HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Closed Thread

 
Thread Tools Display Modes
     
     
  #10341  
Old Posted Apr 25, 2019, 7:38 PM
Badyouken's Avatar
Badyouken Badyouken is offline
Registered User
 
Join Date: Feb 2016
Posts: 239
It's rush hour right now and they're running singles, so highly doubt they're doing the formal 12-day test.

When is the next FEDCO meeting again?
     
     
  #10342  
Old Posted Apr 25, 2019, 7:40 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,799
Quote:
Originally Posted by Badyouken View Post
It's rush hour right now and they're running singles, so highly doubt they're doing the formal 12-day test.

When is the next FEDCO meeting again?
May 7th.
     
     
  #10343  
Old Posted Apr 25, 2019, 8:19 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by bradnixon View Post
May 7th.

I imagine all this current testing has been dry run stuff ahead of the full test. Considering they would have to start the clock over if anything goes wrong, they won't start it until they are 99.9% sure they can pass it in one shot. It definitely seems like it's imminent though
     
     
  #10344  
Old Posted Apr 25, 2019, 10:29 PM
TheMatth69 TheMatth69 is offline
Registered User
 
Join Date: Apr 2019
Posts: 158
Good day !
I bring great news on this lovely afternoon. They changed the chime, from last time I heard it (1 month ago). However it's not the one from the Ready4Rail videos. I managed to take a footage but you barely hear it as there's a lot of echo-noise inside the Lees trench.
In sounds like this : [Ti-du-doom] or [Ti-dou-doume] if you're french.

Last edited by TheMatth69; Apr 25, 2019 at 10:46 PM.
     
     
  #10345  
Old Posted Apr 25, 2019, 10:32 PM
Gat-Train Gat-Train is offline
BANNED
 
Join Date: Nov 2018
Posts: 508
According to the latest construction update:

Quote:
Significant progress continues to be made and crews are now starting to focus on the operational running of the Confederation Line as well as testing and commissioning.
All 34 trains have completed the DPICO tests and the remaining tests will focus on Operational Scenario testing where the teams will simulate running a scheduled train service.
There is ongoing testing of coupled trains on the alignment. Commissioning of communications systems at the Transit Operation Control Centre (TOCC) is ongoing
OCTranspo is now testing the launching of trains on the guideway, similar to the activities that what will occur in revenue service.
OC Transpo’s Electric Rail Operator training is ongoing.
Weekend operations are now a regular occurrence as part of the simulated operational testing.
So yeah, I'd say that 12-day testing is imminent, prolly will start in 2-3 weeks.
     
     
  #10346  
Old Posted Apr 26, 2019, 10:43 AM
Acajack's Avatar
Acajack Acajack is offline
Gros Méchant Loup
 
Join Date: Aug 2006
Location: Province 2, Canadian Empire
Posts: 72,949
STO just said that they won't be switching over to their new service in downtown Ottawa until next year probably.

Opening of the C-line remains uncertain and Albert-Slater is not ready yet.

So the status quo for now.
__________________
Loin des yeux, loin du coeur.
     
     
  #10347  
Old Posted Apr 26, 2019, 11:58 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,757
Quote:
Originally Posted by TheMatth69 View Post
Good day !
I bring great news on this lovely afternoon. They changed the chime, from last time I heard it (1 month ago). However it's not the one from the Ready4Rail videos. I managed to take a footage but you barely hear it as there's a lot of echo-noise inside the Lees trench.
In sounds like this : [Ti-du-doom] or [Ti-dou-doume] if you're french.
Based on your "Ti-du-doom", I'm hearing a slightly more high pitched version of Montreal's in my head. Is that accurate?
     
