  #2401  
Old Posted Apr 11, 2019, 12:22 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,702
Quote:
Originally Posted by roger1818 View Post
I have always agreed with you that dropping a full Stage 2 train of passengers off at Bayview is a bad idea. My argument is that over half of the train's passengers will be dropped off at Carleton, so it won't be full when it gets to Bayview. Once we get to the point where half of the passengers are continuing on passed Carleton (and thus running full again), larger trains are not going to be of much help.
There's also a large contingent of C-line passengers transferring to the T-line (especially if the federal government increases the employment node at Confederation Heights) so the flow is going to be relatively balanced.

My concern would be more on how badly Bayview is designed as a transfer station. The renderings show it as a completely unsheltered connection, and relies on using platform space for circulation — someone entering from the Trinity development wanting to access the C-line is going to have to walk the entire length of the T-line platform exposed to the elements. What's the use of a covered bridge if it just leads you out into the rain and snow to catch an east-west connection? This is just absolutely bad planning, these are brand new stations that should have been designed as a fully integrated and efficient transfer hub.

Reply With Quote
     
     
  #2402  
Old Posted Apr 26, 2019, 7:57 PM
Allandale25 Allandale25 is offline
Registered User
 
Join Date: Jul 2017
Posts: 153
Reply With Quote
     
     
  #2403  
Old Posted Apr 26, 2019, 8:01 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,130
Quote:
Originally Posted by Allandale25 View Post
Talk about desperate. Linking their private financial interests on a local rail initiative to a young climate change activist setting an example by not flying between cities.
Reply With Quote
     
     
  #2404  
Old Posted Apr 26, 2019, 8:05 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
Quote:
Originally Posted by Allandale25 View Post
They've been actively updating their news section with their appearances at various conferences, as well as cabinet overturning the PoW bridge order, and a concept for what to do with the bridge.
Reply With Quote
     
     
  #2405  
Old Posted May 1, 2019, 12:51 PM
Joseph Potvin Joseph Potvin is offline
Registered User
 
Join Date: Jun 2016
Location: Canada's National Capital Region
Posts: 210
Here's a video posted by someone (unrelated to MOOSE) documenting the 'throwing away' of an entire train in full public view. https://youtu.be/rTkh8HZE4CY The famed Wakefield Steam Train -- Chuck it all in the garbage. My colleague who sent this called it "sad". Here was my comment...

---------- Forwarded message ---------
Date: Tue, Apr 30, 2019 at 5:46 PM
Subject: Re: [Moose-p125] Sad to see

"Sad"? Not the word I'd use.

Maybe: "Revealing". A genuine learning opportunity to see what we're dealing with. I should point out this vandalized train-set is fully visible from the windows of every car driving on Hwy 5 between Gatineau and Chelsea/Wakefield. This is all happening with public transparency. Just like the Prince of Wales Bridge: willfull decay and proactive obstruction of its approach track, all in full view, and all now officially endorsed by our Minister of Transport, Minister of Environment and Climate Change, and our Minister Responsible for the National Capital Commission.

In the video, note the ongoing dismantlement of track around the 5-minute mark. Notice also the several upholstered chairs and the stainless steel kitchen racks all junked. This is not "sad". It's tax time after all! It doesn't make me "sad" that my various levels of government tax me to wreck stuff. More than anything it makes me even more curious. I do wonder how "they" see it in their own heads.
Reply With Quote
     
     
  #2406  
Old Posted May 1, 2019, 1:39 PM
Gat-Train Gat-Train is offline
BANNED
 
Join Date: Nov 2018
Posts: 508
It is sad that this vintage trainset is being abandoned, but IMO, it probably belongs in a museum. I imagine that it costs a lot of money to maintain a very old train, especially seeing as how replacement parts would be quite scarce, and due to these high maintenance costs, they couldn't find a buyer.
Reply With Quote
     
     
  #2407  
Old Posted May 1, 2019, 8:08 PM
Joseph Potvin Joseph Potvin is offline
Registered User
 
