Mystery revealed
Renderings & Construction pics: https://skyscraperpage.com/forum/sho...3&postcount=92
Description: 2 apartment towers 15 and 16 storeys, combined 406 residential units
227 Stafford
Location: 227 Stafford
Developer: Progressive Real Estate
Architects: Affinity Architecture Inc
Status: Completed
Renderings & Construction pics
Description: Office space proposed for 2nd and 3rd floor, 4 residential units proposed for top floor
Media The Sou'wester Winnipeg Free Press
PRINCESS STREET APARTMENTS
Location 265 Princess St, Exchange District
Developer: Unknown
Architects: VERNE REIMER ARCHITECTURE INCORPORATED
Status: Completed
Renderings & Construction pics
Description: 88 Apartment Units
Urban Square
Location: 230 Good Street (West Broadway)
Developer: Iron Clad
Architects:
Status: Completed
Renderings & Construction pics
Description: Six storey multifamily residential building with 145 units.
Media: Approval sought for West Broadway complex; Addition of 145 units would ease city's need for new housing, councillor says
ZÜ
Location: 160 Osborne St
Developer: Private Pension Partners
Architect(s) : BLDG architecture office inc.
Status: Completed
Construction Manager: Pre-Con Builders
Project Thread: ZÜ
Description: 3 new buildings at the site of the (soon to be demolished) Osborne Village Inn. All three buildings will have covered and underground parking with 207 apartment suites across two lots, a total of 54,110-square-feet and about 14,000 square feet of combined commercial space at street level.
Media: Redevelopment of Osborne Village Inn passes first test
• Video Link

- 160 Osborne St, a six-storey,mixed-use, multi-family apartment building with 89 units

- 424 and 425 Wardlaw Ave. two four-storey, mixed-use, multi-family complexes with 59 units each
Vue Taché
Location: 780 Taché Ave, (North St. Boniface)
Developer: StreetSide Developments
Architect(s) : 701 Architecture Inc.
Status: Completed
Construction Manager: Unknown
Renderings
Description:StreetSide Developments is currently developing a 7-storey, concrete multi-family rental building, featuring approximately 87 units and underground parking across from Parc Elzéar Goulet in old St. Boniface.
FORTWHYTE ALIVE EXPANSION
Location: 2505 McGillivray Blvd
Developer: FortWhyte Alive Outdoor Adventure Center
Architect(s): Unknown
Status: Completed
Construction Manager: Unknown
Description: Funding will support FortWhyte Alive in two extensive improvement projects:
- The renovation of one of FortWhyte Alive’s key facilities – a deep energy retrofit and interior renovation of the iconic 35-year old Interpretive Centre.
- The construction of a new facility, Buffalo Crossing – an 18,000 square foot multi-purpose building that will serve as a new southern gateway to FortWhyte from McGillivray Blvd. and a hub for new and creative outdoor recreation and education.
Gregg Building Lofts
Location: 52 Albert Street, Winnipeg, MB
Developers: Knysh Construction
Status: Completed
Media: 'Rock-solid' reincarnation
Renderings & Construction pics
Description: Unoccupied for over a decade plans are to keep the first two floors as commercial space, while floors three, four, and five will be potentially converted into 16 residential spaces.
Cornish Library (ADDITION AND RENOVATION)
Location: 20 WestGate, Winnipeg, MB
Developer: City of Winnipeg
Architects: PUBLIC CITY
Cost: $2.8M
Status: Completed
Media: Cornish Library closes for upgrades
Renderings & Construction pics
Description: Renovations to 104+ year old heritage building include accessible entrance and washroom, complete redesign of spaces with adult, children's and teen areas on main floor, a computer area, and study and leisure spaces. An addition to the south of the building will feature an inviting glass reading room, overlooking both the gardens and riverbank, providing an intriguing view from Sherbrook Street to the northwest.
CRESCENT DRIVE PARK PAVILION
Location: 781 Crescent Drive, Winnipeg, MB
Developer: City of Winnipeg
Architects: PUBLIC CITY
Cost: $850,000
Status: Completed
Media: Design for Crescent Drive Park pavilion revealed
Renderings
Description: Crescent Drive Park Pavilion is an amenity structure that reaches into the landscape to support four-season activity beyond the building and within Winnipeg’s urban forest. Framed with native plantings, the structure supports new washrooms and change rooms and includes a fire pit, barbeque areas, and a skate change area.
