  #401  
Old Posted Mar 19, 2019, 12:45 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,699
I was going to say "it's as tall as Mt. Baker".
Those look like 2 more bases on the Homer side...

Quote:
Originally Posted by mcminsen View Post
Yes, but I don't think it reaches to the Homer Street side of the building.

Here are some angles and closeups showing the crane bases.

March 18 '19, my pics


fullsizeoutput_7309
by mcminsen, on Flickr
Reply With Quote
     
     
  #402  
Old Posted Apr 3, 2019, 4:21 AM
mcminsen's Avatar
mcminsen mcminsen is offline
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
Increasingly visible from various locations now. I'm trying to imagine this project topping out with four luffing cranes on it.



April 2 '19, my pics



Reply With Quote
     
     
  #403  
Old Posted Apr 3, 2019, 4:27 AM
mcminsen's Avatar
mcminsen mcminsen is offline
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
April 2 '19, my pics


Reply With Quote
     
     
  #404  
Old Posted Apr 3, 2019, 4:39 AM
mcminsen's Avatar
mcminsen mcminsen is offline
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
April 2 '19, my pics



Reply With Quote
     
     
  #405  
Old Posted Apr 3, 2019, 4:47 AM
mcminsen's Avatar
mcminsen mcminsen is offline
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
Peeking in the old main entrance on Homer Street near Georgia. There was some major jack hammering going on of some walls on the left in the second pic.




April 2 '19, my pics



Reply With Quote
     
     
  #406  
Old Posted Apr 3, 2019, 4:50 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,699
Thanks.

Steel columns coated in concrete?

PS - the cladding on 402 Dunsmuir looks promising (seafoam colour, but big dark mullions)
Reply With Quote
     
     
  #407  
Old Posted Apr 12, 2019, 10:02 PM
x32ace x32ace is offline
Registered User
 
Join Date: Sep 2015
Location: Vancouver
Posts: 9
The Post: 2nd Crane

They've started erecting the second crane on top. Started going up approx 2pm this afternoon.

20190412_145751 by Lots Pictures, on Flickr

Photo taken by me.
Reply With Quote
     
     
  #408  
Old Posted Apr 13, 2019, 12:44 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,699
Thanks!
Reply With Quote
     
     
  #409  
Old Posted Apr 13, 2019, 3:16 AM
mcminsen's Avatar
mcminsen mcminsen is offline
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
Quote:
Originally Posted by x32ace View Post
They've started erecting the second crane on top. Started going up approx 2pm this afternoon.


Thanks for the heads up. I walked by today around that time on the Homer Street side and didn't see it.
Reply With Quote
     
     
  #410  
Old Posted Apr 14, 2019, 6:40 AM
mcminsen's Avatar
mcminsen mcminsen is offline
Registered User
 
Join Date: Sep 2007
Location: Downtown Vancouver
Posts: 9,979
The second crane's lowest section is in but I didn't see any more action today. Perhaps it was too windy? When I was on the QE plaza I had to hold on to my hat.




April 13 '19, my pics






Reply With Quote
     
     
  #411  
Old Posted Apr 16, 2019, 12:11 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,699
Quote:
Construction Updates
April 9, 2019 – For the next two weeks:
Demolition of the floors and openings inside of the existing building is ongoing.
Seventy-two of 120 footings have been replaced to date.
A luffing crane (second of four cranes) adjacent to Hamilton St. will be erected on April 26-28, 2019.
Shoring work for the West Georgia plaza has begun.
The Hamilton Street sidewalk adjacent to the building will be closed starting March 20 for the duration of the project.
The Hamilton Street southbound curb lane will be closed daily from 7:00 am to 5:30 pm (Monday – Saturday).
All activities are executed within the parameters of the City of Vancouver’s building bylaws.
https://www.thepostnews.ca/
Reply With Quote
     
     
  #412  
Old Posted Apr 16, 2019, 2:54 PM
rofina rofina is offline
Registered User
 
Join Date: Nov 2013
Posts: 5,149
This thing is moving at an impressive pace, considering the complexity of working withing an existing building.

Great!
Reply With Quote
     
     
  #413  
Old Posted Apr 16, 2019, 7:56 PM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,068
Whats the red in the windows?
__________________
belowitall
Reply With Quote
     
     
  #414  
Old Posted Apr 16, 2019, 8:49 PM
whatnext whatnext is offline
Registered User
 
Join Date: Feb 2009
Location: Vancouver
Posts: 27,831
Quote:
Originally Posted by SpongeG View Post
Whats the red in the windows?
It's always been part of the building:
http://heritagevancouver.org/top10-watch-list/2013/3-main-post-office-1953-58/
Reply With Quote
     
     
  #415  
Old Posted Apr 16, 2019, 9:48 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,699
Quote:
Originally Posted by SpongeG View Post
Whats the red in the windows?
Those are the spandrel panels between floors.
I think there are different ceiling heights in different parts of the building.
Reply With Quote
     
     
  #416  
Old Posted Apr 17, 2019, 3:48 AM
SpongeG's Avatar
SpongeG SpongeG is offline
Registered User
 
Join Date: Jun 2006
Location: Coquitlam
Posts: 40,068
ok, I've always seen them just wondered what they were made of, I always thought they were like a tile, but seeing them close up in the pics I realize they weren't
__________________
belowitall
Reply With Quote
     
     
  #417  
Old Posted Apr 17, 2019, 4:54 AM
retro_orange retro_orange is offline
retro_orange
 
Join Date: Sep 2014
Location: East Van
Posts: 2,029
Quote:
Originally Posted by SpongeG View Post
ok, I've always seen them just wondered what they were made of, I always thought they were like a tile, but seeing them close up in the pics I realize they weren't

They are tiled, possibly a terra cotta.



mcminsens pic: http://forum.skyscraperpage.com/showpost.php?p=8528164&postcount=404
Reply With Quote
     
     
  #418  
Old Posted Apr 27, 2019, 12:19 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,699
FRom the website:

Quote:
Construction Updates
April 26, 2019 – For the next two weeks:
  • Demolition of the floors and openings inside of the existing building is ongoing.
  • Seventy-four of 120 footings have been replaced to date.
  • A luffing crane (second of four cranes) adjacent to Hamilton St. will be erected on April 26-28, 2019.
  • Hamilton Street will be closed for crane installation from 4:00 pm on April 26 to 11:00 pm on April 28.
  • Shoring work for the West Georgia plaza continues.
  • The Hamilton Street sidewalk adjacent to the building will be closed starting March 20 for the duration of the project.
  • The Hamilton Street southbound curb lane will be closed daily from 7:00 am to 5:30 pm (Monday – Saturday).
  • All activities are executed within the parameters of the City of Vancouver’s building bylaws.
https://www.thepostnews.ca/
Reply With Quote
     
     
  #419  
Old Posted Apr 27, 2019, 12:29 AM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,407
Some nice crane action to look forward to then!
Reply With Quote
     
     
  #420  
Old Posted Apr 27, 2019, 11:28 PM
Changing City's Avatar
Changing City Changing City is online now
Registered User
 
Join Date: Nov 2016
Posts: 8,251
They managed to get the mast up OK, but haven't been able to attach the jib because of the high winds. I guess they'll either try later, or more likely on Sunday. In the meantime Hamilton is closed down.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 4:21 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.