HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #1421  
Old Posted May 14, 2019, 5:23 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,706
Quote:
Originally Posted by topworker View Post
Thank you for the information loved this post
Welcome to the forum!
Reply With Quote
     
     
  #1422  
Old Posted Jun 9, 2019, 3:03 PM
Nowhere Nowhere is offline
Registered User
 
Join Date: May 2018
Posts: 228
Anyone else is skeptical that the Trillium line will have enough capacity ? The actual trains can hold up to 260 passengers. The new trains will roughly double the capacity. Using a 12 minutes frequency, the maximum PPHPD (passengers per hour per direction) would be 2600.

The city first forecasted a PPHPD of 4300 for the Trillium line in 2031. This was then revised to 1900 for 2048.

What made the city lower their forecast so much ? If the first one prove to be right, we will have to close the whole thing again very fast for double-tracking. The 12 minute frequency would probably have been good for the first plan that stopped at Bowesville, but I'm skeptical it can meet the demand once extended to Riverside South.

Riverside South and Leitrim together are forecasted to eventually have a population of 72 000. Am I the only one thinking the line will be underbuilt ? I'm afraid it's gonna end like the Canada Line in Vancouver, which started to run at full capacity a few years after opening because of higher than expected ridership. We have to remember that the Trillium Line ridership quickly grew to twice what was forecasted after opening.

Last edited by Nowhere; Jun 9, 2019 at 3:15 PM.
Reply With Quote
     
     
  #1423  
Old Posted Jun 9, 2019, 11:58 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by Nowhere View Post
Anyone else is skeptical that the Trillium line will have enough capacity ? The actual trains can hold up to 260 passengers. The new trains will roughly double the capacity. Using a 12 minutes frequency, the maximum PPHPD (passengers per hour per direction) would be 2600.

The city first forecasted a PPHPD of 4300 for the Trillium line in 2031. This was then revised to 1900 for 2048.

What made the city lower their forecast so much ? If the first one prove to be right, we will have to close the whole thing again very fast for double-tracking. The 12 minute frequency would probably have been good for the first plan that stopped at Bowesville, but I'm skeptical it can meet the demand once extended to Riverside South.

Riverside South and Leitrim together are forecasted to eventually have a population of 72 000. Am I the only one thinking the line will be underbuilt ? I'm afraid it's gonna end like the Canada Line in Vancouver, which started to run at full capacity a few years after opening because of higher than expected ridership. We have to remember that the Trillium Line ridership quickly grew to twice what was forecasted after opening.
Not quite the same as the Canada line. It was underbuilt with no possibility of easy expansion. The Trillium line is being designed to be eventually twinned which would add oodles of capacity, we're just being penny wise pound foolish about it by delaying that until not so long in the future
Reply With Quote
     
     
  #1424  
Old Posted Jun 10, 2019, 3:44 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,813
Quote:
Originally Posted by kmcamp View Post
Not quite the same as the Canada line. It was underbuilt with no possibility of easy expansion. The Trillium line is being designed to be eventually twinned which would add oodles of capacity, we're just being penny wise pound foolish about it by delaying that until not so long in the future
The Trillium Line will not easily be twinned north of Greenboro. It is being closed for 2.5 years just to extend passing tracks (modestly), add two stations, grade separate the VIA crossing and extend station platforms. Fulling twinning is a much more complicated project.
Reply With Quote
     
     
  #1425  
Old Posted Jun 10, 2019, 8:45 AM
GoTrans GoTrans is offline
Registered User
 
Join Date: Jan 2010
Posts: 695
Quote:
Originally Posted by lrt's friend View Post
The Trillium Line will not easily be twinned north of Greenboro. It is being closed for 2.5 years just to extend passing tracks (modestly), add two stations, grade separate the VIA crossing and extend station platforms. Fulling twinning is a much more complicated project.
The twinning from Greenboro to Dows Lake north tunnel portal is not a difficult job and the track should only need to be shut down for short periods of time but it will cost substantial amounts of money due to bridge structures and the additional tunnel.

