^^ Maybe the cladding will match that sweet two tone blue water look of the mechanical room up top lol
     
     
  #13062  
Old Posted Mar 27, 2019, 6:38 PM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
Quote:
Originally Posted by kcantor View Post
oh great... now 100a street and 102 avenue sidewalks can be closed or under hoarding for another decade.
The entire city always seems to be under construction, nothing new lol.
     
     
  #13063  
Old Posted Mar 27, 2019, 6:42 PM
Kevin_foster's Avatar
Kevin_foster Kevin_foster is offline
Kevin Folds Five
 
Join Date: Jan 2005
Location: Edmonton, Canada
Posts: 6,072
Good news for Ice District...
Except, why doesn't the render have a tower? Or is that still further north out of the picture frame? Edit: Looking at it, the tower would likely be out of frame anyways....

https://www.cbc.ca/news/canada/edmonton/...-open-in-edmonton-ice-district-1.5070038
__________________
I used to be indecisive, but now I'm not sure...
     
     
  #13064  
Old Posted Mar 27, 2019, 7:25 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
^ tower is on hold

Quote:
Originally Posted by DKaz View Post
The entire city always seems to be under construction, nothing new lol.
No kidding. This last stretch has been really irritating to deal with. Coming downtown has not been a pleasant experience for quite some time now
__________________
Short term pain for long term gain
     
     
  #13065  
Old Posted Mar 27, 2019, 8:18 PM
Hardhatdan Hardhatdan is online now
Registered User
 
Join Date: Jan 2003
Posts: 4,328
Quote:
Originally Posted by 240glt View Post
There is 8-10 more years worth of work on the building, with a break coming though. The crane will be removed in October then the next phase starts next year

From what I understand the cladding won't look great, something like the Hendrix, but a lot better than what's there now. And yes they are replacing the glazing as well.
:/

The Hendrix is only moderately okay because of the amount of glazing. You use that product on a building with almost done and it's going to look bad.
     
     
  #13066  
Old Posted Mar 27, 2019, 9:18 PM
Airboy Airboy is offline
Registered User
 
Join Date: Sep 2008
Location: Edmonton/St Albert
Posts: 9,840
so the first developers have been named for Blatchford. Sales may start as early as this week.

Was slogging around the site today. the Energy centre is looking good and will be finished well before the first residences are started.
__________________
Why complain about the weather? Its always going to be here. You on the other hand will not.
     
     
  #13067  
Old Posted Mar 27, 2019, 9:43 PM
Albicaulis's Avatar
Albicaulis Albicaulis is offline
I smash you
 
Join Date: Jan 2011
Location: Edmonton, Alberta
Posts: 261
^
Did you see what the price points will be?
Curious if this will be reasonably affordable or a gimmick for upper middle class folks to buy off their self-inflicted climate change guilt.
     
     
  #13068  
Old Posted Mar 27, 2019, 10:14 PM
SHOFEAR's Avatar
SHOFEAR SHOFEAR is offline
DRINK
 
Join Date: Jun 2004
Location: City Of Champions
Posts: 8,211
lol. $600,000 for a townhome and dealing with construction traffic for the next 30 years.


I paid substantially less for a 2 story 4 bedroom house in riverbend.
__________________
Lana. Lana. Lana? LANA! Danger Zone
     
     
  #13069  
Old Posted Mar 27, 2019, 10:34 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
I believe they said they're starting at $425/sf up to $600/sf

Comparatively, you can get into a brand new, modern contemporary 3+3 townhouse just west in Inglewood for just under $300/sf. Just east of there, in Spruce Ave you can get into a brand new infill 3+3 house with a detached garage and finished basement for $265/sf, or a brand new well appointed half duplex in Westwood for $250/sf. And there are plenty of new infills available for sale in those three areas.

I wish them luck with Blatchford but we'll see who wants to take that plunge, in that area at that price. & deal with a decade or two of construction to boot.
__________________
Short term pain for long term gain
     
     
  #13070  
Old Posted Mar 28, 2019, 12:33 AM
urbanroo urbanroo is offline
Registered User
 
Join Date: May 2015
Posts: 352
I just paid $350/ sq ft for a very nice historic home in Westmount. I like the project but they may need to reduce the prices.
     
     
  #13071  
Old Posted Mar 28, 2019, 12:56 AM
Vixx Vixx is offline
Registered User
 
Join Date: Sep 2017
Location: Wild Rose Country/Worst Case Ontario
Posts: 398
Renders look good for Blatchford but yeah with those prices it'll be a very long, drawn out development spanning decades.

I've noticed some geotech work being done at the proposed Winspear expansion parking lot out back for those curious.

Also, noticed that the for sale sign on this building

https://www.google.com/maps/@53.5465037,...%3D322.3275%26pitch%3D0%26thumbfov%3D100

has a pending sign on it. A lot of potential with this building so hopefully it'll be repurposed soon.
     