Join Date: Jun 2016
Location: Canada's National Capital Region
Posts: 210
Quote:
Originally Posted by Gat-Train View Post
It is sad that this vintage trainset is being abandoned, but IMO, it probably belongs in a museum. I imagine that it costs a lot of money to maintain a very old train, especially seeing as how replacement parts would be quite scarce, and due to these high maintenance costs, they couldn't find a buyer.
Thinking just a wee bit harder results in: [1] [2] [3]

The third one is a railway station. If Moose hadn't been delayed fighting the railway wreckers, we'd have picked them up as "start-up stations"... They'd have been nicer than the refitted shipping containers of our primary plan. Similarly, the STO or Transcollines could have refitted them to be comfortable bus stations -- with washrooms even! Not even Ottawa's new LRT stations will have that! How about as stations for Gatineau's hoped-for LRT?

Nope. To the garbage they go.

Joseph Potvin
Director General | Directeur général
Moose Consortium (Mobility Ottawa-Outaouais: Systems & Enterprises) | www.letsgomoose.com
Consortium Moose (Mobilité Outaouais-Ottawa: Systèmes & Enterprises) | www.onyvamoose.com

Last edited by Joseph Potvin; May 2, 2019 at 10:51 PM.
Reply With Quote
     
     
  #2408  
Old Posted Jun 3, 2019, 1:57 PM
Joseph Potvin Joseph Potvin is offline
Registered User
 
Join Date: Jun 2016
Location: Canada's National Capital Region
Posts: 210
Reply With Quote
     
     
  #2409  
Old Posted Jun 3, 2019, 2:20 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,130
What's sad is the waste of tax dollars fighting MOOSE's regulatory trolling of the city.

If anybody really feels that bad about the loss of heritage of one old steam train, let them up the money to get it restored and installed somewhere.
Reply With Quote
     
     
  #2410  
Old Posted Jun 3, 2019, 3:35 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by Truenorth00 View Post
What's sad is the waste of tax dollars fighting MOOSE's regulatory trolling of the city.

If anybody really feels that bad about the loss of heritage of one old steam train, let them up the money to get it restored and installed somewhere.
Poor Day.

Yep... talk about a severely burnt and blackened pot calling a slightly tarnished copper kettle black.

Sorry Mr. P. ....... I have willfully restrained myself from commenting about mOOse until now, but you just crossed the line.

NoJoy!
Reply With Quote
     
     
  #2411  
Old Posted Jun 4, 2019, 12:11 AM
Charles5 Charles5 is offline
Registered User
 
Join Date: Aug 2017
Posts: 238
Quote:
Originally Posted by Joseph Potvin View Post
Clearly, rail doesn't work.
14 Sep 2011: But Potvin said if the municipalities all get on board, the first trains could be running by the winter of 2012.

23 April 2013: Our target start-up date for the Moose Consortium’s whole-region private-sector railway service is Friday 29 July, 2016, which we concede is ambitious, and yet is realistic from both technical and investment perspectives.

6 October 2015: their ambitious plan to develop and operate a 400 km private-sector interprovincial passenger railway throughout the Greater National Capital Region in time for Canada’s Sesquicentennial in 2017.

July 12, 2016: Potvin said Smiths Falls could see trains running as early as 2018

December 8, 2018: “the leader of a private business seeking to set up an interprovincial commuter rail system in Eastern Ontario and Western Quebec says he can have trains running by 2020

Last edited by Charles5; Jun 4, 2019 at 12:38 AM.
Reply With Quote
     
     
  #2412  
Old Posted Jun 4, 2019, 5:08 AM
Allandale25 Allandale25 is offline
Registered User
 
Join Date: Jul 2017
Posts: 153
Quote:
Originally Posted by Charles5 View Post
14 Sep 2011: But Potvin said if the municipalities all get on board, the first trains could be running by the winter of 2012.