From the tunnel's north portal to Gladstone will require significant work and shutdowns. The most significant problem other than the width of the rock cut is storm water drains entering the cut. If the storm water was diverted, then the width of the cut expansion could probably be reduced.

CN and CP somehow manage to complete many major infrastructure works without complete shut downs of their mainlines. These shutdowns to do the work is the result of the city not demanding the contractor work around rail operations in many cases. I think the extended shutdowns are really only required for the rock cut expansion. The demolition and rebuild of the Decarie and Hwy 20 interchange over the CN 4 track mainline has not required a significant shutdown of rail traffic.
Reply With Quote
     
     
  #1426  
Old Posted Jun 10, 2019, 2:43 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,813
Quote:
Originally Posted by GoTrans View Post
The twinning from Greenboro to Dows Lake north tunnel portal is not a difficult job and the track should only need to be shut down for short periods of time but it will cost substantial amounts of money due to bridge structures and the additional tunnel.

From the tunnel's north portal to Gladstone will require significant work and shutdowns. The most significant problem other than the width of the rock cut is storm water drains entering the cut. If the storm water was diverted, then the width of the cut expansion could probably be reduced.

CN and CP somehow manage to complete many major infrastructure works without complete shut downs of their mainlines. These shutdowns to do the work is the result of the city not demanding the contractor work around rail operations in many cases. I think the extended shutdowns are really only required for the rock cut expansion. The demolition and rebuild of the Decarie and Hwy 20 interchange over the CN 4 track mainline has not required a significant shutdown of rail traffic.
I have heard this many times before, yet every significant change to the Trillium Line has involved lengthy shutdowns. Considering that the corridor is constricted with many grade separations needing to be replaced, and all the other alternate rail routes have been pulled up, it will be very difficult to do what freight operators routinely do when upgrading track. Also, since freight operations tend to be long distance, some delays resulting from using relocated track or alternate routes are not as critical as with an urban passenger service, where every minute counts.

I believe the MUP trail on the east side of the Trillium Line was the original rail corridor before the Dow's Lake tunnel was built. That allowed freight service to be maintained throughout construction. Not so easy today, unless we are willing to use surface operations as we had before the mid-60s. That will never happen. South of Carleton is only slightly easier. The Rideau River bridge will have to be replaced or twinned, many road overpasses will have to replaced, stations relocated (as proposed), and sidings prepared for mainline service. This means all the signalling will have to be upgraded and the whole new service thoroughly tested. This is not going to happen with brief periodic shutdowns, unless we are prepared to pay more and for the construction period to be considerably longer.

Perhaps, anything is possible if you throw enough money at it, but an already expensive project will be done as cheaply as possible to prevent project costs from getting out of hand.
Reply With Quote
     
     
  #1427  
Old Posted Jun 11, 2019, 1:51 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Trillium and Canada have parallels, but Canada is far superior. It was under-built for the long-term, but capacity still has plenty of room to grow, from around 5,000 phpd today (more or less) to 18,000 phpd. They can easily add more trains to increase frequency now and add a slight 10 meter platform extension later on without shutting the line down. Not to mention direct airport to downtown service, not 3 trains.

Trillium will be at max capacity day 1. It will need to be shut down again for upgrades because the work needed is quite extensive.
Reply With Quote
     
     
  #1428  
Old Posted Jun 11, 2019, 2:53 PM
GoTrans GoTrans is offline
Registered User
 
Join Date: Jan 2010
Posts: 695
Quote:
Originally Posted by lrt's friend View Post
I have heard this many times before, yet every significant change to the Trillium Line has involved lengthy shutdowns. Considering that the corridor is constricted with many grade separations needing to be replaced, and all the other alternate rail routes have been pulled up, it will be very difficult to do what freight operators routinely do when upgrading track. Also, since freight operations tend to be long distance, some delays resulting from using relocated track or alternate routes are not as critical as with an urban passenger service, where every minute counts.