Misericordia Assisted Living
Location: 691 Wolseley Ave.
Developer: Misericordia Corporation, Kastes Planning & Development
Architec(ts): Raymond SC Wan Architect Inc.
Contractor: Concord Projects Ltd.
Status: Completed
Media: Seniors housing to replace Misericordia resource centre
Renderings
Description: 10-storey 97 suite seniors living complex in West Broadway
Uptown Theatre (Redevelopment)
Location: 394 Academy Rd, Winnipeg, MB
Developers: Globe property management
Architect(s)/Engingeers: Nejmark Architect
Construction Manager: Concord Projects Ltd
Status: Completed
Description: The Uptown Theatre is a historic gem, located in the heart of the walkable Academy Road commercial area in River Heights. Redevelopment plans of this historic former theatre and bowling alley into a mixed-use development include 23 residential rental units ranging from 800 to 1,020 square feet, 4,000 sq. ft. of office space on the second floor and two ground-level retail storefronts.
Renderings & Construction pics
Media: New life for River Heights landmark, Developer has vision for former theatre, bowling alley
Status: Completed
National Research Council (NRC) advanced manufacturing development facility
Location: CentrePort Canada
Developer: National Research Council Canada
Architects: Number Ten Architectural Group & Diamond and Schmitt Architects Inc,
Contractor: Penn-Co Construction Canada (2003) Ltd.
Status: Completed
Media: National Research Council to be new CentrePort Canada tenant
Renderings
Description: The 70,000-square-foot $60-million building will be located at CentrePort Canada, North America’s largest inland port, will broadly support the advanced manufacturing sector in areas such as additive manufacturing (3D printing), robotics and the integration of new digital technologies, such as artificial intelligence and the Internet of Things, into the manufacturing process. When completed, it will accommodate about 100 people, 40 per cent of those working in the building at any given time will be NRC staffers, while the rest will be from industry and academia.
The BendA Rental Community in the Exchange District
Location: 90 Alexander Ave (Exchange District)
Developer: RNDSQR
Architects: 5468796 Architecture
Status: Completed
Media: Waterfront wrap-around, Calgary developers planning to surround a rehabilitated heritage building with two new rental developments
Project thread: 90 Alexander
Renderings & Construction pics: http://skyscraperpage.com/forum/show...&postcount=170
Description: $100 million investment, 300 rental apartments split between two recently acquired properties including the current site of Great West Metal; plans also include to rehabilitate an existing heritage building to create 16,000-square-feet of commercial/office space.
The Ted
Location: 475 St Anne's Road.
Developer: Ryan Ridge owner of Ridgix Building Solutions Inc.
Architects: Northern Sky Architecture Inc.
Status: Completed
Media: New life for vacant sites in St. Vital
Renderings
Description: Six-storey, mixed-use building in the Lavalee neighbourhood of St. Vital with 77 residential units — and five commercial spaces at street level.
LOT 6
Location: 15 Berwick Crt.
Developer: Ironclad Developments Inc.
Status: Completed
Renderings
Description: Transit oriented development at the Fort Rouge yards near the Fort Rouge Station along the Southwest Transitway.
96 Maryland St
Location: 96 Maryland St
Developer:
Architects: 2 Architecture Inc
Contractor:
Status: Completed
Renderings
Board of Adjustment: April 4, 2018
Description: four-storey multi-family residential building with 6 units in Wolseley
The Point of Wellington
Location: 254 Wellington Crescent
Developer: G&E Homes
Architects: 2 Architecture Inc
Status: Completed
Description: New 13 unit apartment building located at the intersection of Gertrude and Wellington in Osborne Village. The building is located on a pie shaped lot next to a city park, with unobstructed views of the surrounding area from all apartments. The building includes enclosed underground heated parking, a beautiful common roof top terrace, and a car share program made available to tenants and the public.
530 River
Location: 530 River Ave, Winnipeg, MB
Developer: paragon design build.
