Quote:
Originally Posted by Nowhere
Sorry, I was really tired and I thought you said that Gatineau planned a fully segregated LRT. I'm a bit afraid it's gonna end up like Toronto's streetcar, always stopped by car crashes. Having lived most of my life in Québec, I can't deny that reckless driving is a major problem there.
|
Going to a grade-separated system is incredibly expensive. And we’re already at $2.1 Billion for a city of 330k. Good luck to anyone who wants to argue for more. Two grade separated lines would probably push beyond $3 billion. Scope creep is a good way to get projects like this killed.
The only reason Ottawa got as much of a grade separated LRT as it did, is because there was so much grade separated BRT for them to convert. If that wasn’t there, Ottawa would have ended up with lots of street-running LRT like what’s proposed in Gatineau or being built along Eglinton in Toronto.
Quote:
Originally Posted by Nowhere
The LRT route and funding may not be finalized, but claiming that nobody beyond rail fans in this forum talked about it isn't true. The City of Gatineau and the Québec government aren't rail fans from this forum.
|
Except that they never discussed LRT through Ottawa. They only ever discussed LRT
to Ottawa. You interpreted their analysis of current corridors as a desire for LRT on Wellington. This is not correct.
Quote:
Originally Posted by Nowhere
I don't have the proportion of Rapibus ridership heading to Ottawa, but the document I linked show a PPHPD of 8500 from Hull to Ottawa in 2031. The Edmonton LRT has a PPHPD of roughly 5500 and they have a tunnel with 6 underground stations. I don't know why you refuse to believe the official forecast.
|
I have no issues with the official forecast. What I take issue with is the assertion that the majority of Rapibus riders are Ottawa bound. There’s no evidence supporting that specific assertion. I have no disputed that Ottawa will see 8500 pphpd from Gatineau in 2031.
Quote:
Originally Posted by Nowhere
I don't know where you want Gatineau LRT to end if you oppose both a tunnel and a surface route though the CBD.
|
Exactly what is proposed. Connection at Rideau and Lyon. There’s no need for STO to have its own line through Ottawa’s CBD. And nobody beyond this forum has proposed it.
Personally, I still think a conversion of Rapibus to LRT with a connection at Bayview makes more sense than the Plateau line but I’m in the minority on this debate I guess.....
Quote:
Originally Posted by Nowhere
I totally know that a 2nd tunnel won't happen anytime soon, but pipe dreams seem to be pretty much the point of this forum. An interprovincial tunnel will sure get delayed as much as possible, but it will likely become necessary at some point. If this happens, we'll have to find a way to fund it. After all. the St. Louis LRT has a tunnel linking Missouri and Illinois.
|
You are conflating two separate issues. A tunnel to Ottawa is not the same thing as a tunnel through Ottawa. Suggesting that opposition to an STO tunnel through Ottawa is the same as opposing a tunnel connecting Gatineau and Ottawa, is a strawman argument.