I believe the MUP trail on the east side of the Trillium Line was the original rail corridor before the Dow's Lake tunnel was built. That allowed freight service to be maintained throughout construction. Not so easy today, unless we are willing to use surface operations as we had before the mid-60s. That will never happen. South of Carleton is only slightly easier. The Rideau River bridge will have to be replaced or twinned, many road overpasses will have to replaced, stations relocated (as proposed), and sidings prepared for mainline service. This means all the signalling will have to be upgraded and the whole new service thoroughly tested. This is not going to happen with brief periodic shutdowns, unless we are prepared to pay more and for the construction period to be considerably longer.

Perhaps, anything is possible if you throw enough money at it, but an already expensive project will be done as cheaply as possible to prevent project costs from getting out of hand.
These projects do not all need to be done at the same time. What is required is a plan and for the city to commit to the plan. Most of the bridges are road overpasses and should not have the same impact on rail operations. What needs to be shut down is the roadway not the railway. This is why the projects need to be staged so that there are alternative road routes. Much of the construction on bridges will be required outside the existing operational rail right of way, hence there is no need for long term shut downs.

The Rideau River bridge can absolutely be constructed without a shut down as it can be built as a parallel independent bridge. The Dows Lake tunnel can also be constructed without a long term shutdown provided the portals are placed far enough apart from the existing portals. The tunnel itself can be built as and independent tunnel.

All individual bridge and tunnel work contracts would be of the size that they are probably of the size that they would attract multiple bidders on each individual job so the city should not have to pay inflated prices for the work. With respect to subgrade, track and signalling work, look at CN, They are double tracking 67 miles of track this year and yet they are not shutting down their mainline between Winnipeg and Vancouver. There is no reason why the same can not be done here. Surely the companies that have done work for CN, CN and ONR have the skills required to build while the track remains in operation. Switch and signal construction can be linked in and tested on weekends or at night to deal with the delay issues you mentioned. The main issue which would probably result in a shut down is the rock cut from the north tunnel portal to Gladstone.
Reply With Quote
     
     
  #1429  
Old Posted Jun 11, 2019, 4:48 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,813
There is a difference between double tracking on rural prairie versus doing the same in a constricted urban environment. The double tracking of the Dow's tunnel is more than just building another tunnel far enough away from the existing tunnel to not cause problems. The north portal in particular will require more blasting as we move the tunnels further apart. Is there land available to do that, especially if the Civic Hospital project goes ahead before double tracking. Do we even have a plan in place to protect the corridor from infringement. I doubt it since it is beyond the planning window.

Are there really enough companies with the expertise to bid on several different contracts that require coordination to get the job done in a reasonable time frame and without major disruption.

I understand what you are saying but the track record with the Trillium Line says that we will see years of shutdown.
Reply With Quote
     
     
  #1430  
Old Posted Jun 11, 2019, 5:28 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
North of the tunnel isn't a pinchpoint, and won't be for a long time. Between Carleton and Gladstone is one of the fastest portions of the line (85km/h) which means trains are able to get in and out fast enough to avoid causing backups.

Everything South of Carleton can be double tracked easily without shutting the line down and that's where most of the pinchpoints are. Once South Leitrim to Carleton is fully double tracked, then Carleton to Gladstone becomes a problem, but that won't be for a very long time.

The trench North of the tunnel is actually pretty wide (as I've noted before). It's around 8-9m according to Google maps, and with a realignment of the existing tracks to be closer to the trench walls you wouldn't need to blast a huge amount to get the width required for two tracks.

As for the new Hospital land, according to geoOttawa, the land plot for the rail line extends well beyond the edge of the trench.



Of course that might change when the hospital is actually built, but since a station was considered for that location anyway, I have confidence that the city will protect the land necessary to provide enough space for a second track in the future, after all it's pretty cheap to do that.

