HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jun 10, 2019, 3:44 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,813
Quote:
Originally Posted by kmcamp View Post
Not quite the same as the Canada line. It was underbuilt with no possibility of easy expansion. The Trillium line is being designed to be eventually twinned which would add oodles of capacity, we're just being penny wise pound foolish about it by delaying that until not so long in the future
The Trillium Line will not easily be twinned north of Greenboro. It is being closed for 2.5 years just to extend passing tracks (modestly), add two stations, grade separate the VIA crossing and extend station platforms. Fulling twinning is a much more complicated project.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 10:43 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.