Quote:
Originally Posted by J.OT13
Could be an unrelated project, but GeoOttawa, 2015 in front of the Delta Hotel. There is something at the intersection of Queen and O'Connor as well, but it's not as promising.
https://maps.ottawa.ca/geoottawa/
Other than someone (or people) on the forum mentioning this stub at Lyon Station a few times, I've never seen or heard anything of it. I'd like to think the City is capable of such foresight, but they've done little to demonstrate that, Trillium "upgrades" and Bayview's terrible layout being prime examples.
|
Good Day.
In front of the Delta hotel is part of the construction shaft for the entrance staircase and escalator from the Lyon street west entrance standalone podium.
It is in the street, and forms the east wall of the descent shaft, where the small 180 turn is, to descend furthur, back underneath the podium bldg to the concourse level.
Queen and O'Connor is similarly part of the construction works for entrance shafts, this from the Heritage bldg just to the northwest.
I too have seen many mentions of stubs having been built for future-proofing. I decline to believe in them for the simple reason of additional costs incurred at a time of cheaping out. Some knockout walls probably have been built for access to downtown office towers who could be expected to sign on to underground access at a future time, but only as cheaply as possible.
The only stub I know of for sure is the construction shaft from the parking lot opposite 240 Queen, and how much of it was back-filled in is an open question.