HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley


Reply

 
Thread Tools Display Modes
     
     
  #3621  
Old Posted May 30, 2019, 2:55 AM
retro_orange retro_orange is offline
retro_orange
 
Join Date: Sep 2014
Location: East Van
Posts: 2,029
Quote:
Originally Posted by NetMapel View Post
For me personally, it is making me think that this skytrain sky bridge will be opening up sooner rather than later, hopefully along with some retail components as well. Maybe sooner than I expected like in weeks? That's exciting for me as a user of this station



Now completely covered up... how long is the usual turn around time for a new Starbucks after it has been boarded?

Their renovations are usually done within a month and this doesn't require any demolition or reconfiguring, just fitting out a new space. Likely in the summer before school starts it will be done, I'd say July sometime.
Reply With Quote
     
     
  #3622  
Old Posted May 30, 2019, 9:21 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,568
Quote:
Originally Posted by dreambrother808 View Post
Reserve Stores and Reserve Bars are 2 different things.
Got it, thanks!

Quote:
Originally Posted by NetMapel View Post
For me personally, it is making me think that this skytrain sky bridge will be opening up sooner rather than later, hopefully along with some retail components as well.
Agreed.

Shape is probably wanting to open up the corridors (without stores yet) just to get customers from the SkyTrain to the older part of he mall.
Reply With Quote
     
     
  #3623  
Old Posted May 30, 2019, 9:47 AM
GeeCee's Avatar
GeeCee GeeCee is offline
Registered User
 
Join Date: Jan 2009
Location: Port Coquitlam, BC
Posts: 2,816
Kind of feels like the sign should read "coming eventually" at this point..
Reply With Quote
     
     
  #3624  
Old Posted May 30, 2019, 11:30 AM
Spr0ckets Spr0ckets is offline
Registered User
 
Join Date: Oct 2015
Posts: 1,958
To-May-toe
To-Mah-tow

"Soon",...."Eventually",..
....probably less of a mouthful and less granular than...

"Coming at some high probability point in the quantum timeline".

Smaller banner and lower printing costs too.
Reply With Quote
     
     
  #3625  
Old Posted May 31, 2019, 1:08 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,568
Sporting Life job ads say "Opening Fall 2019".

https://www.google.ca/search?source=hp&e...Mxvi0G2lZc7YtUxeAAAAAA%3D%3D&htivrt=jobs

Couldn't find any other Brentwood job ads other than the Starbucks - no opening date specified.
Reply With Quote
     
     
  #3626  
Old Posted Jun 1, 2019, 9:28 PM
GilmoreStation GilmoreStation is offline
BANNED
 
Join Date: Apr 2016
Location: Burnaby
Posts: 465
Should have separated the info session for tower one and tower two owners


Video Link
Reply With Quote
     
     
  #3627  
Old Posted Jun 2, 2019, 12:33 AM
Tangeray Tangeray is offline
Registered User
 
Join Date: Sep 2017
Posts: 175
Bit of a waste of time that info session was...lined up 35mins just to get marketed to, with no real definite timelines on possession.

Had a talk with a rep from Shape's retail leasing division and the scoop I got is not the greatest news for us eager beavers waiting for the mall to open:

Good news is Starbucks and the plaza set to open by September, meaning the public will be able to walk through it and access the pedestrian bridge by then.
Bad news is all of the large anchors are gonna be roughly 9-12 month buildout, meaning we're looking at April-May 2020 for most of the good stuff to be open (Ciniplex VIP, Rec Room, Sporting Life etc). Some of those guys are already in there doing prelim work to their respective spaces.

I also inquired further about the Starbucks and she said it's going to be a "specialty" store with alot of outdoor patio space, but she didn't specifically say reserve, so I'm not sure what she meant by that.
Reply With Quote
     
     
  #3628  
Old Posted Jun 2, 2019, 12:46 AM
jamieson jamieson is offline
Registered User
 
Join Date: Jan 2017
Posts: 135
Quote:
Originally Posted by Tangeray View Post
Bit of a waste of time that info session was...lined up 35mins just to get marketed to, with no real definite timelines on possession.

Had a talk with a rep from Shape's retail leasing division and the scoop I got is not the greatest news for us eager beavers waiting for the mall to open:

Good news is Starbucks and the plaza set to open by September, meaning the public will be able to walk through it and access the pedestrian bridge by then.
Bad news is all of the large anchors are gonna be roughly 9-12 month buildout, meaning we're looking at April-May 2020 for most of the good stuff to be open (Ciniplex VIP, Rec Room, Sporting Life etc). Some of those guys are already in there doing prelim work to their respective spaces.

I also inquired further about the Starbucks and she said it's going to be a "specialty" store with alot of outdoor patio space, but she didn't specifically say reserve, so I'm not sure what she meant by that.
What did they try to market?

Also kind of a given that it wouldn't be open for at least another year. The interiors are still concrete and the exterior is not even finished yet. I suspect everyone in T1 will be moved in by December 2019.
Reply With Quote
     
     
  #3629  
Old Posted Jun 2, 2019, 2:39 AM
VarBreStr18 VarBreStr18 is offline
Registered User
 
Join Date: Nov 2014
Posts: 750
Quote:
Originally Posted by Tangeray View Post
Bit of a waste of time that info session was...lined up 35mins just to get marketed to, with no real definite timelines on possession.

