  #9321  
Old Posted Feb 9, 2019, 6:49 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,900
This whole thing reminds me of an old school Mike Holmes episode. Somebody who didn’t know anything accepted the lowball bid, didn’t insist on a sensible payment schedule, didn’t properly supervise construction properly and wonders why it all went to ****.
     
     
  #9322  
Old Posted Feb 9, 2019, 8:34 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
The way I see it, there will either be problems that need to be fixed or there won’t. If there are, we will have to fix them along the way, but we need this train running ASAP. Unless they ate safety related issues or prevent the line from running, we can’t afford to wait to fix them.
     
     
  #9323  
Old Posted Feb 9, 2019, 8:51 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,900
I saw an electrical contractor at OttawaU station with a large spool of cable on his truck. While I have no idea what he was doing, that is the kind of thing that worries me, because either a) they are only doing wiring now on a station that has been mostly complete for quite some time or b) they need to replace electrical.
     
     
  #9324  
Old Posted Feb 9, 2019, 8:55 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,069
Why are people saying the city cheapest out?

Unless I'm mistaken, RTG is responsible for picking out all those components and fittings. And they will bear the cost of maintaining them.

I can envision the the city lacked the experience to write a contract with sufficient teeth and maybe lacks quality lawyers for the scope involved.

A defence project that a friend of mine was on had to hire private litigation counsel once because the Department of Justice didn't have lawyers skilled enough to sue the contractor. They were only used to being on the receiving end. And he said that private team was so good, the difference in ability was apparent from his first interview with them. As an example of things that can go awry.

The question here is, what is wrong and how bad is the delay. Well find out on Tuesday I guess.
     
     
  #9325  
Old Posted Feb 9, 2019, 9:38 PM
phil235's Avatar
phil235 phil235 is online now
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 4,602
Quote:
Originally Posted by Truenorth00 View Post
I can envision the the city lacked the experience to write a contract with sufficient teeth and maybe lacks quality lawyers for the scope involved.
I guarantee that the City hired external counsel to draft and negotiate the contract, so this wouldn’t be on the City lawyers. In any event, it’s far too early to judge whether there are gaps in the contract, as we would not have any idea what steps the City is taking to enforce the contract behind the scenes. This is a 30-year relationship, so there are lots of considerations that go into how a party approaches deficiencies.
     
     
  #9326  
Old Posted Feb 9, 2019, 10:49 PM
Truenorth00 Truenorth00 is offline
Registered User
 
Join Date: May 2017
Posts: 29,069
Quote:
Originally Posted by acottawa View Post
I saw an electrical contractor at OttawaU station with a large spool of cable on his truck. While I have no idea what he was doing, that is the kind of thing that worries me, because either a) they are only doing wiring now on a station that has been mostly complete for quite some time or b) they need to replace electrical.
This is not something I’d be too quick to be worried about. You’re bound to have some deficiencies in a multi-billion dollar construction project. The question is one of magnitude and frequency of those deficiencies.

I also wouldn’t extrapolate from what you saw. It may not be the wiring. It could easily have been some other deficiency that resulted in the ripping out some wiring and then reinstalling. We’ve seen reports of concrete work that had to rectified.
     
     
  #9327  
Old Posted Feb 9, 2019, 11:08 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,900
Quote:
Originally Posted by phil235 View Post
I guarantee that the City hired external counsel to draft and negotiate the contract, so this wouldn’t be on the City lawyers. In any event, it’s far too early to judge whether there are gaps in the contract, as we would not have any idea what steps the City is taking to enforce the contract behind the scenes. This is a 30-year relationship, so there are lots of considerations that go into how a party approaches deficiencies.
Whether it is city lawyers or outside lawyers, if they advised that the contract should have a 0.05% penalty for being almost a year behind schedule then the city got some bad advice.
     
     
  #9328  
Old Posted Feb 9, 2019, 11:09 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,900
Quote:
Originally Posted by Truenorth00 View Post
This is not something I’d be too quick to be worried about. You’re bound to have some deficiencies in a multi-billion dollar construction project. The question is one of magnitude and frequency of those deficiencies.

I also wouldn’t extrapolate from what you saw. It may not be the wiring. It could easily have been some other deficiency that resulted in the ripping out some wiring and then reinstalling. We’ve seen reports of concrete work that had to rectified.
I hope you’re right.
     
     
  #9329  
Old Posted Feb 10, 2019, 12:21 AM
phil235's Avatar
phil235 phil235 is online now
Registered User
 
Join Date: Sep 2006
Location: Ottawa
Posts: 4,602
Quote:
Originally Posted by acottawa View Post
Whether it is city lawyers or outside lawyers, if they advised that the contract should have a 0.05% penalty for being almost a year behind schedule then the city got some bad advice.
The size of the penalty isn’t really a lawyer’s call. As I mentioned, this is a 30-year relationship, so they are looking at a much bigger picture when they structure the penalties and incentives.
     