     
  #13072  
Old Posted Mar 28, 2019, 1:12 AM
kcantor kcantor is offline
Registered User
 
Join Date: Aug 2007
Location: Edmonton
Posts: 2,987
Quote:
Originally Posted by Vixx View Post
Renders look good for Blatchford but yeah with those prices it'll be a very long, drawn out development spanning decades.

I've noticed some geotech work being done at the proposed Winspear expansion parking lot out back for those curious.

Also, noticed that the for sale sign on this building

https://www.google.com/maps/@53.5465037,...%3D322.3275%26pitch%3D0%26thumbfov%3D100

has a pending sign on it. A lot of potential with this building so hopefully it'll be repurposed soon.
i think it’s been pending since last summer...
__________________
"If you did not want much, there was plenty." Harper Lee
     
     
  #13073  
Old Posted Mar 28, 2019, 1:15 AM
Vixx Vixx is offline
Registered User
 
Join Date: Sep 2017
Location: Wild Rose Country/Worst Case Ontario
Posts: 398
Quote:
Originally Posted by kcantor View Post
i think it’s been pending since last summer...
Well that sucks
     
     
  #13074  
Old Posted Mar 28, 2019, 9:39 AM
Atlguy33 Atlguy33 is offline
Registered User
 
Join Date: Aug 2002
Posts: 878
What's now located where the Sobey's used to be?
__________________
"Oh, I'm afraid the deflector shield will be quite operational when your friends arrive."
     
     
  #13075  
Old Posted Mar 28, 2019, 1:01 PM
Hallsy's Toupee's Avatar
Hallsy's Toupee Hallsy's Toupee is offline
Registered User
 
Join Date: Feb 2010
Location: Edmonton
Posts: 6,895
Quote:
Originally Posted by Atlguy33 View Post
What's now located where the Sobey's used to be?
If you're talking about the 4th St Promenade location, it's been subdivided into smaller spaces for ethnic restaurants. Tiffin (an Indian eatery) and some Japanese BBQ joint are opening soon.
     
     
  #13076  
Old Posted Mar 28, 2019, 2:14 PM
kcantor kcantor is offline
Registered User
 
Join Date: Aug 2007
Location: Edmonton
Posts: 2,987
Quote:
Originally Posted by Vixx View Post
Well that sucks
not really - these things take time and if it’s being sold to who i think it’s being sold to i’m sure we’ll all be pretty pleased with their plans for it.
__________________
"If you did not want much, there was plenty." Harper Lee
     
     
  #13077  
Old Posted Mar 28, 2019, 3:11 PM
TimB09 TimB09 is offline
Registered User
 
Join Date: Oct 2006
Location: Edmonton
Posts: 1,526
Quote:
Originally Posted by kcantor View Post
not really - these things take time and if it’s being sold to who i think it’s being sold to i’m sure we’ll all be pretty pleased with their plans for it.
Are they potentially planning to keep the existing structure and building off that? Or demolishing and starting anew?
     
     
  #13078  
Old Posted Mar 28, 2019, 5:40 PM
EdmTrekker EdmTrekker is offline
Registered User
 
Join Date: Jul 2006
Posts: 5,247
City Market renders show the 2 buildings next door to the one being discussed as being a bakery/cafe and the larger one (Eds Pawn Shop) a brewery and that building as shown on google earth has a patio deck above it and a rather large angled glazing from the second floor. I can't recall what was in the Eds location previously.
     
     
  #13079  
Old Posted Mar 28, 2019, 5:41 PM
kcantor kcantor is offline
Registered User
 
Join Date: Aug 2007
Location: Edmonton
Posts: 2,987
Quote:
Originally Posted by TimB09 View Post
Are they potentially planning to keep the existing structure and building off that? Or demolishing and starting anew?
that i do not know... there is no current historical designation to either of the two buildings that comprise the stovell block but i can't imagine it would be purchased to demolish when there is lots of vacant land in the immediate area.

having said that, the two storey building on the corner is actually an addition to the single storey building at the south end of the lot and will be the more challenging of the two to retain as the exterior walls weren't in great shape structurally for what we were considering. at the end of the day it would have been demolished and rebuilt incorporating and repurposing the original bank building. other uses might more readily be incorporated than what we were contemplating but it still won't be easy. this kind of work never is.
__________________
"If you did not want much, there was plenty." Harper Lee
     
     
  #13080  
Old Posted Mar 28, 2019, 6:07 PM
CMD UW's Avatar
CMD UW CMD UW is offline
Urbis Maximus
 
Join Date: Feb 2002
Location: Edmonton
Posts: 12,009
^I believe that they (the City) are pushing for the Stoval Block to be retained and 'designated'. Don't worry about the 'pending' sign either. The pending sign at our Substation project on 124 Street was on (and is still on) for months. Deal closes tomorrow though, development permit submitted.
__________________
"Call me sir, goddammit!"
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton
Forum Jump



Forum Jump


All times are GMT. The time now is 6:22 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.