  #9301  
Old Posted Feb 9, 2019, 4:15 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,805
Quote:
Originally Posted by Truenorth00 View Post
Their reputation and that of council is on the line. The public will be hopping mad if there’s a third delay. But it will really look bad on the politicians if they can’t get straight answers from a contractor.

I’d argue that Manconi’s job is probably on the line too.
People will just sigh. The city has been promising LRT for more than 15 years. What's another year?

Every rail project so far has been botched to some degree, with the possible exception of the original O-Train when expectations were so low.

I will tell you that I wouldn't hold my breath about a schedule for Phase 2 either.
     
     
  #9302  
Old Posted Feb 9, 2019, 2:52 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
z

Last edited by eltodesukane; Aug 8, 2019 at 9:13 PM.
     
     
  #9303  
Old Posted Feb 9, 2019, 3:01 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by eltodesukane View Post
Even the original O-Train has been botched to some degree,
it should have had double tracking on its full length.
Maybe not the tunnel, but the rest should be double track.
     
     
  #9304  
Old Posted Feb 9, 2019, 3:07 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,682
Quote:
Originally Posted by swimmer_spe View Post
Maybe not the tunnel, but the rest should be double track.
You create bottlenecks that way though. From what you have told me, it seems that you haven’t spent much time in cities where intra-city rail transit forms an important part of the transit network. Whenever you have time to travel, you should explore them.

Please don’t take offense at my words.

Sometimes I wonder: If the province were to take over responsibilities for municipal transit, would it still have been a half-baker work?
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
     
     
  #9305  
Old Posted Feb 9, 2019, 3:09 PM
AuxTown's Avatar
AuxTown AuxTown is offline
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,641
On a somewhat related note I have been talking to a couple guys that worked on the project lately. One guy on the elevators and the other on constructing the tunnel. Their opinion is that the city cheaped out on many aspects of this project. For example, the elevator guy says the elevators they installed are designed to be used in California or something. He expects there to be major problems related to temperature, snow, salt, etc.

And the laborers working on the tunnel were contracted out to the lowest bidders, resulting in poor workmanship and technical skills on this highly technical aspect of the project.

I am going to be really sad if this is delayed again. Our city deserves a win after some of the disasters in recent years (failing hockey franchise, Lebreton debacle, bus accidents, sink hole, TERRIBLE WEATHER!). Here's hoping....
     
     
  #9306  
Old Posted Feb 9, 2019, 3:13 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,682
Sadly, severe cheapening out is one huge problem with the P3 model.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
     
     
  #9307  
Old Posted Feb 9, 2019, 3:20 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,805
Quote:
Originally Posted by eltodesukane View Post
Even the original O-Train has been botched to some degree,
it should have had double tracking on its full length.
It was just a demonstration project. It was in 2006, that we botched it. We can debate about that project, but I think we can all agree that if it had been designed properly we wouldn't be waiting more than 15 years to build our first true LRT line. When you think about, this was irresponsible indecision by our politicians. A few of our councilors have been on council for that entire time. This is our city in poorly executed action.

Last edited by lrt's friend; Feb 9, 2019 at 3:37 PM.
     
     
  #9308  
Old Posted Feb 9, 2019, 3:22 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,064
Quote:
Originally Posted by Truenorth00 View Post
Their reputation and that of council is on the line. The public will be hopping mad if there’s a third delay. But it will really look bad on the politicians if they can’t get straight answers from a contractor.

I’d argue that Manconi’s job is probably on the line too.
The election was a few months ago. By the time the next one comes around in 2022, Line 1 delays will be ancient history. Unless of course we're in the middle of a court battle with RTG at that time.

As for Manconi, after the miss-management of the rail file, the bus route changes for an opening that never was and two deadly bus crashes, it doesn't seem anything will get him fired.

Quote:
Originally Posted by O-Town Hockey View Post
On a somewhat related note I have been talking to a couple guys that worked on the project lately. One guy on the elevators and the other on constructing the tunnel. Their opinion is that the city cheaped out on many aspects of this project. For example, the elevator guy says the elevators they installed are designed to be used in California or something. He expects there to be major problems related to temperature, snow, salt, etc.

And the laborers working on the tunnel were contracted out to the lowest bidders, resulting in poor workmanship and technical skills on this highly technical aspect of the project.