Architects: Affinity Architecture Inc
Contractor: Unknown
Status: Completed
Media: City approves Village development
[B]
Renderings
Description: 530 River is an upscale apartment residence located in the heart of Winnipeg’s Osborne Village neighbourhood. This building will have an elevator, heated underground parkade, and will have 20 units available for rent Spring 2021.
606 Stradbrook Apartments
Location: 606 Stradbrook Avenue , Winnipeg, MB
Developer: Uknown
Architects: BLDG architecture office inc.
Status: Completed
[B]
Renderings
Description: 4-storey, 32-unit multifamily dwelling
https://live.staticflickr.com/65535/...d63b12b3_c.jpg
Taylor Lee Residence
Location: 1010 Taylor Ave, Winnipeg, MB
Developer: Shindico
Architects: BLDG architecture office inc.
Contractor: -
Status: Completed
Media: Retail developer moves into multi-family, industrial projects in Winnipeg;
[B]
Renderings
Description: 124-suite apartment building at Grant Park Festival, The concrete, steel and glass structure will also have 1.2 parking spots per unit.
433 Main St - Tower Residential Conversion
Location: 433 Main Street, Winnipeg, MB
Developer: Alston Properties Ltd
Architect(s): AtLRG Architecture
Contractor:
Status: Completed
Media: City real estate continues to evolve
Renderings & Construction pics: http://skyscraperpage.com/forum/show...&postcount=220
Project Thread: http://skyscraperpage.com/forum/showthread.php?t=242936
Description: A 14 storey tower constructed in 1974 sits amongst Winnipeg’s historic collection of turn-of-the-Centrury building stock. A post-tensioned concrete & curtainwall building, its panoramic views are unmatched within the historic district. This project is converting the top 10 office floors into 94 residential units. The building will receive an envelope upgrade which includes glazing the front half of the existing precast panels and the development of a hung amenity space balcony on the penthouse level.
Riverwood House
Location: 65 Stadacona Street, Winnipeg, MB
Developer: Riverwood Church Community & Winnipeg Supportive Housing Inc
Architects: Sputnik Architecture Inc.
Contractor:
Status: Completed
Media: City to mull Elmwood church sober-living facility plan; Transitional housing will be safe, supportive place to live after recovery
Renderings & Construction pics:
Description: With this new housing initiative by Winnipeg Supportive Housing Inc., in partnership with Riverwood Church Community, plans to construct a 40-unit housing complex that takes aim at poverty by developing supportive and safe housing for 40 of Winnipeg’s at-risk population in the emerging neighborhood of Elmwood.
Participants will have the opportunity to experience a community environment with peer based supports while gaining access to professional services and relational supports provided by on-site staff, partnering organizations and volunteers.
Ronald McDonald House
Location: 62 Juno St, Winnipeg, MB
Developer: RMHC Manitoba
Architect{s}: ft3 Architecture Landscape Interior Design
Contractor:Unknown
Status: Completed
[B]
Renderings
Description: The new Ronald McDonald House, located just blocks away from Health Sciences Centre, will be a home away from home for out-of-town families with children who require treatment in hospital. The playful concept of a tree house is reflected in the corner glass atrium that houses a two-storey high play structure, greeting families upon arrival. The design of the house connects the interior of the house with its exterior surroundings through the use of colorful glazed window boxes, multi-level terraces and a large interior courtyard.
Granola Heights
Location: 198 Sherbrook, Winnipeg, MB
Developer: Alston Properties Ltd.
Architects: Monteyne Architecture Works Inc.
Contractor: Unknown
Status: Completed
Media: Housing takes root |
Development promises vibrancy, renewal
http://skyscraperpage.com/forum/show...&postcount=229
Description: 5-storey, 28-unit mixed use infill apartment building
Le Market
Location: 316 Rue Des Meurons, Winnipeg, MB
Developer: Freedhome Developments
Architects: Number TEN Architectural Group
Status: Completed
Project Thread: 316 Rue Des Meurons
Description: 6-storey mixed use building encompassing 65 residential units and 2 small scale commercial units on the ground floor. A total of 71 parking stalls will be provided, 31 of which will be located below grade under the building.
