Winnipeg | Downtown | 185 Donald St | DSM | 14F | U/C


zalf

Member
DSM
Location: 185 Donald Street
Developer: Carrington Real Estate
Architect: MMP Architects Inc
Status: U/C
Project Thread: 185 Donald St | 14F | Mixed-use
Renderings
Media: Carrington Real Estate revives Donald-St. Mary residential tower project, taps Keg for main floor-Winnipeg Free Press
Description: DSM is a 14-storey luxury high-rise featuring 160 modern units in the heart of downtown. Ground level will be the new home of The Keg downtown and the second floor will be the head office for Carrington Real Estate.
Permits: #24-265056 MU-2025-02-28, Construct New. Child Permit for new revisions: Donald & St. Mary Mixed use Development- Construction of 15633 sq.m 15- storey, high rise mixed- use building that includes 160 residential suites, a 3- storey attached parkade, 1 raised roof patio deck. The ground floor includes restaurant space. Revision of Level 02 - 15 Suite Layouts and Revision of Masonry Exterior Cladding to EIFS Cladding (Level 04-15) as per revised drawings.

54470241571_6d675a2022_b.jpg


54470595610_804379c81b_b.jpg


3-C5-E3-AFA-5161-46-BB-8-B4-E-D6-D3-DDD5-ECD4.jpg


Previous design
 
Last edited by a moderator:
^ ha ha. That’s huge compared to what normally gets built. Has a nice big bike room right off the main lobby to have easy access in and out as well as visibility from the security desk. A bike maintenance area with tools, wash, and a stand is part of that room.
 
That crane can have an extension added to it for higher height once it caps out, to a limit of course. Or there are bigger crawlers available that can go up to 400’, they had a couple at the Keeyask hydro dam.
 
it seemed suspicious when they used a crawler for the spot at east village.. they got 'er done but not without a few glitches if we can all recall.
 
Thanks, Unbending

I noticed the other data the crawler crane had been folded up, and it looks totally absent now. I guess they're done with the parkade pre-cast
 
I noticed the other data the crawler crane had been folded up, and it looks totally absent now. I guess they're done with the parkade pre-cast

A newer, bigger crawler crane is on site, and the foundations are coming along.
 


Back
Top