I am going to be really sad if this is delayed again. Our city deserves a win after some of the disasters in recent years (failing hockey franchise, Lebreton debacle, bus accidents, sink hole, TERRIBLE WEATHER!). Here's hoping....
This is one project the City should now have cheeped out on. And they have, reducing the scope countless times between the initial project presented to the public under O'Brien and the contract awarded in 2012. Think reduction of escalators, platforms shortened from 180 meters to 150 to 120 and now 100.

That said, the elevators chosen for the project and the contractors were, as far as I understand, RTG's responsibility. It seems the City chose the lowest bid in RTG (most likely) and gave them ultimate power when it came to everything related to construction. Shut up and take my money.

It seems the 3P concept of the contractor morphing into maintenance and operations doesn't actually result in a better product as the City has claimed for the last 10 years.

Last edited by J.OT13; Feb 9, 2019 at 3:36 PM.
     
     
  #9309  
Old Posted Feb 9, 2019, 3:35 PM
OCCheetos OCCheetos is offline
Registered User
 
Join Date: Aug 2017
Posts: 2,113
Quote:
Originally Posted by lrt's friend View Post
It was just a demonstration project. It was in 2006, that we botched it. We can debate about that project, but I think we can all agree that if it had been designed properly we wouldn't be waiting more than 15 years to build our first true LRT time. When you think about, this was irresponsible indecision by our politicians. A few of our councilors have been on council for that entire time. This is our city in poorly executed action.
And then botched again in 2013-2015. Still waiting for that 8 minute frequency...
     
     
  #9310  
Old Posted Feb 9, 2019, 3:41 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,805
Quote:
Originally Posted by OCCheetos View Post
And then botched again in 2013-2015. Still waiting for that 8 minute frequency...
Just like double tracking, don't hold your breath. Just wait for the white elephant, the airport spur. We all know that this will be another poorly executed project. There would be wonderful irony if the botched South Keys pedestrian bridge collapsed on it, not that I want to see anybody hurt.

By the way, for a project that was supposed to be a welcoming gateway for visitors to Ottawa, the grounds around the pedestrian bridge are so badly maintained that it all looks like a big eyesore. But, Ottawa is a tim bits city. We can't invest in a bit of good landscaping and a floral display for our gateway from the airport. Our airport is award winning but our gateway to the city is gawd awful.
     
     
  #9311  
Old Posted Feb 9, 2019, 3:58 PM
acottawa acottawa is online now
Registered User
 
Join Date: Aug 2009
Posts: 18,900
Quote:
Originally Posted by J.OT13 View Post

It seems the 3P concept of the contractor morphing into maintenance and operations doesn't actually result in a better product as the City has claimed for the last 10 years.
I am not sure the problem is the concept, it is a poorly written contract and a lack of proper supervision, which I think relates to the political pressure to keep the contract under 2.1 billion and a lack of capacity by city staff.. Lots of these contracts turn out fine.
     
     
  #9312  
Old Posted Feb 9, 2019, 4:06 PM
GoTrans GoTrans is offline
Registered User
 
Join Date: Jan 2010
Posts: 695
Quote:
Originally Posted by O-Town Hockey View Post
On a somewhat related note I have been talking to a couple guys that worked on the project lately. One guy on the elevators and the other on constructing the tunnel. Their opinion is that the city cheaped out on many aspects of this project. For example, the elevator guy says the elevators they installed are designed to be used in California or something. He expects there to be major problems related to temperature, snow, salt, etc.

And the laborers working on the tunnel were contracted out to the lowest bidders, resulting in poor workmanship and technical skills on this highly technical aspect of the project.

I am going to be really sad if this is delayed again. Our city deserves a win after some of the disasters in recent years (failing hockey franchise, Lebreton debacle, bus accidents, sink hole, TERRIBLE WEATHER!). Here's hoping....
This city cheaps out on everything but pays more in the long term.
     
     
  #9313  
Old Posted Feb 9, 2019, 4:18 PM
GoTrans GoTrans is offline
Registered User
 
Join Date: Jan 2010
Posts: 695
Quote:
Originally Posted by acottawa View Post
I am not sure the problem is the concept, it is a poorly written contract and a lack of proper supervision, which I think relates to the political pressure to keep the contract under 2.1 billion and a lack of capacity by city staff.. Lots of these contracts turn out fine.
As I have said before, the politicians and city staff have absolutely no experience with railway construction and tunnelling in particular. The problem is not admitting there is a lack of experience but their unwillingness to hire people that have the experience. This has been seen time and time again with the Trillium line. Qualified people need be hired at the very beginning when the scope of the project is communicated with potential contractors preparing bids. The supervision of the projects needs to be more tightly controlled. Items such as water seepage in tunnels are very expensive and time consuming to fix and result in reduced availability of the system. As one example, we should not be replacing rail cars on the Trillium line for the 3rd time.
     
