Quote:
Originally Posted by ironman49
Sorry to disappoint, but those people are wrong.
A little birdie told me that there was a lot of things overlooked and not planned out for the tower, which is causing big delays for the steel contractor. June 1st is the date I heard.
|
haha. That's what every steel supplier would tell you about every job.
That's the standard fall back position.
The reality is on a project this big there will be details to get worked out along the way, and things missed. That's what contingencies are for.
Everyone, including the steel contractor/supplier gets to look through the drawings before they bid and commit to a job.