Places to Go – Public Restroom Strategy
Location: 715 Main St, Winnipeg, MB
Developer: City Of Winnipeg
Architects: BridgmanCollaborative Architecture
Status: Completed
[URL="http://skyscraperpage.com/forum/showpost.php?p=9142940&postcount=238"]Renderings
Media: Plan seeks to breathe new life into Thunderbird House site
Description: Permanent public washroom located on the southwest corner of the Thunderbird House site on Main Street, and feature garage-style doors that, when open, are visible from the street, with private stalls in the back. There is an office for staff and security and a shower available for use.
The Bolt
Location: 2735 Pembina Hwy
Developer: Globe Capital Management
Architects: NEJMARK ARCHITECT
Status: Completed
Media: Like a Bolt from the blue; New 181-unit Richmond West apartment complex opens doors
Renderings
Description: $55-million 181-unit building, 7-storey building height with High-quality brick finish
Unbuilt
Hyatt Place Downtown
Location: 138 Portage Avenue East
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=234120
Status: Canceled
825 Taché
http://825tache.com/concept/
Address: 825 Taché
Developer: Sunstone Group
Status: canceled
Project Thread: https://forum.skyscraperpage.com/sho...d.php?t=224415
Seven (7) storey residential condominium building containing 78 units along the Red River at Taché Avenue and Rue Hébert;
LE QUARTIER
Address: 174 Provencher Blvd
Location:https://www.google.com/maps/place/17...xB0wAHoECAoQAg
Architects: northern sky architecture inc
Developer: KAI Properties
Status: Canceled
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=106
Address: Dumoulin and Langevin
Location:https://www.google.ca/maps/@49.89379...7i13312!8i6656
Architects: https://www.2architecture.ca/
Status: Canceled
60-70 Unit 4 storey residential
WHL Arena
Location: Oak Bluff
Developer: 50 Below Sports + Entertainment
Status: Canceled
Project Thread: http://forum.skyscraperpage.com/showthread.php?t=237550
4,500-seat areana, home to the WHL's Winnipeg Ice
• Video Link
98 Albert street
Location: 90 Albert St & 98 Albert street Winnipeg, MB
Developer: Unknown
Architect(s) : AtLRG Architecture Inc.
Status: Canceled
Renderings & Construction pics:https://forum.skyscraperpage.com/sho...&postcount=119
Description: 3-storey wedge, main floor restaurant space with future sidewalk patio, 2 prestige residential units and rooftop terrace with garden
320 River Avenue
Address: 320 River Avenue
Location: https://www.google.ca/maps/@49.88102...7i13312!8i6656
Architects: http://www.prairiearchitects.ca/
Status: Canceled
3-storey multifamily building with 12 units, he development is clad in brick with some corten steel accents, The development locates the parking inside the building
456 Bannatyne Avenue
Address: 456 Bannatyne Avenue
Location:https://www.google.com/maps/place/45...60692329565936
Architects: http://www.h5architecture.ca/
Status: Canceled
(4) storey mixed use building comprising of twenty six (26) residential units above ground and one (1) commercial unit at grade. The existing row housing on site will be removed.
Address: 139 Notre Dame St
Location:https://www.google.ca/maps/place/139...!4d-97.1253026
Architects: https://www.2architecture.ca/
Status: Canceled
Address: 235 Dumoulin St
Location:https://www.google.ca/maps/place/235...!4d-97.1200569
Architects: https://www.2architecture.ca/
Status: Canceled
2 Storey townhouse, 6 1000 sq2 units
The Forks National Heritage Site Visitor Centre
Location: 45 Forks Market Road, The Forks National Historic Site, Winnipeg, MB
Developer: The Forks North Portage Partnership
Architect(s): 1x1 architecture inc.
Size: 7,653 sq.ft.
Status: Canceled
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=159
Description: Due to the requirement by Parks Canada to not increase the built form on the protected site, the proposed Visitor Centre is located at the site of the existing orientation node, and will renovate the existing washroom / office building which consists of a circular structure constructed of tyndall stone plinths carrying a wood trellis. A major east-west axis cuts through the National Historic Site. From the west, this axis starts at the dome of Union Station, situated at the end of the Broadway promenade, continues through the centre of the orientation node and culminates at the Saint Boniface Cathedral-Basilica Parish on the east side of the Red River. This axis symbolically connects St. Boniface to Winnipeg’s downtown. The design intent was not only to maintain this axis, but to enhance it, thus the Visitor Centre was split into two buildings.