On a side note, i guess I never really thought of it like this, but they managed to install new signals without shutting the line down, so that's something. I guess they'll be taking a week to bring them into service next month, but...
Reply With Quote
     
     
  #1431  
Old Posted Jun 12, 2019, 2:08 PM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,403
Quote:
Originally Posted by OCCheetos View Post
On a side note, i guess I never really thought of it like this, but they managed to install new signals without shutting the line down, so that's something. I guess they'll be taking a week to bring them into service next month, but...
If I recall correctly, there was a weekend shutdown last fall to do some installation.
Reply With Quote
     
     
  #1432  
Old Posted Jun 12, 2019, 4:10 PM
Allandale25 Allandale25 is offline
Registered User
 
Join Date: Jul 2017
Posts: 153
Any clearing or construction shots available? Haven't seen any lately.
Reply With Quote
     
     
  #1433  
Old Posted Jun 12, 2019, 4:19 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,813
Quote:
Originally Posted by Catenary View Post
If I recall correctly, there was a weekend shutdown last fall to do some installation.
Yes, I have seen those signals in place for some time. There is a set next to Home Depot, still covered with black plastic.
Reply With Quote
     
     
  #1434  
Old Posted Jun 12, 2019, 5:09 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
Quote:
Originally Posted by Catenary View Post
If I recall correctly, there was a weekend shutdown last fall to do some installation.
I don't remember a closure specifically for signal work, but at least they kept it to a weekend.

I've seen people working on the signals during regular operating hours as well.
Reply With Quote
     
     
  #1435  
Old Posted Jun 13, 2019, 6:08 PM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,403
Quote:
Originally Posted by OCCheetos View Post
I don't remember a closure specifically for signal work, but at least they kept it to a weekend.

I've seen people working on the signals during regular operating hours as well.
The signals popped up over the Thanksgiving long weekend, after a few closures of the south connecting track for trenching and conduit installation.
Reply With Quote
     
     
  #1436  
Old Posted Jun 25, 2019, 4:19 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,683
http://forum.skyscraperpage.com/showthread.php?t=203028&page=552 #11027

I must admit that I don’t follow the Ottawa Subforum that closely, but the extension to airport is for real??
Reply With Quote
     
     
  #1437  
Old Posted Jun 25, 2019, 4:22 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by Dengler Avenue View Post
http://forum.skyscraperpage.com/showthread.php?t=203028&page=552 #11027

I must admit that I don’t follow the Ottawa Subforum that closely, but the extension to airport is for real??
Yes, but it will be a three train ride. Airport to South Keys - South Keys to Bayview - Bayview to Downtown.
Reply With Quote
     
     
  #1438  
Old Posted Jun 25, 2019, 4:24 PM
JHikka's Avatar
JHikka JHikka is offline
ハルウララ
 
Join Date: Jul 2009
Location: Toronto
Posts: 12,853
Quote:
Originally Posted by J.OT13 View Post
Yes, but it will be a three train ride. Airport to South Keys - South Keys to Bayview - Bayview to Downtown.
This is because of the airport spur right? Southbound trains not going to the airport don't require a transfer at South Keys, do they? Are Airport-bound trains not possible to be boarded at Bayview?
Reply With Quote
     
     
  #1439  
Old Posted Jun 25, 2019, 4:34 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
Quote:
Originally Posted by JHikka View Post
This is because of the airport spur right? Southbound trains not going to the airport don't require a transfer at South Keys, do they? Are Airport-bound trains not possible to be boarded at Bayview?
Trains will only run in the following ways:
Bayview <—> Limebank
South Keys <—> Airport

There won't be any interlining (except potentially during large events at the EY centre on weekends) due to limited track capacity on the main line.
Reply With Quote
     
     
  #1440  
Old Posted Jun 25, 2019, 4:36 PM
Multi-modal Multi-modal is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,154
Quote:
Originally Posted by JHikka View Post
This is because of the airport spur right? Southbound trains not going to the airport don't require a transfer at South Keys, do they? Are Airport-bound trains not possible to be boarded at Bayview?
You cannot get a train to the airport from Bayview. All Trillium Line trains from Bayview will go to Riverside South and you have to transfer to the Airport spur at South Keys.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 10:01 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.