Reading through the station descriptions, I wanted to critic the location and lay-out of each. I won't go into the design aesthetics; though I was initially disappointed that they value-engineered the design language of Stage 1, I understand that some sacrifices need to be made in order to expand the system. That might be how the winning consortium was able to get a price, not within budget, but within "affordability".
This is based off the document describing each station. In parentheses, I've indicated my preferred name for the station, should it be different from the presentation.
https://app05.ottawa.ca/sirepub/cache/2/03f5y2hirvcglz23htbtbodt/56880702232019112752335.PDF
Trim: I'm not sure I fully understand, but they are shifting Trim Road east of the park-and-ride? I would like to see a general plan of the area to wrap my head around it. Beyond that, I'm disappointed they didn't include a fare-paid area for the bus loop. I also don't understand why they didn't include a pedestrian bridge to the north side of the highway; though most of the ridership will come from transfers and the park-and-ride, the north side would provide all walk-in traffic, including La Cité's trades campus and Petrie's Landing. Hoping the park-and-ride is consolidated within a parking garage in order to redevelop the rest, but no specifics on that.
Place d'Orleans: This one is well designed in terms of functionality. The second fare-paid pedestrian bridge looks a little out of place, but will be appreciated by those transferring I'm sure.
Orleans Boulevard (Convent Glen) and
Jeanne d'Arc: I wish the bus stops would be integrated with the station entrances instead of 150 feet away.
Montreal (Beacon Hill): That underpass sorely needed some work and this station will transform it. I'm glad the City decided to realign the station to be in the median instead of to the north side. Liking what they proposed here. Even love the look of the entrances. Very big city. I do wonder what that random glass wall just outside the entrance is for (page 46 of the presentation, not the station description document).