129 McDermot Avenue
Location: 129 McDermot Avenue, Exchange District
Developer: United Equities Group
Architects: Number Ten
Status: Canceled
Renderings & Construction pics
Upper Fort Garry Provincial Park Interpretive Centre
Location: Assiniboine Ave
Architects: designed by landscape architects Hilderman Thomas Frank Cram and architects Cohlmeyer Architecture Ltd.
Status: Canceled; Fundraising stage
Description: An interpretive centre, complete with exhibit space, a multi-purpose theatre, food service, a digital library and office space, will be the final piece within the park.
216 Sherbrook
Location: 216 Sherbrook St, Winnipeg, MB
Developer(s): Almaleki Developments Inc
Architect(s): 701 Architecture Inc.
Construction Manager: Ross Construction Limited
Status: Unknown
Renderings
Description: 216 Sherbrook will be a mix use project featuring 24 stunning, luxurious apartments with incredible amenities like a rooftop terrace, top of the line finishes and so much more. This project will also include commercial space with exciting businesses to be announced very soon!
Status: Canceled
Regent
Location: 500 Regent, Trasncona neighborhood
Developer:
Architects: 2 Architecture Inc
Contractor:
Status: Canceled
Renderings & Construction pics: https://forum.skyscraperpage.com/sho...&postcount=178
Description: Residential apartment, 6 units ,5,520 SQ.FT
REVIVAL
Location: 817 St Paul ave. Winnipeg, MB
Developer: Privileged Communities
Architects:
Contractor:
Status: Canceled
Renderings
Description: Infill apartment in the West End neighbourhood of St Mathews and Minto
Tech Offices
Location: 134 William Stephenson Way, Winnipeg, MB
Developers: Unknown
Architect(s)/Engingeers: StructureCraft Builders
Construction Manager: Unknown
Status: Canceled
Description: Two, six-storey, mass timber office buildings totaling 1600,000SF located in the cultural centre of downtown Winnipeg. The design includes ground floor commercial space and lobby access, with five floors of class A office space above. Other features include interior bleacher feature, convenience stairs, roof deck, and expansive views of the downtown.
[B]
Renderings
Media: Hungry officials hoping SkipTheDishes delivers itself to Railside project at The Forks
THOMAS SCOTT MEMORIAL ORANGE HALL
Location: 216 Princess Street, Winnipeg, MB
Developer:
Architects: Northern Sky Architecture Inc.
Contractor:
Status: Canceled = Demolished
Description: This adaptive re-use project encompassed converting three existing buildings into a mixed use complex with an art gallery, commercial space and residential units. The heritage components of the building including the masonry, windows, storefronts and murals were rehabilitated and incorporated into the planning. The building was upgraded to meet the current life safety and accessibility standards.
Steinbach Credit Union
Location: 2100 McGillivray Blvd, Winnipeg, MB
Developer: Steinbach Credit Union
Architects: Raymond S.C. Wan
Contractor: Unknown
Status: Canceled
Media: Branching out; SCU plans to overhaul Linden Ridge location while remaining open for business
Renderings
Description: 45,000 square feet, $15 million new branch for SCU
Project Provencher
Location: 155-165 boulevard Provencher, Winnipeg, MB
Developer(s): Darren Desrochers and Colin Spark
Architects: Verne Reimer Architecture
Contractor:
Status: Canceled
Media: Saint-Boniface: new hope for real estate development on Provencher Boulevard
Renderings
Description: Consolidated on 5 lots (2 occupied, 3 vacant) along Blvd Provencher, an 8 storey mixed-use building with two levels of retail & 96 rental units is proposed.
SSP Project Thread
634 Portage Avenue
Location: 634 Portage Avenue, Winnipeg, MB
Developer: Private Pension Partners
Architect: Cibinel Architecture Ltd
Status: Canceled
Project Thread: 634 Portage Ave
Media: Acquisition Of 634 Portage Avenue, Winnipeg
Description: 200 unit 20 storey residential apartment tower on retail podium with 4 level above ground parkade