Quote:
Originally Posted by Metro-One
On my proposal a station could be added at Thurlow on the North side of False Creek before swinging west towards English Bay to address some of jbrizzy’s concerns, but I really feel that the west end needs true mass transit, especially given that it is often touted as one of the most dense neighborhoods in NA. Not to mention access to Stanley Park.
It is interesting how similar our proposals are. In general they are within the same line of thought.
Also I feel that Granville Island can be serviced well enough by the Vancouver Streetcar and potential access from Granville Street Bridge.
I also feel that having the North Shore crossing further west is far more beneficial for the majority of those on the North Shore.
Crossing at the Iron Workers’ Memorial is far too much backtracking to access downtown and Richmond while accessing Burnaby and east is no difference either way (save for those going from Lynn Valley area to Burnaby).
|
I agree that the Second Narrows routing would be backtracking for those west of Lonsdale heading downtown, however I might expect people in those areas to take the SeaBus or Lions Gate B-Line (for those further west) to head downtown.
That being said, by my estimate the trip from Lonsdale to Waterfront would be about the same as from Waterfront to Royal Oak, or about 21 minutes. With the current SeaBus trip time of 12 minutes, and 15-minute frequencies, the average trip including wait times is around 20 minutes (though that will be improved with the upcoming 10-minute frequencies), so about the same as a hypothetical Skytrain trip. However, anyone east of Lonsdale would see a shortened trip time to downtown.
It kind of depends on whether you see the current SeaBus crossing time as adequate, or as a barrier for people travelling between the North Shore and Downtown. I guess I'm under the impression that it is adequate, especially if a SkyTrain across the North Shore enhances peoples' access to it. I also believe a mid-inlet crossing is highly unlikely due to the topography and expected cost, so I went with the more "safe" option.
The Main-Marine B-Line shows the importance of cross-North Shore rapid transit, which this routing accomplishes. And if the Willingdon branch is constructed, it shortens travel times between the North Shore and Burnaby/Tri-Cities/SoF, as they won't have to travel all the way downtown to connect to the line.
It boils down to the question: do you want to replace the SeaBus, and make a 12-minute crossing a 4-minute crossing (or thereabouts), or would you prefer to maintain the 12-minute crossing while adding an additional crossing that draws more places into the overall network?