23 April 2013: Our target start-up date for the Moose Consortium’s whole-region private-sector railway service is Friday 29 July, 2016, which we concede is ambitious, and yet is realistic from both technical and investment perspectives.

6 October 2015: their ambitious plan to develop and operate a 400 km private-sector interprovincial passenger railway throughout the Greater National Capital Region in time for Canada’s Sesquicentennial in 2017.

July 12, 2016: Potvin said Smiths Falls could see trains running as early as 2018

December 8, 2018: “the leader of a private business seeking to set up an interprovincial commuter rail system in Eastern Ontario and Western Quebec says he can have trains running by 2020
Good chronology.
Reply With Quote
     
     
  #2413  
Old Posted Jun 4, 2019, 6:28 PM
Joseph Potvin Joseph Potvin is offline
Registered User
 
Join Date: Jun 2016
Location: Canada's National Capital Region
Posts: 210
Quote:
Originally Posted by Charles5 View Post
14 Sep 2011: But Potvin said if the municipalities all get on board ... December 8, 2018: “the leader of a private business seeking to set up an interprovincial commuter rail system in Eastern Ontario and Western Quebec says he can have trains running by 2020
Exactly.

@Charles5, Have you got a few minutes to list a chronology of core NCR railway infrastructure that has been destroyed during the period that the companies involved in MOOSE have been working towards developing a passenger rail service for this region?

We're transparent in saying that we really didn't expect the public sector of the NCR to be so hell-bent on wrecking its own regional railways. There are clearly some smarter people on this discussion forum who "get it".

Business logic itself, metaphorically 'baseball', doesn't work when the owner digs up the field, cheered on by some (not all) of the commentators here.

Joseph Potvin
Director General | Directeur général
Moose Consortium (Mobility Ottawa-Outaouais: Systems & Enterprises) | www.letsgomoose.com
Consortium Moose (Mobilité Outaouais-Ottawa: Systèmes & Enterprises) | www.onyvamoose.com
Reply With Quote
     
     
  #2414  
Old Posted Jun 4, 2019, 9:13 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by Joseph Potvin View Post
Exactly.

@Charles5, Have you got a few minutes to list a chronology of core NCR railway infrastructure that has been destroyed during the period that the companies involved in MOOSE have been working towards developing a passenger rail service for this region?

We're transparent in saying that we really didn't expect the public sector of the NCR to be so hell-bent on wrecking its own regional railways. There are clearly some smarter people on this discussion forum who "get it".

Business logic itself, metaphorically 'baseball', doesn't work when the owner digs up the field, cheered on by some (not all) of the commentators here.

Joseph Potvin
Director General | Directeur général
Moose Consortium (Mobility Ottawa-Outaouais: Systems & Enterprises) | www.letsgomoose.com
Consortium Moose (Mobilité Outaouais-Ottawa: Systèmes & Enterprises) | www.onyvamoose.com

Belay that.

Most of the infrastructure is in private hands.

Walkley yard and a whole subdivision have been put on the market by CN/CP.
I am certain that Nylene and Capitol Railways are negotiating on it, given both their existing interests in the properties.

Are You ? Oh, Yeah, Right..... confidential, concerning discussions in progress.

Other infrastructure has been discontinued and -destroyed- after a proper notification and process.
Where were you in offering to purchase for what should have been a song for at least the RoW let alone the rail. I see nothing.

Nope.
Reply With Quote
     
     
  #2415  
Old Posted Jun 4, 2019, 10:38 PM
Joseph Potvin Joseph Potvin is offline
Registered User
 
Join Date: Jun 2016
Location: Canada's National Capital Region
Posts: 210
Quote:
Originally Posted by PHrenetic View Post
Are You ? Oh, Yeah, Right..... confidential, concerning discussions in progress.
Who are you paraphrasing? MOOSE puts practically everything online.