     
  #9330  
Old Posted Feb 10, 2019, 1:28 AM
pattherat pattherat is offline
Registered User
 
Join Date: Nov 2018
Posts: 197
Quote:
Originally Posted by phil235 View Post
The size of the penalty isn’t really a lawyer’s call. As I mentioned, this is a 30-year relationship, so they are looking at a much bigger picture when they structure the penalties and incentives.
...and also to consider: one can put in huge late penalties in a contract if one wants, but that doesn’t guarantee that respondents would be willing to sign it...

Last edited by pattherat; Feb 10, 2019 at 1:29 AM. Reason: Grammar
     
     
  #9331  
Old Posted Feb 10, 2019, 3:52 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,805
A little blast from the past.

Bold headline form December 23, 2016

Rail Line stays on track despite sinkhole delay

True or False?
     
     
  #9332  
Old Posted Feb 10, 2019, 3:54 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,084
Quote:
Originally Posted by Dengler Avenue View Post
Ottawa’s in a valley, though. What does RTG expect?
Huh?
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
     
     
  #9333  
Old Posted Feb 10, 2019, 4:15 AM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,682
Quote:
Originally Posted by Uhuniau View Post
Huh?
It gets extremely cold and snowy in the winter.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
     
     
  #9334  
Old Posted Feb 10, 2019, 6:07 AM
CityTech CityTech is offline
Registered User
 
Join Date: May 2016
Location: Ottawa
Posts: 2,798
Quote:
Originally Posted by GoTrans View Post
This city cheaps out on everything but pays more in the long term.
That'll be RTG. Especially the aforementioned elevator problem. RTG will be the ones paying to replace the elevators if they wear out early.
     
     
  #9335  
Old Posted Feb 10, 2019, 6:09 AM
CityTech CityTech is offline
Registered User
 
Join Date: May 2016
Location: Ottawa
Posts: 2,798
Quote:
Originally Posted by kmcamp View Post
Is there any major project these days that isn't a raging distaster? Think NYC's second Ave subway, Edmonton's metro line, ION, etc, and all signs point to the Crosstown in Toronto being yet another fiasco.
Yeah. Megaprojects always come with bumps.

Quote:
Originally Posted by kmcamp View Post
I guess we were all being a bit nïeve about the confed line being any different
That, and I think we all overestimated the private sector's competency. All of us (myself included) had this mentality that because RTG has a 30 year maintenance obligation they'd have to build a quality product to save costs, as if they're some magical entity that always makes optimal choices, when in reality, private companies can be just as penny wise and pound foolish as governments.
     
     
  #9336  
Old Posted Feb 10, 2019, 12:12 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by CityTech View Post
Yeah. Megaprojects always come with bumps.



That, and I think we all overestimated the private sector's competency. All of us (myself included) had this mentality that because RTG has a 30 year maintenance obligation they'd have to build a quality product to save costs, as if they're some magical entity that always makes optimal choices, when in reality, private companies can be just as penny wise and pound foolish as governments.
Speaking as someone who has always worked in the private sector, they usually are, especially the very large ones.
     
     
  #9337  
Old Posted Feb 10, 2019, 12:47 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,900
Quote:
Originally Posted by CityTech View Post
That'll be RTG. Especially the aforementioned elevator problem. RTG will be the ones paying to replace the elevators if they wear out early.
If that is the case. We have no idea what the contract says (and we have been mislead so many times on the construction contract that I am not sure we should assume the maintenance contract will work in the city’s favour).
     
     
  #9338  
Old Posted Feb 10, 2019, 12:48 PM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,900
Quote:
Originally Posted by Dengler Avenue View Post
It gets extremely cold and snowy in the winter.
I don’t think that is really valley related.
     
     
  #9339  
Old Posted Feb 10, 2019, 1:23 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,064
Quote:
Originally Posted by CityTech View Post
That'll be RTG. Especially the aforementioned elevator problem. RTG will be the ones paying to replace the elevators if they wear out early.
Based on the fixed price contact, RTG was to be responsible for any cost overruns and unforeseeable issues during construction, along with the measly $1 million penalties for every missed deadline (except the first one apparently).They don't seem willing to pay for those now. Who's to say they won't try to get some money out of the City when their sub-par equipment fails.

Quote:
Originally Posted by CityTech View Post
That, and I think we all overestimated the private sector's competency. All of us (myself included) had this mentality that because RTG has a 30 year maintenance obligation they'd have to build a quality product to save costs, as if they're some magical entity that always makes optimal choices, when in reality, private companies can be just as penny wise and pound foolish as governments.
Yes. The City placed way to much trust in the private sector. They figured the fixed price contract with 30 year maintenance would give them a iron clad deal. That's not looking good so far.
     
     
  #9340  
Old Posted Feb 10, 2019, 2:13 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by acottawa View Post
I don’t think that is really valley related.
My thoughts as well. For example, Death Valley isn’t really known for its cold and snow.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 2:08 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.