Had a talk with a rep from Shape's retail leasing division and the scoop I got is not the greatest news for us eager beavers waiting for the mall to open:

Good news is Starbucks and the plaza set to open by September, meaning the public will be able to walk through it and access the pedestrian bridge by then.
Bad news is all of the large anchors are gonna be roughly 9-12 month buildout, meaning we're looking at April-May 2020 for most of the good stuff to be open (Ciniplex VIP, Rec Room, Sporting Life etc). Some of those guys are already in there doing prelim work to their respective spaces.

I also inquired further about the Starbucks and she said it's going to be a "specialty" store with alot of outdoor patio space, but she didn't specifically say reserve, so I'm not sure what she meant by that.
Not surprising at all, didn't it take 8+ months for Whole Food to open even as T1 at SOLO was occupied?
Reply With Quote
     
     
  #3630  
Old Posted Jun 2, 2019, 2:47 AM
Tangeray Tangeray is offline
Registered User
 
Join Date: Sep 2017
Posts: 175
Quote:
Originally Posted by jamieson View Post
What did they try to market?
Lawyers for closing, mortgage brokers, property managers etc.
Reply With Quote
     
     
  #3631  
Old Posted Jun 2, 2019, 2:56 AM
osirisboy's Avatar
osirisboy osirisboy is online now
Registered User
 
Join Date: Mar 2006
Location: Vancouver BC
Posts: 6,429
Quote:
Originally Posted by Tangeray View Post
Lawyers for closing, mortgage brokers, property managers etc.
That would actually be really helpful.
Reply With Quote
     
     
  #3632  
Old Posted Jun 3, 2019, 3:23 AM
Kevindemi Kevindemi is offline
Registered User
 
Join Date: Dec 2018
Posts: 37
Info session

Quote:
Originally Posted by osirisboy View Post
That would actually be really helpful.
Walkthroughs are going to start in june but it is getting the occupancy permits that will take move ins to late summer.

It is out of the developer's hands once constrcution is complete apparently. How fast the government works is the biggest variable.

The big indicator for consteuction completion will be the tower 1 lobby. Good news is that towerr 1 people dont have to wait for the completion of tower 2 and the mall, just some of the commercial space closest to the tower.

Was told rent estimate for one bed, at least 40th floor is around 2200$.

Grand opening for first mall phase is may 2020. The old mall will be renovated after. Dunno when though.

Was better than the first session last year -- More reps from different pieces of the puzzle. I thought it was informative, just poorly planned having all of tower 1 and tower 2 ppl invited.
Reply With Quote
     
     
  #3633  
Old Posted Jun 3, 2019, 4:38 AM
EddieVH EddieVH is offline
Registered User
 
Join Date: Dec 2015
Posts: 84
.

Last edited by EddieVH; Oct 26, 2019 at 11:25 PM.
Reply With Quote
     
     
  #3634  
Old Posted Jun 3, 2019, 6:39 AM
Kevindemi Kevindemi is offline
Registered User
 
Join Date: Dec 2018
Posts: 37
Spoke with Howard Lok and Megan So. What you said aligns.
Construction team hands over to customer care. Cx care does walkthroughs on their own. Then they book homeowners for their walk throughs. Meanwhile they beg the burnany bureaucrats to get occupancy permits done asap so we are not anymore beyond the Dec 2017 target that is now such a distant memory.
Reply With Quote
     
     
  #3635  
Old Posted Jun 3, 2019, 5:25 PM
cairnstone cairnstone is offline
Registered User
 
Join Date: Jan 2010
Posts: 1,026
Quote:
Originally Posted by Kevindemi View Post
Spoke with Howard Lok and Megan So. What you said aligns.
Construction team hands over to customer care. Cx care does walkthroughs on their own. Then they book homeowners for their walk throughs. Meanwhile they beg the burnany bureaucrats to get occupancy permits done asap so we are not anymore beyond the Dec 2017 target that is now such a distant memory.
OP really has nothing to do with the city. The Developer and Construction Management team needs to get all there ducks in the row. Schedules and sign offs from all the consultants. All life safety verified and commissioned. No active construction and protection of public from future works. After this the city, fire department do walk throughs. And will issue OP or give a list of Defects to the developer. Depending on the building OP can happen prior to unit deficiency being done.
Reply With Quote
     
     
  #3636  
Old Posted Jun 3, 2019, 10:55 PM
Andros Andros is offline
Registered User
 
Join Date: Dec 2016
Posts: 76
Fountain is now Operational !


So is the rest of the Water Features.


Pic taken by me just now.
Reply With Quote
     
     
  #3637  
Old Posted Jun 3, 2019, 11:30 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,568
Nice shot, thanks!

************

So if the major anchors won't be opening til 2020, then the small stores/restaurants are probably timing their openings to coincide so they don't have a long quiet lead-up without the traffic the anchors will generate.
Reply With Quote
     
     
  #3638  
Old Posted Jun 4, 2019, 3:09 AM
NetMapel's Avatar
NetMapel NetMapel is offline
Hello World
 
Join Date: Jul 2008
Posts: 1,580
Reply With Quote
     
     
  #3639  
Old Posted Jun 4, 2019, 7:33 AM
GeeCee's Avatar
GeeCee GeeCee is offline
Registered User
 
Join Date: Jan 2009
Location: Port Coquitlam, BC
Posts: 2,816
!!!

Thanks for the picture and the video.
Reply With Quote
     
     
  #3640  
Old Posted Jun 4, 2019, 7:27 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,568
Nice!
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley
Forum Jump



Forum Jump


All times are GMT. The time now is 3:10 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.