     
  #10348  
Old Posted Apr 26, 2019, 12:14 PM
Badyouken's Avatar
Badyouken Badyouken is offline
Registered User
 
Join Date: Feb 2016
Posts: 239
Quote:
Originally Posted by TheMatth69 View Post
Good day !
I bring great news on this lovely afternoon. They changed the chime, from last time I heard it (1 month ago). However it's not the one from the Ready4Rail videos. I managed to take a footage but you barely hear it as there's a lot of echo-noise inside the Lees trench.
In sounds like this : [Ti-du-doom] or [Ti-dou-doume] if you're french.
That's great! High pitched to low, or low to high?
     
     
  #10349  
Old Posted Apr 26, 2019, 5:17 PM
TheMatth69 TheMatth69 is offline
Registered User
 
Join Date: Apr 2019
Posts: 158
Quote:
Originally Posted by J.OT13 View Post
Based on your "Ti-du-doom", I'm hearing a slightly more high pitched version of Montreal's in my head. Is that accurate?
No no at all ! It's medium/High pitched and pretty fast ... I would say about 1sec and a half long.
The instrument synthetised in most likely a Xylophone !!!
     
     
  #10350  
Old Posted Apr 26, 2019, 5:18 PM
TheMatth69 TheMatth69 is offline
Registered User
 
Join Date: Apr 2019
Posts: 158
Quote:
Originally Posted by Badyouken View Post
That's great! High pitched to low, or low to high?

Hight to low !
     
     
  #10351  
Old Posted Apr 26, 2019, 5:31 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,757
Quote:
Originally Posted by TheMatth69 View Post
No no at all ! It's medium/High pitched and pretty fast ... I would say about 1sec and a half long.
The instrument synthetised in most likely a Xylophone !!!
Vancouver Skytrain, but faster? This is like a fun game!!

Video Link
     
     
  #10352  
Old Posted Apr 26, 2019, 5:38 PM
Badyouken's Avatar
Badyouken Badyouken is offline
Registered User
 
Join Date: Feb 2016
Posts: 239
Sounds like it's the opposite of the Vancouver system, high pitch to low pitch.

Good lord we're nerds.
     
     
  #10353  
Old Posted Apr 26, 2019, 5:47 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,757
Quote:
Originally Posted by Badyouken View Post
Sounds like it's the opposite of the Vancouver system, high pitch to low pitch.

Good lord we're nerds.
Right! Maybe more like a short TTC then.

Yup, we are true transit nerds!!
     
     
  #10354  
Old Posted Apr 27, 2019, 8:08 PM
sseguin sseguin is online now
Registered User
 
Join Date: Aug 2018
Posts: 307
Just posted our latest video (2 more to follow this week), on O-Train Fans.

Our first Behind the Scenes feature.
We take a look at the Alstom Citadis Spirit simulator used to train operators. Learn about some of the safety features and how the train is controlled in automatic and manual. Very impressive system.

https://www.otrainfans.ca/behind-the-scenes/behind-the-scenes-alstom-citadis-spirit-simulator

Last edited by sseguin; Apr 28, 2019 at 11:34 AM.
     
     
  #10355  
Old Posted Apr 28, 2019, 12:53 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by J.OT13 View Post
Didn't think those stairs went that far, but looking at the Lyon walk-through now, it seems possible.
Good Day.

Found a (small) diagram of the descent shaft for you :

https://ottawa.ca/en/residents/transport...-steps-away-pedestrian-hub-sparks-street

under the Public Art label..... shows the east-west reach (no dimensions, but shows).

Stairs and escalators tend to have a farther horizontal span than we are generally aware of, in that we are generally more focused on the vertical reach.

EnJoy!
     
     
  #10356  
Old Posted Apr 28, 2019, 2:54 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,757
Quote:
Originally Posted by PHrenetic View Post
Good Day.

Found a (small) diagram of the descent shaft for you :

https://ottawa.ca/en/residents/transport...-steps-away-pedestrian-hub-sparks-street

under the Public Art label..... shows the east-west reach (no dimensions, but shows).

Stairs and escalators tend to have a farther horizontal span than we are generally aware of, in that we are generally more focused on the vertical reach.