     
  #9314  
Old Posted Feb 9, 2019, 4:24 PM
GoTrans GoTrans is offline
Registered User
 
Join Date: Jan 2010
Posts: 695
To give RTG some leeway, they probably set their time frame on the last iteration of the transfer date with a more mild winter in mind. Even though most construction now takes place year around, winter temperatures and snowfalls cause production to be drastically hindered and costs to rise because heat needs to be applied in many cases to complete the required work. I think RTG was overly optimistic on how fast they could finish the remaining work. I have not seen any shrouding covering work areas at the above ground stations on items that look like they need protection to be completed.

Last edited by GoTrans; Feb 9, 2019 at 4:35 PM.
     
     
  #9315  
Old Posted Feb 9, 2019, 4:28 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,682
Ottawa’s in a valley, though. What does RTG expect?
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
     
     
  #9316  
Old Posted Feb 9, 2019, 4:41 PM
GoTrans GoTrans is offline
Registered User
 
Join Date: Jan 2010
Posts: 695
Quote:
Originally Posted by Dengler Avenue View Post
Ottawa’s in a valley, though. What does RTG expect?
Don't forget that the trackage an catenary were built by the foreign partners in the consortium who probably do not have experience with Canadian winters. I worked on an oil sands project in Fort McMurray where a foreign engineering and general contractor had no real experience with real winters. It was a gong show because they did not want to take advice from Canadians about winter. Winter in most of Europe cannot compare with winter in most of Canada.

As far as the station construction, there is no excuse for Ellis Don not knowing how to plan and construct in winter.
     
     
  #9317  
Old Posted Feb 9, 2019, 4:43 PM
On Edge On Edge is offline
Registered User
 
Join Date: Oct 2012
Posts: 159
Quote:
Originally Posted by lrt's friend View Post
Just like double tracking, don't hold your breath. Just wait for the white elephant, the airport spur. We all know that this will be another poorly executed project. There would be wonderful irony if the botched South Keys pedestrian bridge collapsed on it, not that I want to see anybody hurt.

By the way, for a project that was supposed to be a welcoming gateway for visitors to Ottawa, the grounds around the pedestrian bridge are so badly maintained that it all looks like a big eyesore. But, Ottawa is a tim bits city. We can't invest in a bit of good landscaping and a floral display for our gateway from the airport. Our airport is award winning but our gateway to the city is gawd awful.
Absolutely. On arriving in our 'beautiful" capital city, visitors are treated to a potholed 2-lane cowpath (backed up with commuter traffic at key times of the day) with panoramic views of groundhog holes, weed-overgrown wastelands, and the backside of South keys strip mall.

As for the Confed Line, I guess some of our worst fears are coming true... huge delays and cost overrruns, ongoing maintenance issues requiring lengthy shutdowns, and the province reneging on funding for phase 2.
     
     
  #9318  
Old Posted Feb 9, 2019, 5:42 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,805
This all makes me very nervous. If design and construction is second rate, we will see more frequent shut downs than we should. Given that by design, Ottawa is going to be very dependent on the Confederation Line, we will be in big trouble whenever there is a shutdown.

I have expressed this concern before about the lack of redundancy.
     
     
  #9319  
Old Posted Feb 9, 2019, 6:27 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,682
Perhaps hope that Gatineau will build its LRT along Ottawa River too? (And yes, that said, we need to revitalize Prince of Wales Bridge.)
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
     
     
  #9320  
Old Posted Feb 9, 2019, 6:31 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by lrt's friend View Post
This all makes me very nervous. If design and construction is second rate, we will see more frequent shut downs than we should. Given that by design, Ottawa is going to be very dependent on the Confederation Line, we will be in big trouble whenever there is a shutdown.

I have expressed this concern before about the lack of redundancy.
Is there any major project these days that isn't a raging distaster? Think NYC's second Ave subway, Edmonton's metro line, ION, etc, and all signs point to the Crosstown in Toronto being yet another fiasco.

I guess we were all being a bit nïeve about the confed line being any different
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 4:24 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.