Old Posted Feb 21, 2019, 5:53 PM
Ottawaresident Ottawaresident is offline
BANNED
 
Join Date: Jan 2019
Location: Guess! Hint: It's in my username
Posts: 317
Ottawa weather, the scary thing ...
     
     
  #9522  
Old Posted Feb 22, 2019, 3:13 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,064
Couple pictures from today's update. Seems like a lot of work is left at Tunney's and Bayview. It's like there not even trying.





Art work at Pimisi.



St-Laurent still missing plenty of ceiling tiles.



Parliament platform looks wider than Lyon's. As someone mentioned, the positioning of Parliament's vertical circulation maximizes the full width area down the middle.



https://www.ligneconfederationline.ca/news/construction-update-213/
     
     
  #9523  
Old Posted Feb 22, 2019, 11:23 AM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by J.OT13 View Post

St-Laurent still missing plenty of ceiling tiles.
Maybe it's just a style thing. If you've been to Toronto lately the "missing tile look" is all the rage



     
     
  #9524  
Old Posted Feb 22, 2019, 1:44 PM
Ottawaresident Ottawaresident is offline
BANNED
 
Join Date: Jan 2019
Location: Guess! Hint: It's in my username
Posts: 317
Wait what? They added turnstiles? Last time I was in Toronto there wasn't a single turnstile in sight. At least the Trillium has them ...
     
     
  #9525  
Old Posted Feb 25, 2019, 2:18 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,113
I found this line in the Stage 2 report from Friday:
Quote:
$20,000,000 for the acquisition of two train sets (four light rail vehicles) to provide additional capacity on the O-Train Confederation Line;
(emphasis mine)
I didn't realize we were getting 4 new LRVs (for two trainsets).


The report also mentions a total fleet size of 85 vehicles after the completion of Stage 2... but it's really not clear whether the 4 new vehicles are being included (or if they're included as part of the Stage 2 fleet increase). 85 = 34 + 6 + 7 + 38 (Stage 1, Trillium, FLIRTs, Stage2)


Also from the report:
Quote:
With respect to the delivery of the Stage 2 Alstom Citadis Vehicles, their status is as
follows:
 LRV 35 - fully trucked complete;
 LRV 36 - cars in production and bogies are on site ready for installation;
 LRV 37 - cars are in production (fabrication); and,
 LRV 38 - underframes are being assembled.
Currently, RTG expects to have the entire expanded fleet (Remaining LRVs 39-72; 38
additional vehicles in total) assembled by Q3 2021, well in advance of when they will be
required to commence testing and commissioning for the Confederation Line
extensions.
The 4 new vehicles are being counted in the 38 new Stage 2 vehicles.
     
     
  #9526  
Old Posted Feb 25, 2019, 6:29 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,084
Missing tiles likely means they are just keeping access to utilities open until they absolutely need to close everything up.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #9527  
Old Posted Feb 25, 2019, 7:53 PM
Ottawaresident Ottawaresident is offline
BANNED
 
Join Date: Jan 2019
Location: Guess! Hint: It's in my username
Posts: 317
Sigh ...
     
     
  #9528  
Old Posted Feb 25, 2019, 11:05 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,064
From Fleury's Twitter. Lee's Station.



https://twitter.com/MathieuFleury/status/1099369569779630080
     
     
  #9529  
Old Posted Feb 26, 2019, 7:47 PM
Ottawaresident Ottawaresident is offline
BANNED
 
Join Date: Jan 2019
Location: Guess! Hint: It's in my username
Posts: 317
Hopefully this thing actually opens!!!???
     
     
  #9530  
Old Posted Feb 26, 2019, 8:49 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Ottawaresident View Post
Hopefully this thing actually opens!!!???
I thought you wanted to ditch the Confederation line?
Quote:
Originally Posted by Ottawaresident View Post
Riverside should do, provided they remove all those bends and those tiny intersections. If they improved that hole of time called Bronson to the 417, IMPROVED not turned into freeway, that probably expensive disruptive and delayed (cough cough confederation line) could be ditched. Too much opposition anyways.
     
     
  #9531  
Old Posted Feb 27, 2019, 12:57 AM
Ottawaresident Ottawaresident is offline
BANNED
 
Join Date: Jan 2019
Location: Guess! Hint: It's in my username
Posts: 317
I forgot to put in the word road.
     