Quote:
Originally Posted by PHrenetic View Post
Other infrastructure has been discontinued and -destroyed- after a proper notification and process.
Oh? Are you referring to the illegal dismantlement and obstruction at Bayview? And the dismantlement of the track through Chelsea without any open public process (besides discussion of how to get rid of the track)? Do you refer to the reduction of the track through Gatineau from double to single without consultation? When you find any record of the notifications for those, please do post them, as we post all sorts of documents. The Beachburg sub was different; it was torn out despite strong protests by the several local muicipalities -- however MOOSE didn't oppose that one because all the rules were followed by CN. However we did communicate our view that it seemed unwise and inconsistent with the mandates of the regional government and Quebec governments, and the feds via the NCC, to not to spend the $25M required to take over that corridor from CN.

Quote:
Originally Posted by PHrenetic View Post
Where were you in offering to purchase for what should have been a song for at least the RoW let alone the rail. I see nothing.
Well on that one just mentioned, just for one example, we negotiated a signed agreement with the Municipality of Bristol which was approved unanimously by their council, and even worked out with them where their station would go. But the forces opposed to NCR transit integration are quite impressive. It's just a wee bit hard to have investors plunk down $25M when the opposition to railway integration of the region is so phrenetic!

Joseph Potvin
Director General | Directeur général
Moose Consortium (Mobility Ottawa-Outaouais: Systems & Enterprises) | www.letsgomoose.com
Consortium Moose (Mobilité Outaouais-Ottawa: Systèmes & Enterprises) | www.onyvamoose.com
Reply With Quote
     
     
  #2416  
Old Posted Jun 4, 2019, 11:18 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,118
Quote:
Originally Posted by Joseph Potvin View Post
Well on that one just mentioned, just for one example, we negotiated a signed agreement with the Municipality of Bristol which was approved unanimously by their council, and even worked out with them where their station would go. But the forces opposed to NCR transit integration are quite impressive. It's just a wee bit hard to have investors plunk down $25M when the opposition to railway integration of the region is so phrenetic!
When was that?
And if it wasn't recently, why is this the first we're hearing of it?
Reply With Quote
     
     
  #2417  
Old Posted Jun 5, 2019, 12:05 AM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,930
Getting from Bristol to central Ottawa does not require the PoW bridge or any of the infrastructure Mr. Potvin has been complaining about. Would have been a good place to demonstrate the proof of concept.
Reply With Quote
     
     
  #2418  
Old Posted Jun 5, 2019, 12:41 AM
Joseph Potvin Joseph Potvin is offline
Registered User
 
Join Date: Jun 2016
Location: Canada's National Capital Region
Posts: 210
Quote:
Originally Posted by OCCheetos View Post
When was that? And if it wasn't recently, why is this the first we're hearing of it?
It was in 2011. Here is the copy of their motion from the municipal website (scroll down to pages 9-11).

Why didn't you hear about it? Maybe (a) 2011 is before you were paying attention; (b) your local media declined to address the media advisory that went out; (c) most people in Ottawa don't know where Bristol is anyways because it's on the other side of their perceptual moat.

FWIW, MOOSE has been in communication with 16 muncipalities throughout the region. Each has its own story. Interestingly, some of the strongest background support for our plan comes from inside OC-Transpo and other City of Ottawa service domains (e.g. public health), but political forces being what they are, such support is suppressed. An example I can speak of, the president of our co-founding engineering firm REMISZ was, for 8 years, a structural project manager for the City of Ottawa.

Joseph Potvin
Director General | Directeur général
Moose Consortium (Mobility Ottawa-Outaouais: Systems & Enterprises) | www.letsgomoose.com
Consortium Moose (Mobilité Outaouais-Ottawa: Systèmes & Enterprises) | www.onyvamoose.com
Reply With Quote
     
     
  #2419  
Old Posted Jun 5, 2019, 4:19 AM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Mr.P.

Washrooms - Phase 1 will have more that you falsely represent - Tuney's, Bayview, Hurdman, Blair. Phase 2 will have more, including LincolnFields, Moodie, Trim. Plus most access in the partner facilities and buildings accessed.