EnJoy!
Ah yes, I remember that one! Thanks!!
     
     
  #10357  
Old Posted Apr 28, 2019, 2:55 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,757
Quote:
Originally Posted by sseguin View Post
Just posted our latest video (2 more to follow this week), on O-Train Fans.

Our first Behind the Scenes feature.
We take a look at the Alstom Citadis Spirit simulator used to train operators. Learn about some of the safety features and how the train is controlled in automatic and manual. Very impressive system.

https://www.otrainfans.ca/behind-the-scenes/behind-the-scenes-alstom-citadis-spirit-simulator
Very informative. Keep up the good work!
     
     
  #10358  
Old Posted Apr 28, 2019, 4:08 PM
Gat-Train Gat-Train is offline
BANNED
 
Join Date: Nov 2018
Posts: 508
Quote:
Originally Posted by sseguin View Post
Just posted our latest video (2 more to follow this week), on O-Train Fans.

Our first Behind the Scenes feature.
We take a look at the Alstom Citadis Spirit simulator used to train operators. Learn about some of the safety features and how the train is controlled in automatic and manual. Very impressive system.

https://www.otrainfans.ca/behind-the-scenes/behind-the-scenes-alstom-citadis-spirit-simulator
Very nice video! One thing I noticed: in the underground stations, the platforms don't seem to extend very far beyond the front of the train. I thought the underground platforms were built to 120m length, for expanded future trainsets. I sure hope they don't have to go to the trouble of rebuilding the platform 10 years from now.

Furthermore, the train looks like it went pretty fast, up to 80km/h. Will it actually go that fast once in service?
     
     
  #10359  
Old Posted Apr 28, 2019, 6:13 PM
sseguin sseguin is online now
Registered User
 
Join Date: Aug 2018
Posts: 307
Quote:
Originally Posted by Gat-Train View Post
Very nice video! One thing I noticed: in the underground stations, the platforms don't seem to extend very far beyond the front of the train. I thought the underground platforms were built to 120m length, for expanded future trainsets. I sure hope they don't have to go to the trouble of rebuilding the platform 10 years from now.

Furthermore, the train looks like it went pretty fast, up to 80km/h. Will it actually go that fast once in service?
Good questions.

The underground stations are built to full length for future expansion, but I believe they are walled off. Perhaps parts of those sections at the extremities of the in use platforms.

From my understanding during my visit, the maximum track speed limit is 85km/h. The trains are designed to go up to 105km/h however, and have been operated at that speed on the 'test track'.

Some sections like the stretch between uOttawa and Lees, the LRV reaches around 82km/h on average. This will be also what can be expected on the longer stretches elsewhere, so the trains should reach the max track speed in many places.

In the tunnel it passes at a fairly high speed as well, around 60km/h ish, but in the curves it seemed to take them quite a bit slower then accelerate to the higher speed on the straights.

In the video, other than when I was doing Manual Control, in ATC it was operating at regular service speeds.

Same for the stretch between Lees and Hurdman, it was operating between 30-40km/h. The instructor said that was because of it passing over water and the curve.

And on a side note, the 12 day testing is not currently in progress.

I was out all of this morning and I don't think I saw any single trains operating, they were all doubles. There was a double unit stopped for a while at Tremblay, and so the trains were alternating on the other platform. Service was being maintained and a train was arriving every 2.5 minutes in one direction and 2.5 minutes in the other (so 5 minutes each direction). As well, at Tunney's, there was also a train parked at one platform, so arriving trains were stopping on the other platform. In both cases, the stopped train departed after some time. Potentially they were testing scenarios, or could have been a glitch.

Last edited by sseguin; Apr 28, 2019 at 10:17 PM.
     
     
  #10360  
Old Posted Apr 28, 2019, 10:11 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,679
I biked along the entire route from Tunney’s to Blair today and all I saw were doubles, and I saw a lot. They’re running at 3 to 10 minute intervals
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 2:09 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.