     
  #9532  
Old Posted Feb 27, 2019, 4:11 AM
c_speed3108 c_speed3108 is offline
Registered User
 
Join Date: May 2007
Posts: 1,858
Noticed that most of the construction fences at Cyrville station have been removed FWIW
     
     
  #9533  
Old Posted Feb 27, 2019, 3:33 PM
Ottawaresident Ottawaresident is offline
BANNED
 
Join Date: Jan 2019
Location: Guess! Hint: It's in my username
Posts: 317
Some good news in a never ending line of delays ...
     
     
  #9534  
Old Posted Feb 28, 2019, 7:21 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,113
According to a post on Reddit they had 15 uncoupled trains out running last night.
https://www.reddit.com/r/ottawa/comments/avt5xm/lrt_update_sudden_progress_many_trains_wow/

Will we see an article from the CBC on this accomplishment?
     
     
  #9535  
Old Posted Feb 28, 2019, 7:27 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by OCCheetos View Post
According to a post on Reddit they had 15 uncoupled trains out running last night.
https://www.reddit.com/r/ottawa/comments/avt5xm/lrt_update_sudden_progress_many_trains_wow/

Will we see an article from the CBC on this accomplishment?
Not likely. The problem is we need 15 double trains running, otherwise we don't have near enough capacity for rush hour. It is a positive sign though, as it would be 15 single trains running on the weekends. I think we're going to be a few trains short at the end of the month. The question will be how far behind the remaining trains are. I predict we'll still be riding in May, with handover sometime in mid april. I know others are more pessamistic
     
     
  #9536  
Old Posted Feb 28, 2019, 7:50 PM
AuxTown's Avatar
AuxTown AuxTown is online now
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,641
I predict that the day before handover Melnyk is found tampering with the signals all along the Confederation line resulting in indefinite delays. This year can only get worse for big Ottawa projects....

     
     
  #9537  
Old Posted Feb 28, 2019, 8:05 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is online now
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,692
Walked by the Rideau east entrance a few hours ago and thought there's no way they are handing this over in a month.
     
     
  #9538  
Old Posted Feb 28, 2019, 8:06 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,381
Quote:
Originally Posted by kmcamp View Post
Not likely. The problem is we need 15 double trains running, otherwise we don't have near enough capacity for rush hour. It is a positive sign though, as it would be 15 single trains running on the weekends. I think we're going to be a few trains short at the end of the month. The question will be how far behind the remaining trains are. I predict we'll still be riding in May, with handover sometime in mid april. I know others are more pessamistic
If they can get 15 uncoupled trains to run smoothly then it means signals are working, which is a very good sign.
     
     
  #9539  
Old Posted Feb 28, 2019, 8:29 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by zzptichka View Post
If they can get 15 uncoupled trains to run smoothly then it means signals are working, which is a very good sign.
Agreed. I was at St.Laurent this morning (09:25) and it looked like they were loading up the line for a full test (with single LRV trains) - the westbounds were 3 1/2 minutes apart, and the eastbounds were departing from St.L at 3 1/2 minute intervals - but the next eastbound was pulling in as soon as the previous had just departed, and then waiting, as if they were being loaded from Belfast Yard to eastbound asap.
The westbound next train times signage so indicated too - 3 1/2 minutes apart.
And there were 6-8 OC-T (O-Train) helmeted personnel in the St.L accessway to the trains, talking and smartphone-ing.

Trying ?
     
     
  #9540  
Old Posted Feb 28, 2019, 8:40 PM
Ottawaresident Ottawaresident is offline
BANNED
 
Join Date: Jan 2019
Location: Guess! Hint: It's in my username
Posts: 317
Quote:
Originally Posted by PHrenetic View Post
Agreed. I was at St.Laurent this morning (09:25) and it looked like they were loading up the line for a full test (with single LRV trains) - the westbounds were 3 1/2 minutes apart, and the eastbounds were departing from St.L at 3 1/2 minute intervals - but the next eastbound was pulling in as soon as the previous had just departed, and then waiting, as if they were being loaded from Belfast Yard to eastbound asap.
The westbound next train times signage so indicated too - 3 1/2 minutes apart.
And there were 6-8 OC-T (O-Train) helmeted personnel in the St.L accessway to the trains, talking and smartphone-ing.

Trying ?
Well in this land of never PHrenetic that wi
The staff is horrible. There should be more protocol.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 12:01 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.