Moose posts online - yep, there we are - no answer, just a side-track, on an answer/out that I blatantly handed you, and you missed it. I repeat - Walkley - where are you ?

Bayview - knew you'd get here. Illegal ? Never tested in court, with most opinion saying you'd lose. CTA had to uphold the absolute letter, but expected it to be appealed, or overridden. Cabinet in right of the Crown overrode it, for the public good. Plus City always stated and documented for future plans and use - by the owner. No timeline under CTA is required - a part of City's appeal. Plus CN/CP have ceded interest in that trackage, by applying to abandon / release interest in any operations in this area. Thus the requirement for accommodating any operations other than the City's virtually disappears, and City can proceed to reduce the importance of providing for alternate operations by reason of no presently viable request or plan in the offing. Done.

Beachburg - several municipalities proposed getting together to propose a low-volume regional commuter service, if a viable partner came forward. Where were you ? There was indeed a small noise from you, but no viable input nor proposal. It died.
You did not oppose ? Yeah - no viable basis for complaint or objection, no viable plan on the horizon let alone the table. Done.

Bristol - yup, seen it, saw it. A good try at protecting and future-proofing for an opportunity to develop a low-volume commuter rail service, as above. But - the same long-term no-show of a viable plan or offer. now eight years later, for them, and still no-show. That is a long time for a municipal council to hold out a faint hope for a plan or offer, to hang on in the face of local residents and businesses asking why,what,when. The motion probably still stands on their record books, but it is now probably (to be polite) noted as "inactive". Done.

Investors - yes, indeed, angels to put up $25 mil at a pop, pop, pop. How many pops ?
Where are they, after they see the books, the plans, and the probabilities ? Still behind-the-scenes private not-for-present-attribution to keep their backers safe ? (Hint - I'm giving you another out here.)

Opposition - Of course there is opposition. You are proposing to make use of infrastructure of the public good for private gain. And that is indeed the nature of RailWays - publicly stated and supported. But that phrase also carries responsibilities - the public good. Opposition is based therein - opponents do not see your public good in sufficient quality or quantity for the required investment, an investment phrased in either your market-driven model or the public investment model.
Now - opposition from within - within the City, OC-T, Public Health (what - public health ? - sorry, can't see that one). Hello - Public Servants can offer advice, information, and support to a certain extent as part and parcel of their jobs, equally and equitably, to all comers, not just you, to aid in development of ideas to viability.
But - and it's a big BUT, the nature of Public Service is to the Public, not to developers (despite some laxness in these quarters), entrepreneurs, and other private interests. Public Service is -Public- service, supplied by Public Servants, to the Public. Any and All public servants knows this and honours it (or should), in thought and deed, no matter the political master of the time or moment, or the private pressure to perform otherwise. This is Idealistic ? Damn right it is. And it is what most Public Servants are made of, and honour, despite being ground down by disrespect and mis-representation of their work.

So. Stop picking and providing strawmen objections and diversions to straight questions, and a paranoid interpretation and apprehension of conspiracies of opposition when there is none.
Instead, give a real proposal, with backers, and financiers, and plans, to get going. Or Not.

P.S. - love your misguided attempt at the misinterpretation or misapplication of Frenetic (def: frantic, frenzied, fanatic) as an attempt to get my attention. My attention has already long been here, and wilfully restrained until you crossed the line. Instead - focus on the diametric opposite, which my name is intended to point to (or do you just not get it ?) : reasoned, rational, methodical, balanced.
As an attempted dig at my, and other, presentations, reason, and debate, by those who have a problem with your seeming flawed and diversion-filled 'logic' and non-answers.....missed again.
Reply With Quote
     
     
  #2420  
Old Posted Jun 5, 2019, 9:49 AM
OtrainUser OtrainUser is offline
Registered User
 
Join Date: Jul 2017
Posts: 619
Quote:
Originally Posted by PHrenetic View Post
Mr.P.

Washrooms - Phase 1 will have more that you falsely represent - Tuney's, Bayview, Hurdman, Blair. Phase 2 will have more, including LincolnFields, Moodie, Trim. Plus most access in the partner facilities and buildings accessed.

Moose posts online - yep, there we are - no answer, just a side-track, on an answer/out that I blatantly handed you, and you missed it. I repeat - Walkley - where are you ?

Bayview - knew you'd get here. Illegal ? Never tested in court, with most opinion saying you'd lose. CTA had to uphold the absolute letter, but expected it to be appealed, or overridden. Cabinet in right of the Crown overrode it, for the public good. Plus City always stated and documented for future plans and use - by the owner. No timeline under CTA is required - a part of City's appeal. Plus CN/CP have ceded interest in that trackage, by applying to abandon / release interest in any operations in this area. Thus the requirement for accommodating any operations other than the City's virtually disappears, and City can proceed to reduce the importance of providing for alternate operations by reason of no presently viable request or plan in the offing. Done.

Beachburg - several municipalities proposed getting together to propose a low-volume regional commuter service, if a viable partner came forward. Where were you ? There was indeed a small noise from you, but no viable input nor proposal. It died.
You did not oppose ? Yeah - no viable basis for complaint or objection, no viable plan on the horizon let alone the table. Done.

Bristol - yup, seen it, saw it. A good try at protecting and future-proofing for an opportunity to develop a low-volume commuter rail service, as above. But - the same long-term no-show of a viable plan or offer. now eight years later, for them, and still no-show. That is a long time for a municipal council to hold out a faint hope for a plan or offer, to hang on in the face of local residents and businesses asking why,what,when. The motion probably still stands on their record books, but it is now probably (to be polite) noted as "inactive". Done.

Investors - yes, indeed, angels to put up $25 mil at a pop, pop, pop. How many pops ?
Where are they, after they see the books, the plans, and the probabilities ? Still behind-the-scenes private not-for-present-attribution to keep their backers safe ? (Hint - I'm giving you another out here.)

Opposition - Of course there is opposition. You are proposing to make use of infrastructure of the public good for private gain. And that is indeed the nature of RailWays - publicly stated and supported. But that phrase also carries responsibilities - the public good. Opposition is based therein - opponents do not see your public good in sufficient quality or quantity for the required investment, an investment phrased in either your market-driven model or the public investment model.
Now - opposition from within - within the City, OC-T, Public Health (what - public health ? - sorry, can't see that one). Hello - Public Servants can offer advice, information, and support to a certain extent as part and parcel of their jobs, equally and equitably, to all comers, not just you, to aid in development of ideas to viability.
But - and it's a big BUT, the nature of Public Service is to the Public, not to developers (despite some laxness in these quarters), entrepreneurs, and other private interests. Public Service is -Public- service, supplied by Public Servants, to the Public. Any and All public servants knows this and honours it (or should), in thought and deed, no matter the political master of the time or moment, or the private pressure to perform otherwise. This is Idealistic ? Damn right it is. And it is what most Public Servants are made of, and honour, despite being ground down by disrespect and mis-representation of their work.

So. Stop picking and providing strawmen objections and diversions to straight questions, and a paranoid interpretation and apprehension of conspiracies of opposition when there is none.
Instead, give a real proposal, with backers, and financiers, and plans, to get going. Or Not.

P.S. - love your misguided attempt at the misinterpretation or misapplication of Frenetic (def: frantic, frenzied, fanatic) as an attempt to get my attention. My attention has already long been here, and wilfully restrained until you crossed the line. Instead - focus on the diametric opposite, which my name is intended to point to (or do you just not get it ?) : reasoned, rational, methodical, balanced.
As an attempted dig at my, and other, presentations, reason, and debate, by those who have a problem with your seeming flawed and diversion-filled 'logic' and non-answers.....missed again.
Well said
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 7:47 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.